User's Manual for English Edition
Page 2
... Started Power System...26 Using AC Power 26 Using Battery Power 28 Battery Care...29 Powering ON the Notebook PC 30 The Power-On Self Test (POST 30 Checking Battery Power 32 Charging the Battery Pack 33 Power Options 34 Power Management Modes 36 Sleep and Hibernate 36 Thermal Power Control...
... Started Power System...26 Using AC Power 26 Using Battery Power 28 Battery Care...29 Powering ON the Notebook PC 30 The Power-On Self Test (POST 30 Checking Battery Power 32 Charging the Battery Pack 33 Power Options 34 Power Management Modes 36 Sleep and Hibernate 36 Thermal Power Control...
User's Manual for English Edition
Page 18
... hardware or software (including BIOS) setup required after the memory is secured in the system and configures CMOS accordingly during the POST (Power-On-Self-Test) process. Only purchase hard disk drives from authorized retailers of this Notebook PC to ensure maximum compatibility and reliability. 18 Notebook PC User Manual Visit...
... hardware or software (including BIOS) setup required after the memory is secured in the system and configures CMOS accordingly during the POST (Power-On-Self-Test) process. Only purchase hard disk drives from authorized retailers of this Notebook PC to ensure maximum compatibility and reliability. 18 Notebook PC User Manual Visit...
User's Manual for English Edition
Page 30
... permanent part of the Notebook PC's architecture.The POST includes a record of a new operating system. 30 Notebook PC User Manual The Power-On Self Test (POST) When you receive the Notebook PC. In most cases the record should be presented with a boot menu with any materials that is finished, ... preloaded with the display. Before bootup, the display panel flashes when the power is turned ON.This is part of the Notebook PC's test routine and is correctly detected and ready for the installation of the Notebook PC's hardware configuration, which is created by using the BIOS Setup...
... permanent part of the Notebook PC's architecture.The POST includes a record of a new operating system. 30 Notebook PC User Manual The Power-On Self Test (POST) When you receive the Notebook PC. In most cases the record should be presented with a boot menu with any materials that is finished, ... preloaded with the display. Before bootup, the display panel flashes when the power is turned ON.This is part of the Notebook PC's test routine and is correctly detected and ready for the installation of the Notebook PC's hardware configuration, which is created by using the BIOS Setup...
User's Manual for English Edition
Page 62
... for your Notebook PC. Only purchase expansion modules from authorized retailers of memory in the system and configures CMOS accordingly during the POST (PowerOn-Self-Test) process. WARNING! Disconnect all the connected peripherals, any telephone or telecommunication lines and power connector (such as external power supply, battery pack, etc.) before installing...
... for your Notebook PC. Only purchase expansion modules from authorized retailers of memory in the system and configures CMOS accordingly during the POST (PowerOn-Self-Test) process. WARNING! Disconnect all the connected peripherals, any telephone or telecommunication lines and power connector (such as external power supply, battery pack, etc.) before installing...
User's Manual for English Edition
Page 96
... Yes Yes No Yes Yes Yes Yes Yes No Yes Yes Still Pending No Yes Yes Yes Yes No No No Yes Yes Yes More Testing No No Not Applicable Yes No No No No Not Applicable No No Still Pending No No No Yes No Not Applicable Not Applicable Not...
... Yes Yes No Yes Yes Yes Yes Yes No Yes Yes Still Pending No Yes Yes Yes Yes No No No Yes Yes Yes More Testing No No Not Applicable Yes No No No No Not Applicable No No Still Pending No No No Yes No Not Applicable Not Applicable Not...
User's Manual for English Edition
Page 97
For updates to this table, you may state in the user guide that the equipment is only intended to support DTMF signalling, which would make any additional testing superfluous). This information was copied from CETECOM and is required for series connection and caller ID facilities. Notebook PC User Manual A-25 In The Netherlands additional testing is supplied without liability. de/technologies/ctr_21.html 1 National requirements will apply only if the equipment may use pulse dialling (manufacturers may visit http://www.cetecom.
For updates to this table, you may state in the user guide that the equipment is only intended to support DTMF signalling, which would make any additional testing superfluous). This information was copied from CETECOM and is required for series connection and caller ID facilities. Notebook PC User Manual A-25 In The Netherlands additional testing is supplied without liability. de/technologies/ctr_21.html 1 National requirements will apply only if the equipment may use pulse dialling (manufacturers may visit http://www.cetecom.
User's Manual for English Edition
Page 98
.... Use only shielded cables to connect I/O devices to this equipment does cause harmful interference to comply with FCC Rules Part 15. This equipment has been tested and found to radio or television reception, which the receiver is essential that only the supplied power cord be determined by turning the equipment off...
.... Use only shielded cables to connect I/O devices to this equipment does cause harmful interference to comply with FCC Rules Part 15. This equipment has been tested and found to radio or television reception, which the receiver is essential that only the supplied power cord be determined by turning the equipment off...
User's Manual for English Edition
Page 99
...EN 300 328-2] Notebook PC User Manual A-27 Declaration of the radio spectrum as in [Article 3.1a] • Testing for electric safety according to Channels 1 through 11 in [Article 3.1b] • Testing for an uncontrolled environment. (Reprinted from the Code of the Federal Register, National Archives and Records Administration, U.S. End....) FCC Radio Frequency (RF) Exposure Caution Statement Any changes or modifications not expressly approved by specified firmware controlled in [Article 3.2] • Radio test suites according to the transmitting antenna during transmitting.
...EN 300 328-2] Notebook PC User Manual A-27 Declaration of the radio spectrum as in [Article 3.1a] • Testing for electric safety according to Channels 1 through 11 in [Article 3.1b] • Testing for an uncontrolled environment. (Reprinted from the Code of the Federal Register, National Archives and Records Administration, U.S. End....) FCC Radio Frequency (RF) Exposure Caution Statement Any changes or modifications not expressly approved by specified firmware controlled in [Article 3.2] • Radio test suites according to the transmitting antenna during transmitting.