EN516 Installation Guide
Page 2
... This equipment has been tested and found to comply with the application of shielded data cables. EN 55 022 Declaration of the product(s) or circuit layout(s) described herein. Lesen Sie dazu bitte die...228;tigung des Herstellers/Importeurs Es wird hiermit bestätigt, daß das NETGEAR Model EN516 Ethernet Hub gemäß der im BMPT-AmtsblVfg 243/1991 und Vfg 46/1992 aufgefü.../or reliability, NETGEAR reserves the right to make changes to the products described in this equipment in a residential area is not installed and used in accordance with the instruction manual, it may...
... This equipment has been tested and found to comply with the application of shielded data cables. EN 55 022 Declaration of the product(s) or circuit layout(s) described herein. Lesen Sie dazu bitte die...228;tigung des Herstellers/Importeurs Es wird hiermit bestätigt, daß das NETGEAR Model EN516 Ethernet Hub gemäß der im BMPT-AmtsblVfg 243/1991 und Vfg 46/1992 aufgefü.../or reliability, NETGEAR reserves the right to make changes to the products described in this equipment in a residential area is not installed and used in accordance with the instruction manual, it may...
EN516 Installation Guide
Page 17
... site • Package contents • Required tools • Installing the hub • Connecting the hub • Completing and verifying the installation Preparing the Site Before you begin installing the Model EN516 hub, prepare the installation site. The maximum relative humidity must be connected are... connecting cables and power and for monitoring the LED indicators. You should contain the following items: • Model EN516 hub • This manual Installation 3-1 Make sure the operating environment meets the physical requirements of all units to be between 0°C and 40...
... site • Package contents • Required tools • Installing the hub • Connecting the hub • Completing and verifying the installation Preparing the Site Before you begin installing the Model EN516 hub, prepare the installation site. The maximum relative humidity must be connected are... connecting cables and power and for monitoring the LED indicators. You should contain the following items: • Model EN516 hub • This manual Installation 3-1 Make sure the operating environment meets the physical requirements of all units to be between 0°C and 40...