Hardware Installation Guide
Page 6
... Power Connectors 1-21 Internal Power Supply Connector 1-21 DC Power Connector 1-21 Cisco RPS Connector 1-22 Console Port 1-23 2 C H A P T E R Installation 2-1 Preparing for Installation 2-1 Warnings 2-1 EMC Regulatory Statements 2-4 U.S.A. 2-4 Taiwan 2-4 Japan 2-5 Korea 2-5 Hungary 2-6 Installation Guidelines 2-6 Verifying Package Contents 2-7 Installing the Switch on a Table or Shelf 2-9 Installing the Switch in a Rack 2-9 Removing Screws from the Switch 2-11 Attaching the Brackets to a Catalyst...
... Power Connectors 1-21 Internal Power Supply Connector 1-21 DC Power Connector 1-21 Cisco RPS Connector 1-22 Console Port 1-23 2 C H A P T E R Installation 2-1 Preparing for Installation 2-1 Warnings 2-1 EMC Regulatory Statements 2-4 U.S.A. 2-4 Taiwan 2-4 Japan 2-5 Korea 2-5 Hungary 2-6 Installation Guidelines 2-6 Verifying Package Contents 2-7 Installing the Switch on a Table or Shelf 2-9 Installing the Switch in a Rack 2-9 Removing Screws from the Switch 2-11 Attaching the Brackets to a Catalyst...
Hardware Installation Guide
Page 8
... Identifying a Rollover Cable B-6 Connecting to a PC B-6 Connecting to a Terminal B-7 Translated Safety Warnings C-1 Attaching the Cisco RPS (model PWR600-AC-RPS) C-1 Attaching the Cisco RPS (model PWR300-AC-RPS-N1) C-2 Qualified Personnel Warning C-3 Installation Warning C-4 Jewelry Removal Warning C-5 Stacking the... C-9 TN Power Warning C-10 Ground Connection Warning C-11 Circuit Breaker (15A) Warning C-12 Grounded Equipment Warning C-14 Supply Circuit Warning C-15 Voltage Warning C-16 Power Supply Warning C-17 Lightning Activity Warning C-19 Product Disposal Warning C-21 Catalyst 2900 Series ...
... Identifying a Rollover Cable B-6 Connecting to a PC B-6 Connecting to a Terminal B-7 Translated Safety Warnings C-1 Attaching the Cisco RPS (model PWR600-AC-RPS) C-1 Attaching the Cisco RPS (model PWR300-AC-RPS-N1) C-2 Qualified Personnel Warning C-3 Installation Warning C-4 Jewelry Removal Warning C-5 Stacking the... C-9 TN Power Warning C-10 Ground Connection Warning C-11 Circuit Breaker (15A) Warning C-12 Grounded Equipment Warning C-14 Supply Circuit Warning C-15 Voltage Warning C-16 Power Supply Warning C-17 Lightning Activity Warning C-19 Product Disposal Warning C-21 Catalyst 2900 Series ...
Hardware Installation Guide
Page 33
.... • The fan in standby mode. If the switch power supply fails, the switch powers down and after 15 seconds restarts, using power from the RPS. Note This is operational. For more information see the "Cisco RPS Connector" section on the Catalyst 2912 LRE XL and 2924 LRE XL Switches Color Off Solid green Blinking green RPS Status RPS...
.... • The fan in standby mode. If the switch power supply fails, the switch powers down and after 15 seconds restarts, using power from the RPS. Note This is operational. For more information see the "Cisco RPS Connector" section on the Catalyst 2912 LRE XL and 2924 LRE XL Switches Color Off Solid green Blinking green RPS Status RPS...
Hardware Installation Guide
Page 34
These port LEDs, as a group or individually, display information about the switch and about the individual ports. This is highlighted. Contact Cisco Systems. The internal power supply in use by the switch. (See Figure 1-8.) The port duplex mode: full duplex or half duplex, and default modes: ...8226; 10/100 ports: auto • 100BaseFX ports: auto • Gigabit ports: auto The port operating speed: 10 or 100 Mbps. 1-14 Catalyst...
These port LEDs, as a group or individually, display information about the switch and about the individual ports. This is highlighted. Contact Cisco Systems. The internal power supply in use by the switch. (See Figure 1-8.) The port duplex mode: full duplex or half duplex, and default modes: ...8226; 10/100 ports: auto • 100BaseFX ports: auto • Gigabit ports: auto The port operating speed: 10 or 100 Mbps. 1-14 Catalyst...
Hardware Installation Guide
Page 41
... G DC INPUT ICNUPRURTE: 3N6T:- 72 4-2A A +- Note The Cisco RPS does not support the Catalyst 2924M XL DC switch. If you plan to use the internal power supply, use the supplied AC power cord to connect the AC power connector to the switch either through the internal power supply or through the Cisco RPS. It has dual feeds (A and B) that supports input...
... G DC INPUT ICNUPRURTE: 3N6T:- 72 4-2A A +- Note The Cisco RPS does not support the Catalyst 2924M XL DC switch. If you plan to use the internal power supply, use the supplied AC power cord to connect the AC power connector to the switch either through the internal power supply or through the Cisco RPS. It has dual feeds (A and B) that supports input...
Hardware Installation Guide
Page 42
... has an input supply voltage from -36 to -72 VDC. The switches do not recommend the redundant-with-reboot configuration. Power Connectors Chapter 1 Product Overview Caution You must connect the Catalyst 2924M XL DC switch only to a DC-input power source that use up to 150W DC each. For more information on RPS. Cisco RPS Connector Specific...
... has an input supply voltage from -36 to -72 VDC. The switches do not recommend the redundant-with-reboot configuration. Power Connectors Chapter 1 Product Overview Caution You must connect the Catalyst 2924M XL DC switch only to a DC-input power source that use up to 150W DC each. For more information on RPS. Cisco RPS Connector Specific...
Hardware Installation Guide
Page 43
... Connector on the Catalyst 2912 LRE and 2924 LRE XL Switches The RPS is a 300W redundant power system that adapter from Cisco. Note The RPS can connect a switch to one switch at the same time, any subsequent switch is not supported by using the supplied rollover cable and DB-9 adapter. It automatically senses when the power supply of a connected device...
... Connector on the Catalyst 2912 LRE and 2924 LRE XL Switches The RPS is a 300W redundant power system that adapter from Cisco. Note The RPS can connect a switch to one switch at the same time, any subsequent switch is not supported by using the supplied rollover cable and DB-9 adapter. It automatically senses when the power supply of a connected device...
Hardware Installation Guide
Page 47
... or connect or disconnect cables during normal use. For systems without a power switch, line voltages are present within the power supply when the power cord is not overloaded. Warning Do not work on the phase conductors (all national laws and regulations. 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide 2-3 Warning Ultimate disposal of lightning...
... or connect or disconnect cables during normal use. For systems without a power switch, line voltages are present within the power supply when the power cord is not overloaded. Warning Do not work on the phase conductors (all national laws and regulations. 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide 2-3 Warning Ultimate disposal of lightning...
Hardware Installation Guide
Page 53
...holes to the recessed areas on the table or shelf near an AC power source. Note Figure 2-1 shows brackets for one-rack-unit switches. 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide 2-9 Installing the Switch in a Rack Warning To prevent bodily injury when mounting or servicing ... remains stable. The following guidelines are similar on brackets for two-rack-unit modular switches. The supplied rack-mounting brackets can be mounted at the bottom of the unit. After the switch is provided with the rubber feet in the mounting-kit envelope. Chapter 2 Installation ...
...holes to the recessed areas on the table or shelf near an AC power source. Note Figure 2-1 shows brackets for one-rack-unit switches. 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide 2-9 Installing the Switch in a Rack Warning To prevent bodily injury when mounting or servicing ... remains stable. The following guidelines are similar on brackets for two-rack-unit modular switches. The supplied rack-mounting brackets can be mounted at the bottom of the unit. After the switch is provided with the rubber feet in the mounting-kit envelope. Chapter 2 Installation ...
Hardware Installation Guide
Page 63
... Guide 2-19 Chapter 2 Installation Figure 2-11 Mounting the Switch in a Rack Installing the Switch in a Rack MODE 1X 2X 3X 4X 5X 6X 7X 8X 9X 10X 10BaseT/100Ba1s0e0TBXaseFX 11X 12X 13X 14X 16X 17X 18X 19X 20X 21X Catalyst 2900 SERIES XL 22X 23X 24X Phillips machine screws 47301 ... 19-, 23-, or 24-inch rack, use the supplied black screw as described in the rack. Attaching the Optional Cable Guide We recommend attaching the cable guide to the left or right bracket. If the switch is mounted in the rack, power the switch as shown in Figure 2-12 to attach the cable...
... Guide 2-19 Chapter 2 Installation Figure 2-11 Mounting the Switch in a Rack Installing the Switch in a Rack MODE 1X 2X 3X 4X 5X 6X 7X 8X 9X 10X 10BaseT/100Ba1s0e0TBXaseFX 11X 12X 13X 14X 16X 17X 18X 19X 20X 21X Catalyst 2900 SERIES XL 22X 23X 24X Phillips machine screws 47301 ... 19-, 23-, or 24-inch rack, use the supplied black screw as described in the rack. Attaching the Optional Cable Guide We recommend attaching the cable guide to the left or right bracket. If the switch is mounted in the rack, power the switch as shown in Figure 2-12 to attach the cable...
Hardware Installation Guide
Page 68
...seconds, and then they turn green. Powering On the Switch and Running POST To power on the switch after you install it begins POST, a series of the AC power cord to ensure that run automatically to the AC power connector on page 2-24. Catalyst 2900 Series XL Hardware Installation Guide 78...-6461-04 SERIES 16x 17x 18x 19x 20x 21x 22x 23x 24x Powering On the Switch and Running POST Figure 2-16 Mounting a Modular Switch to a Wall Vertical wall stud User-supplied screws User-supplied screws ...
...seconds, and then they turn green. Powering On the Switch and Running POST To power on the switch after you install it begins POST, a series of the AC power cord to ensure that run automatically to the AC power connector on page 2-24. Catalyst 2900 Series XL Hardware Installation Guide 78...-6461-04 SERIES 16x 17x 18x 19x 20x 21x 22x 23x 24x Powering On the Switch and Running POST Figure 2-16 Mounting a Modular Switch to a Wall Vertical wall stud User-supplied screws User-supplied screws ...
Hardware Installation Guide
Page 159
... (telco rack-mount) modules 1-8 mounting brackets 2-9 attaching 2-11, 2-15, 2-22 N no on/off switch warning C-24 O overtemperature warning C-9 P PC, connecting to switch 2-42 performance problems, solving 3-3 personnel warning C-3 pinouts 10/100BASE-T ports B-2 cable, straight-through and crossover...16 to 1-18 POST results 2-24 power connecting to 2-24 warning C-15 power connectors 1-21 power on 2-24 power supply AC power outlet 1-21 RPS connector 1-21 warning C-17 product disposal warning C-21 Q qualified personnel warning C-3 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide ...
... (telco rack-mount) modules 1-8 mounting brackets 2-9 attaching 2-11, 2-15, 2-22 N no on/off switch warning C-24 O overtemperature warning C-9 P PC, connecting to switch 2-42 performance problems, solving 3-3 personnel warning C-3 pinouts 10/100BASE-T ports B-2 cable, straight-through and crossover...16 to 1-18 POST results 2-24 power connecting to 2-24 warning C-15 power connectors 1-21 power on 2-24 power supply AC power outlet 1-21 RPS connector 1-21 warning C-17 product disposal warning C-21 Q qualified personnel warning C-3 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide ...
Hardware Installation Guide
Page 160
... cables straight-through B-4 SunNet Manager 1-4 supply circuit warning C-15 switch powering on 2-24 switched ports, module 1-8 System LED 1-12 T telco racks 2-15 telephone network power warning See TN power warning C-10 temperature maximum for installation 2-7, A-2 warning C-9 temperature warning C-9 terminal, connecting to switch 2-42 terminal adapter pinouts RH-45-to-RJ-45 B-7 IN-6 Catalyst 2900 Series XL Hardware Installation...
... cables straight-through B-4 SunNet Manager 1-4 supply circuit warning C-15 switch powering on 2-24 switched ports, module 1-8 System LED 1-12 T telco racks 2-15 telephone network power warning See TN power warning C-10 temperature maximum for installation 2-7, A-2 warning C-9 temperature warning C-9 terminal, connecting to switch 2-42 terminal adapter pinouts RH-45-to-RJ-45 B-7 IN-6 Catalyst 2900 Series XL Hardware Installation...