Hardware Owner's Manual (PDF)
Page 11
Front-Panel LED Indicators, Buttons, and Connectors Ite Indicator, Button, or Connector Icon m 1 Power-on the front and back blinks until one of a paper clip. Figure 1-1. Use this ...
Front-Panel LED Indicators, Buttons, and Connectors Ite Indicator, Button, or Connector Icon m 1 Power-on the front and back blinks until one of a paper clip. Figure 1-1. Use this ...
Hardware Owner's Manual (PDF)
Page 12
... to the system. 7 Hard drives (optional) 8 Optical drive (optional) NOTE: DVD devices are configured with power supplies, fans, system temperature, or hard drives. Front-Panel LED Indicators, Buttons, and Connectors (continued) Ite Indicator, Button, or Connector Icon m 4 LCD display 5 USB connectors (2) Description Provides system ID, status information, and system error messages...
... to the system. 7 Hard drives (optional) 8 Optical drive (optional) NOTE: DVD devices are configured with power supplies, fans, system temperature, or hard drives. Front-Panel LED Indicators, Buttons, and Connectors (continued) Ite Indicator, Button, or Connector Icon m 4 LCD display 5 USB connectors (2) Description Provides system ID, status information, and system error messages...
Hardware Owner's Manual (PDF)
Page 150
.... An area in a board. mirroring - ms - MS-DOS® - K - Kilobit(s); 1024 bits. KVM - Keyboard/video/mouse. Meter(s). Megabit(s); 1,048,576 bits. memory module - memory - Kilohertz. LED - local bus - Low voltage differential. Milliampere(s). MB - Millimeter(s). Microsoft Disk Operating System. 150 Glossary Local area network. LCD - Unlike the PGA interface, the LGA interface...
.... An area in a board. mirroring - ms - MS-DOS® - K - Kilobit(s); 1024 bits. KVM - Keyboard/video/mouse. Meter(s). Megabit(s); 1,048,576 bits. memory module - memory - Kilohertz. LED - local bus - Low voltage differential. Milliampere(s). MB - Millimeter(s). Microsoft Disk Operating System. 150 Glossary Local area network. LCD - Unlike the PGA interface, the LGA interface...
Rack Installation Guide
Page 26
Figure 1-14. Route the system status-indicator cable through the cable-management arm and insert the LED end into the slot on the end of the cable-management arm. 3 Attach the I/O cable connectors and power cable connectors to their respective connectors on ...
Figure 1-14. Route the system status-indicator cable through the cable-management arm and insert the LED end into the slot on the end of the cable-management arm. 3 Attach the I/O cable connectors and power cable connectors to their respective connectors on ...