Installation Guide
Page 38
... fan is achieved only when connected to an x440 configuration. With the addition of the server that is, single chassis), connectivity is available for details. 24 IBM ^ xSeries 440 Planning and Installation Guide Two hot-swap power supplies with separate power cords. See 3.8, "Power considerations" on page 83. In the event of a fan failure, the other two fans...
... fan is achieved only when connected to an x440 configuration. With the addition of the server that is, single chassis), connectivity is available for details. 24 IBM ^ xSeries 440 Planning and Installation Guide Two hot-swap power supplies with separate power cords. See 3.8, "Power considerations" on page 83. In the event of a fan failure, the other two fans...
Installation Guide
Page 39
... swap power supplies Hot swap drive bays Diskette drive CD-ROM drive Light Path Diagnostics panel (pulls out) Figure 1-13 Front panel of the xSeries 440 USB port System-error light (amber) Information light (amber) SCSI activity light (green) Locator light (blue) 1.10 Light Path Diagnostics To limit the need to slide the server out...
... swap power supplies Hot swap drive bays Diskette drive CD-ROM drive Light Path Diagnostics panel (pulls out) Figure 1-13 Front panel of the xSeries 440 USB port System-error light (amber) Information light (amber) SCSI activity light (green) Locator light (blue) 1.10 Light Path Diagnostics To limit the need to slide the server out...
Installation Guide
Page 40
...: All known problems are Light Path Diagnostics LEDs visible through the top of the server. CPU MEMORY Light Path Diagnostics™ DASD PCI-X BUS NMI BOARD FAN TEMP EVENT LOG 1 POWER 2 SUPPLY VRM NON REDUND OVER SPEC REMIND Figure 1-14 Light Path Diagnostics panel on the ...-error LED remains in Figure 1-14. 2. Level 1 is restarted A new problem occurs, at which means it then is illuminated continuously 26 IBM ^ xSeries 440 Planning and Installation Guide For the third level of the rack. 3. By pressing the button, you acknowledge the failure but indicate that you will...
...: All known problems are Light Path Diagnostics LEDs visible through the top of the server. CPU MEMORY Light Path Diagnostics™ DASD PCI-X BUS NMI BOARD FAN TEMP EVENT LOG 1 POWER 2 SUPPLY VRM NON REDUND OVER SPEC REMIND Figure 1-14 Light Path Diagnostics panel on the ...-error LED remains in Figure 1-14. 2. Level 1 is restarted A new problem occurs, at which means it then is illuminated continuously 26 IBM ^ xSeries 440 Planning and Installation Guide For the third level of the rack. 3. By pressing the button, you acknowledge the failure but indicate that you will...
Installation Guide
Page 41
Rear of x440 External power supply ASM interconnect 10/100 (RS-485) port Ethernet port Error LED Power LED (amber) (green) Management COM port Figure 1-15 Remote Supervisor Adapter connectors The Remote Supervisor Adapter offers the following capabilities: In-band and out-of-band remote server access and alerting through IBM Director Full Web browser support...
Rear of x440 External power supply ASM interconnect 10/100 (RS-485) port Ethernet port Error LED Power LED (amber) (green) Management COM port Figure 1-15 Remote Supervisor Adapter connectors The Remote Supervisor Adapter offers the following capabilities: In-band and out-of-band remote server access and alerting through IBM Director Full Web browser support...
Installation Guide
Page 52
...interacting with suppliers, providing customer service, and tracking orders. As an application server front-end to a pSeries or zSeries database server, due to power their ERP implementation. Supply chain management Supply chain management (SCM) is a robust basis to build and implement successful ERP...a single large-scale server, which could be considered as an 38 IBM ^ xSeries 440 Planning and Installation Guide As an application server and as a database server with two-way servers such as the x330 acting as it relates to consumer. Supply chain management involves coordinating...
...interacting with suppliers, providing customer service, and tracking orders. As an application server front-end to a pSeries or zSeries database server, due to power their ERP implementation. Supply chain management Supply chain management (SCM) is a robust basis to build and implement successful ERP...a single large-scale server, which could be considered as an 38 IBM ^ xSeries 440 Planning and Installation Guide As an application server and as a database server with two-way servers such as the x330 acting as it relates to consumer. Supply chain management involves coordinating...
Installation Guide
Page 91
...with a suitable power cord for out-of the following RSA connections need to its own independent power source. We ...servers. 3.2.2 Remote Supervisor Adapter connectivity The x440 features an integrated Remote Supervisor Adapter (RSA). This document talks about the Remote Supervisor Adapter as shown in the x440. External power supply... ASM interconnect 10/100 (RS-485) port Ethernet port Error LED Power LED (amber) (green)...RSA in Figure 3-6 on page 76. - This external power supply is used during system startup and shutdown. Tip: We ...
...with a suitable power cord for out-of the following RSA connections need to its own independent power source. We ...servers. 3.2.2 Remote Supervisor Adapter connectivity The x440 features an integrated Remote Supervisor Adapter (RSA). This document talks about the Remote Supervisor Adapter as shown in the x440. External power supply... ASM interconnect 10/100 (RS-485) port Ethernet port Error LED Power LED (amber) (green)...RSA in Figure 3-6 on page 76. - This external power supply is used during system startup and shutdown. Tip: We ...
Installation Guide
Page 92
...the server as long as standard and can have 12 slots. 78 IBM ^ xSeries 440 Planning and Installation Guide For detailed instructions on cabling ASM interconnect networks, refer to section 9.11 "ASM Interconnect" in Figure 3-8 on page 79. Currently, only one RXE-100 is recommended if you will draw power from...buses of two slots each, as the 16-way), the Ethernet ports of a switch is supported per x440 server or per 16-way two-node configuration. If this power supply is not used, the RSA will need the Advanced System Management Interconnect Cable Kit (part number 03K9309) for connection...
...the server as long as standard and can have 12 slots. 78 IBM ^ xSeries 440 Planning and Installation Guide For detailed instructions on cabling ASM interconnect networks, refer to section 9.11 "ASM Interconnect" in Figure 3-8 on page 79. Currently, only one RXE-100 is recommended if you will draw power from...buses of two slots each, as the 16-way), the Ethernet ports of a switch is supported per x440 server or per 16-way two-node configuration. If this power supply is not used, the RSA will need the Advanced System Management Interconnect Cable Kit (part number 03K9309) for connection...
Installation Guide
Page 97
... (supplied with the PCI slot option kit) to connect Management A (out) Port to Management B (in the lab indicates that need to connect the ports Management A (out) and Management B (in the x440. Important: In the publication IBM RXE-100 Remote Expansion Enclosure Installation Guide, the section entitled "Attaching the enclosure to an xSeries 440 server" does...
... (supplied with the PCI slot option kit) to connect Management A (out) Port to Management B (in the lab indicates that need to connect the ports Management A (out) and Management B (in the x440. Important: In the publication IBM RXE-100 Remote Expansion Enclosure Installation Guide, the section entitled "Attaching the enclosure to an xSeries 440 server" does...
Installation Guide
Page 99
... : http://ibm.com/pc/ww/eserver/xseries/scsi_raid.html IBM Fibre Array Storage Technology The IBM Fibre Array Storage Technology (FAStT) family of up to 14 expansion units to be used in a 3U package, allowing up to 200 MBps. For more information on key components, including hot-swap fans, hard drives and redundant power supplies. Two models...
... : http://ibm.com/pc/ww/eserver/xseries/scsi_raid.html IBM Fibre Array Storage Technology The IBM Fibre Array Storage Technology (FAStT) family of up to 14 expansion units to be used in a 3U package, allowing up to 200 MBps. For more information on key components, including hot-swap fans, hard drives and redundant power supplies. Two models...
Installation Guide
Page 100
...requirement to satisfy high-end storage requirements. The IBM TotalStorage FAStT500 Storage Server The FAStT500 Storage Server is 60. All these systems. The FAStT500 Storage Server features two RAID controller units, redundant power supplies, and fans. A fan or a power supply failure will not cause loss of up to...Both models feature hot-swap and redundant power supplies and fans and you can use the two host and drive connections to provide redundant connection to the host adapters and to 220 disk drives. 86 IBM ^ xSeries 440 Planning and Installation Guide Tip: The...
...requirement to satisfy high-end storage requirements. The IBM TotalStorage FAStT500 Storage Server The FAStT500 Storage Server is 60. All these systems. The FAStT500 Storage Server features two RAID controller units, redundant power supplies, and fans. A fan or a power supply failure will not cause loss of up to...Both models feature hot-swap and redundant power supplies and fans and you can use the two host and drive connections to provide redundant connection to the host adapters and to 220 disk drives. 86 IBM ^ xSeries 440 Planning and Installation Guide Tip: The...
Installation Guide
Page 101
... also features dual hot-swappable RAID controllers, dual redundant FC disk loops, write cache mirroring, redundant hot-swappable power supplies, fans, and dual AC line cords. The IBM TotalStorage FAStT700 Storage Server The FAStT700 Storage Server is the same physical size as the FAStT500 with new higher performance controllers. As with controller-based support for...
... also features dual hot-swappable RAID controllers, dual redundant FC disk loops, write cache mirroring, redundant hot-swappable power supplies, fans, and dual AC line cords. The IBM TotalStorage FAStT700 Storage Server The FAStT700 Storage Server is the same physical size as the FAStT500 with new higher performance controllers. As with controller-based support for...
Installation Guide
Page 117
... expansion cables for connecting to install it is populated with two redundant, hot-swappable power supplies that produce 1050 W each at 220 V, or 550 W each at least 28 inches. Click Intel-based servers f. When the x440 is not recommended, since cable management then becomes an issue.... The x440 ships with more than two processors, memory, and adapters, the power supplies may not be maintained from : For EMEA: http://www.pc.ibm.com/europe/configurators/ For USA: http://www.pc.ibm.com/us/eserver/xseries/library/configtools.html For other countries or regions: a. Click Select a country ...
... expansion cables for connecting to install it is populated with two redundant, hot-swappable power supplies that produce 1050 W each at 220 V, or 550 W each at least 28 inches. Click Intel-based servers f. When the x440 is not recommended, since cable management then becomes an issue.... The x440 ships with more than two processors, memory, and adapters, the power supplies may not be maintained from : For EMEA: http://www.pc.ibm.com/europe/configurators/ For USA: http://www.pc.ibm.com/us/eserver/xseries/library/configtools.html For other countries or regions: a. Click Select a country ...
Installation Guide
Page 118
...Therefore, IBM recommends that the x440 be connected to a 220 V power source to perform the Solutions Assurance Review. If a solution contains four or more Enterprise X-Architecture servers (... m/9 ft. For technically challenging, high-risk solutions 104 IBM ^ xSeries 440 Planning and Installation Guide Tip: If power is available from one circuit should match the complexity of ...It is not redundant, the Nonredundant LED will be required to ensure power supply redundancy for all IBM solutions. EMEA and Americas information is mandatory. Procedures for attachment to ensure...
...Therefore, IBM recommends that the x440 be connected to a 220 V power source to perform the Solutions Assurance Review. If a solution contains four or more Enterprise X-Architecture servers (... m/9 ft. For technically challenging, high-risk solutions 104 IBM ^ xSeries 440 Planning and Installation Guide Tip: If power is available from one circuit should match the complexity of ...It is not redundant, the Nonredundant LED will be required to ensure power supply redundancy for all IBM solutions. EMEA and Americas information is mandatory. Procedures for attachment to ensure...
Installation Guide
Page 126
... disabled in the CD-ROM drive. 2. You can be gained from the CD. 112 IBM ^ xSeries 440 Planning and Installation Guide Before commencing the installation of Windows 2000 Server and Advanced Server. Power on the x440 with the extended CPU and PCI configurations that BIOS and firmware levels have... a blue screen trap will occur. Refer to the latest levels. The HAL for Windows 2000 Datacenter Server is supplied on device drivers required for Windows 2000 Server and Advanced Server can re-enable Hyper-Threading after Service Pack 2 or later is installed. When prompted, press any key...
... disabled in the CD-ROM drive. 2. You can be gained from the CD. 112 IBM ^ xSeries 440 Planning and Installation Guide Before commencing the installation of Windows 2000 Server and Advanced Server. Power on the x440 with the extended CPU and PCI configurations that BIOS and firmware levels have... a blue screen trap will occur. Refer to the latest levels. The HAL for Windows 2000 Datacenter Server is supplied on device drivers required for Windows 2000 Server and Advanced Server can re-enable Hyper-Threading after Service Pack 2 or later is installed. When prompted, press any key...
Installation Guide
Page 148
...Remove the adapter and have a half-height end plate. This is a hardware signal that have it repaired or replaced. 134 IBM ^ xSeries 440 Planning and Installation Guide PME Signal: PME (power management events) is because if both slots in the same bus dictate the speed that are on card in PCI-X mode (..., consult the online help. Useful for an example). However, some PCI slots can operate. Consequently, the current speed of both adapters can supply. None Hot eject successful Adapter removal completed without None error. Reboot the server and the bus will run at.
...Remove the adapter and have a half-height end plate. This is a hardware signal that have it repaired or replaced. 134 IBM ^ xSeries 440 Planning and Installation Guide PME Signal: PME (power management events) is because if both slots in the same bus dictate the speed that are on card in PCI-X mode (..., consult the online help. Useful for an example). However, some PCI slots can operate. Consequently, the current speed of both adapters can supply. None Hot eject successful Adapter removal completed without None error. Reboot the server and the bus will run at.
Installation Guide
Page 196
...analytical processing 39 Onyx 39 operating systems 28, 90 device drivers 111 Linux 97, 119 NetWare 97, 121 VMware ESX Server 98, 128 Windows .NET 97 Windows 2000 96, 112 Windows NT 4.0 EE 95 Oracle 37-38, 40 P ...configuration 67 physical consolidation 51 physical partitioning 7 pipeline 16 planning 63-105 ports 65 positioning 35-61 power redundancy 103 power supplies 24-25 Prestonia 12, 64 ProcCon 168 Process Control 155-172 advanced options 170 affinity 163 alias ... affinity 163 processors 12, 64 product line 2 product publications 128 182 IBM ^ xSeries 440 Planning and Installation Guide
...analytical processing 39 Onyx 39 operating systems 28, 90 device drivers 111 Linux 97, 119 NetWare 97, 121 VMware ESX Server 98, 128 Windows .NET 97 Windows 2000 96, 112 Windows NT 4.0 EE 95 Oracle 37-38, 40 P ...configuration 67 physical consolidation 51 physical partitioning 7 pipeline 16 planning 63-105 ports 65 positioning 35-61 power redundancy 103 power supplies 24-25 Prestonia 12, 64 ProcCon 168 Process Control 155-172 advanced options 170 affinity 163 alias ... affinity 163 processors 12, 64 product line 2 product publications 128 182 IBM ^ xSeries 440 Planning and Installation Guide