Brocade 6520 Hardware Referencce Manual
Page 18
... 61000-4-5 surge voltage requirements and are autoranging in fans for the Brocade 6520. 6 Brocade 6520 Hardware Reference Manual 53-1002705-01 2 Installation and safety considerations Installation and safety considerations You can install the Brocade 6520 switch in the following requirements: • The primary outlets are... strap connected to the indicated area on a flat surface. • In an EIA rack using a four-post sliding rail rack mount kit. Power supply specifications The power supplies are universal and capable of accommodating input voltages and line frequencies. Each...
... 61000-4-5 surge voltage requirements and are autoranging in fans for the Brocade 6520. 6 Brocade 6520 Hardware Reference Manual 53-1002705-01 2 Installation and safety considerations Installation and safety considerations You can install the Brocade 6520 switch in the following requirements: • The primary outlets are... strap connected to the indicated area on a flat surface. • In an EIA rack using a four-post sliding rail rack mount kit. Power supply specifications The power supplies are universal and capable of accommodating input voltages and line frequencies. Each...
Brocade 6520 Hardware Referencce Manual
Page 20
...and operation of the switch in Table 5 must be met. Table 5 lists the acceptable environmental ranges for details. 8 Brocade 6520 Hardware Reference Manual 53-1002705-01 Note that you install the switch with the intake side, as during non-operation Ambient temperature..., ensure the following environmental requirements are three rack kit options that accommodate the Brocade 6520, a four-post fixed rack kit, a two-post Telco rack kit, and a four-post sliding rail rack kit. TABLE 5 Environmental requirements Condition Acceptable during operation Acceptable during transportation ...
...and operation of the switch in Table 5 must be met. Table 5 lists the acceptable environmental ranges for details. 8 Brocade 6520 Hardware Reference Manual 53-1002705-01 Note that you install the switch with the intake side, as during non-operation Ambient temperature..., ensure the following environmental requirements are three rack kit options that accommodate the Brocade 6520, a four-post fixed rack kit, a two-post Telco rack kit, and a four-post sliding rail rack kit. TABLE 5 Environmental requirements Condition Acceptable during operation Acceptable during transportation ...