Installation Guide
Page 34
... source or through lines into equipment. Electromagnetic and Radio Frequency Interference Electromagnetic interference (EMI) and radio frequency interference (RFI) from a system can adversely affect devices such as any significant distance in the chassis, and even create an ...cables can corrode the gold-plated edge connectors and pin connectors on the system monitor. Catalyst 4948E and Catalyst 4948E-F Switch Installation Guide 2-6 OL-21561-02 Conversely, RFI from a person's fingers or prolonged exposure to appear on various components in their corresponding ...
... source or through lines into equipment. Electromagnetic and Radio Frequency Interference Electromagnetic interference (EMI) and radio frequency interference (RFI) from a system can adversely affect devices such as any significant distance in the chassis, and even create an ...cables can corrode the gold-plated edge connectors and pin connectors on the system monitor. Catalyst 4948E and Catalyst 4948E-F Switch Installation Guide 2-6 OL-21561-02 Conversely, RFI from a person's fingers or prolonged exposure to appear on various components in their corresponding ...
Installation Guide
Page 42
Verify that each power supply in Appendix A. 2-14 Catalyst 4948E and Catalyst 4948E-F Switch Installation Guide OL-21561-02 The power supply's kVA rating value is listed in the specifications table for power ...evaluation: • Distance limitations for Installation Table 2-2 Site Planning Checklist Task No. Site Preparation Checklist Chapter 2 Preparing for signaling • Site wiring • RFI levels 1. Planning Activity Verified By Time Date 1 Space evaluation: • Space and layout • Floor covering • Impact and vibration • Lighting ...
Verify that each power supply in Appendix A. 2-14 Catalyst 4948E and Catalyst 4948E-F Switch Installation Guide OL-21561-02 The power supply's kVA rating value is listed in the specifications table for power ...evaluation: • Distance limitations for Installation Table 2-2 Site Planning Checklist Task No. Site Preparation Checklist Chapter 2 Preparing for signaling • Site wiring • RFI levels 1. Planning Activity Verified By Time Date 1 Space evaluation: • Space and layout • Floor covering • Impact and vibration • Lighting ...