Hardware Installation Guide
Page 7
... a Wall 2-22 Powering On the Switch and Running POST 2-24 Connecting to DC Power 2-25 Preparing for Installation 2-25 Grounding the Switch 2-26 Wiring the DC-Input Power Source 2-29 Connecting to a 10/100 Port 2-35 Connecting to a 100BASE-FX Port 2-37 Connecting to an LRE Port 2-38 Connecting to a Module Port 2-42 Connecting to the Console...
... a Wall 2-22 Powering On the Switch and Running POST 2-24 Connecting to DC Power 2-25 Preparing for Installation 2-25 Grounding the Switch 2-26 Wiring the DC-Input Power Source 2-29 Connecting to a 10/100 Port 2-35 Connecting to a 100BASE-FX Port 2-37 Connecting to an LRE Port 2-38 Connecting to a Module Port 2-42 Connecting to the Console...
Hardware Installation Guide
Page 22
... mode (ATM) modules • On the Catalyst 2924M XL DC switch, a direct current (DC) power converter • On the Catalyst 2912 LRE XL and 2924 LRE XL switches, up to 24 LRE ports through one RJ-21 connector and hot swapping capability with the Cisco LRE customer premises equipment (CPE) devices •...; Supports up to 2048 MAC addresses on the Catalyst 2924 XL, 2924C XL, ...
... mode (ATM) modules • On the Catalyst 2924M XL DC switch, a direct current (DC) power converter • On the Catalyst 2912 LRE XL and 2924 LRE XL switches, up to 24 LRE ports through one RJ-21 connector and hot swapping capability with the Cisco LRE customer premises equipment (CPE) devices •...; Supports up to 2048 MAC addresses on the Catalyst 2924 XL, 2924C XL, ...
Hardware Installation Guide
Page 23
Chapter 1 Product Overview Figure 1-1 Catalyst 2900 Series XL Switches Version Number Description WS-C2912-LRE-XL 4 fixed autosensing 10/100 ports INPUT OUTPUT PWR PWR RESET TEMP FAN 9X 10X 11X 12X 12 LRE ports Cisco RPS 300 WS-C2924-LRE-XL 4 fixed autosensing 10/100 ports 24 LRE ports INPUT OUTPUT PWR PWR RESET TEMP FAN 9X 10X...
Chapter 1 Product Overview Figure 1-1 Catalyst 2900 Series XL Switches Version Number Description WS-C2912-LRE-XL 4 fixed autosensing 10/100 ports INPUT OUTPUT PWR PWR RESET TEMP FAN 9X 10X 11X 12X 12 LRE ports Cisco RPS 300 WS-C2924-LRE-XL 4 fixed autosensing 10/100 ports 24 LRE ports INPUT OUTPUT PWR PWR RESET TEMP FAN 9X 10X...
Hardware Installation Guide
Page 25
... 19X 20X 21X 22X Catalyst10209B0AS0ES-FEXRIES XL 23 24 10/100 ports 100BASE-FX ports Figure 1-3 Catalyst 2900 XL 100BASE-FX ports and Module Slots Expansion slots 47286 12 1 MODE 2 3 Catalyst 2900 SERIES XL 4 5 100BASE-FX 6 7 8 9 10 11 12 100BASE-FX ports Figure 1-4 Catalyst 2900 LRE XL 10/100 and LRE Ports INPUT OUTPUT PWR PWR RESET TEMP FAN...
... 19X 20X 21X 22X Catalyst10209B0AS0ES-FEXRIES XL 23 24 10/100 ports 100BASE-FX ports Figure 1-3 Catalyst 2900 XL 100BASE-FX ports and Module Slots Expansion slots 47286 12 1 MODE 2 3 Catalyst 2900 SERIES XL 4 5 100BASE-FX 6 7 8 9 10 11 12 100BASE-FX ports Figure 1-4 Catalyst 2900 LRE XL 10/100 and LRE Ports INPUT OUTPUT PWR PWR RESET TEMP FAN...
Hardware Installation Guide
Page 27
... about configuring the LRE ports, refer to 24 Cisco LRE customer premises equipment (CPE) devices though structured or unstructured wiring, such as LRE traffic, the LRE port must be used. If the other switch ports. The link between the switch and the attached device can be up to the Catalyst 2900 Series XL and Catalyst 3500 Series XL Software...
... about configuring the LRE ports, refer to 24 Cisco LRE customer premises equipment (CPE) devices though structured or unstructured wiring, such as LRE traffic, the LRE port must be used. If the other switch ports. The link between the switch and the attached device can be up to the Catalyst 2900 Series XL and Catalyst 3500 Series XL Software...
Hardware Installation Guide
Page 32
... Figure 1-7 Catalyst 2912 LRE XL and 2924 LRE XL LEDs 10/100 port LEDs Chapter 1 Product Overview SYSTEM RPS MODE LRE STAT DUPLX SPEED Mode button 1X 2X 3X 4X System LED RPS LED LRE LED STAT LED DUPLEX LED Speed LED LRE port LEDs 1-12 LRE port LEDs 13-24 48002 System...lists the LED colors and their meanings. For information on the System LED colors during POST, see the "Powering On the Switch and Running POST" section on page 2-24. 1-12 Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04 Table 1-2 System LED Color Off Green Amber System Status System is operating ...
... Figure 1-7 Catalyst 2912 LRE XL and 2924 LRE XL LEDs 10/100 port LEDs Chapter 1 Product Overview SYSTEM RPS MODE LRE STAT DUPLX SPEED Mode button 1X 2X 3X 4X System LED RPS LED LRE LED STAT LED DUPLEX LED Speed LED LRE port LEDs 1-12 LRE port LEDs 13-24 48002 System...lists the LED colors and their meanings. For information on the System LED colors during POST, see the "Powering On the Switch and Running POST" section on page 2-24. 1-12 Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04 Table 1-2 System LED Color Off Green Amber System Status System is operating ...
Hardware Installation Guide
Page 38
...Switches (continued) Port Mode SPEED Port LED Color Cisco IOS Release 12.0(5.x)WC1/ WC21 Description Cisco IOS Release 12.0(5.x)WC42 3 Cyan (off) Cyan (off) LRE port or remote CPE Ethernet port is operating at 10 Mbps. Front-Panel Description Chapter 1 Product Overview Table 1-7 Meanings of Port Status LEDs for Different Modes on Catalyst 2900 LRE XL switches with Cisco... 12.5 -24%+ 25 - 49%+ 50%+ Catalyst 2900 SERIES XL 1-18 Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04 To verify the LRE CPE Ethernet link status from a switch with Cisco IOS Release 12...
...Switches (continued) Port Mode SPEED Port LED Color Cisco IOS Release 12.0(5.x)WC1/ WC21 Description Cisco IOS Release 12.0(5.x)WC42 3 Cyan (off) Cyan (off) LRE port or remote CPE Ethernet port is operating at 10 Mbps. Front-Panel Description Chapter 1 Product Overview Table 1-7 Meanings of Port Status LEDs for Different Modes on Catalyst 2900 LRE XL switches with Cisco... 12.5 -24%+ 25 - 49%+ 50%+ Catalyst 2900 SERIES XL 1-18 Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04 To verify the LRE CPE Ethernet link status from a switch with Cisco IOS Release 12...
Hardware Installation Guide
Page 50
... 328 feet (100 meters). • For 100BASE-FX ports, cable lengths from the switch to connected devices are up to 1351 feet (412 meters) for half-duplex connections and less than 6561 feet (2 kilometers) for full-duplex connections. Catalyst 2900 Series XL Hardware Installation Guide 2-6 78-6461-04...alkalmazását. Follow the procedures in a rack, or on page 2-24. Warning Unplug the power cord before you work on a system that the switch is operational by powering it on /off switch. Before installing the switch, first verify that does not have an on and running POST. When ...
... 328 feet (100 meters). • For 100BASE-FX ports, cable lengths from the switch to connected devices are up to 1351 feet (412 meters) for half-duplex connections and less than 6561 feet (2 kilometers) for full-duplex connections. Catalyst 2900 Series XL Hardware Installation Guide 2-6 78-6461-04...alkalmazását. Follow the procedures in a rack, or on page 2-24. Warning Unplug the power cord before you work on a system that the switch is operational by powering it on /off switch. Before installing the switch, first verify that does not have an on and running POST. When ...
Hardware Installation Guide
Page 55
..., you are attaching the brackets for a 19-, 23-, or 24-inch rack. Use two of the supplied screws to attach each bracket, according to remove the chassis screws in a fixed-port and a modular port switch. Figure 2-3 shows how to rack size: 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide 2-11 Chapter 2 Installation Installing...
..., you are attaching the brackets for a 19-, 23-, or 24-inch rack. Use two of the supplied screws to attach each bracket, according to remove the chassis screws in a fixed-port and a modular port switch. Figure 2-3 shows how to rack size: 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide 2-11 Chapter 2 Installation Installing...
Hardware Installation Guide
Page 56
... to the opposite side of the switch. Figure 2-4 Attaching Brackets on Catalyst 2912 XL, 2924C XL, and 2924 XL Fixed-Port Switches (Front-Panel Forward) Phillips flat-head screws Phillips truss-head screws 19" configuration MODE 1X 2X 3X 4X 5X 6X 7X 47738 23" and 24" configuration MODE 1X 2X 3X 4X... 5X 6X 7X 2-12 Catalyst 2900 Series XL Hardware Installation Guide 78-...
... to the opposite side of the switch. Figure 2-4 Attaching Brackets on Catalyst 2912 XL, 2924C XL, and 2924 XL Fixed-Port Switches (Front-Panel Forward) Phillips flat-head screws Phillips truss-head screws 19" configuration MODE 1X 2X 3X 4X 5X 6X 7X 47738 23" and 24" configuration MODE 1X 2X 3X 4X... 5X 6X 7X 2-12 Catalyst 2900 Series XL Hardware Installation Guide 78-...
Hardware Installation Guide
Page 58
Installing the Switch in a Rack Chapter 2 Installation Figure 2-6 Attaching Brackets on Catalyst 2912 XL, 2924C XL, and 2924 XL Fixed-Port Switches (Rear-Panel Forward) 19" configuration Phillips flat-head screws 23" and 24" configuration Phillips truss-head screws 47298 2-14 Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04
Installing the Switch in a Rack Chapter 2 Installation Figure 2-6 Attaching Brackets on Catalyst 2912 XL, 2924C XL, and 2924 XL Fixed-Port Switches (Rear-Panel Forward) 19" configuration Phillips flat-head screws 23" and 24" configuration Phillips truss-head screws 47298 2-14 Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04
Hardware Installation Guide
Page 68
When the switch begins POST, the port LEDs turn amber for 2 seconds, and then they turn green. Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04 Powering On the Switch and Running POST To power on the switch after you install it begins POST, a series of the AC power cord to a Wall ...MODE 5x 4x 3x 2x 1x MODE 47306 Vertical wall-mount Parallel wall-mount After the switch is mounted on the wall, power the switch as described in "Powering On the Switch and Running POST" section on page 2-24. SERIES 16x 17x 18x 19x 20x 21x 22x 23x 24x Powering On the...
When the switch begins POST, the port LEDs turn amber for 2 seconds, and then they turn green. Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04 Powering On the Switch and Running POST To power on the switch after you install it begins POST, a series of the AC power cord to a Wall ...MODE 5x 4x 3x 2x 1x MODE 47306 Vertical wall-mount Parallel wall-mount After the switch is mounted on the wall, power the switch as described in "Powering On the Switch and Running POST" section on page 2-24. SERIES 16x 17x 18x 19x 20x 21x 22x 23x 24x Powering On the...
Hardware Installation Guide
Page 82
...LRE Port Depending on , the device at the other switch ports. 2-38 Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04 If the port LED does not turn on the switch model, you can connect the LRE port to either 12 or 24 LRE...Cisco 575 LRE CPE and Cisco 585 LRE CPE devices to cabling problems. Reconfigure and reboot the connected device if necessary. See Chapter 3, "Troubleshooting," for loops. Connecting to an LRE Port Figure 2-29 Connecting to a 100BASE-FX Switch Chapter 2 Installation 47287 Catalyst10209B0AS0ES-FEXRIES XL 23 24 Step 3 Step 4 Step 5 100BASE-FX port...
...LRE Port Depending on , the device at the other switch ports. 2-38 Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04 If the port LED does not turn on the switch model, you can connect the LRE port to either 12 or 24 LRE...Cisco 575 LRE CPE and Cisco 585 LRE CPE devices to cabling problems. Reconfigure and reboot the connected device if necessary. See Chapter 3, "Troubleshooting," for loops. Connecting to an LRE Port Figure 2-29 Connecting to a 100BASE-FX Switch Chapter 2 Installation 47287 Catalyst10209B0AS0ES-FEXRIES XL 23 24 Step 3 Step 4 Step 5 100BASE-FX port...
Hardware Installation Guide
Page 101
Appendix A Technical Specifications Table A-2 Technical Specifications for the Catalyst 2924 XL and Catalyst 2924C XL Switches Catalyst 2924 XL Environmental Operating Ranges Operating temperature 32 to 113°F (0 to 45°C) Storage temperature -4 to 149°F (-10 to 65°C) ...autoranging) 50 to 60 Hz +5V @9A, +12V @0.5A 70W (maximum) 239 Btus per hour Weight 7 lb (3.2 kg) Dimensions (H x W x D) Fiber-Port Power Levels 1.73 x 17.5 x 9.79 in . (4.4 x 44.5 x 24.8 cm) 1300 nm1 -14 dBm2 -19 to -14 dBm -19 to 60 Hz +5V @9A, +12V @0.5A Power consumption 70W (maximum) Physical...
Appendix A Technical Specifications Table A-2 Technical Specifications for the Catalyst 2924 XL and Catalyst 2924C XL Switches Catalyst 2924 XL Environmental Operating Ranges Operating temperature 32 to 113°F (0 to 45°C) Storage temperature -4 to 149°F (-10 to 65°C) ...autoranging) 50 to 60 Hz +5V @9A, +12V @0.5A 70W (maximum) 239 Btus per hour Weight 7 lb (3.2 kg) Dimensions (H x W x D) Fiber-Port Power Levels 1.73 x 17.5 x 9.79 in . (4.4 x 44.5 x 24.8 cm) 1300 nm1 -14 dBm2 -19 to -14 dBm -19 to 60 Hz +5V @9A, +12V @0.5A Power consumption 70W (maximum) Physical...
Hardware Installation Guide
Page 109
...described in Table B-2. The following sections describe the rollover cable and adapters for the RJ-21 connector on a Catalyst 2924 LRE XL switch. Note Table B-1 shows the pinouts for the console port. 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide B-5 Circuits 14, tip/ring 15, tip/ring 16, tip/ring 17..., tip/ring 18, tip/ring 19, tip/ring 20, tip/ring 21, tip/ring 22, tip/ring 23, tip/ring 24,...
...described in Table B-2. The following sections describe the rollover cable and adapters for the RJ-21 connector on a Catalyst 2924 LRE XL switch. Note Table B-1 shows the pinouts for the console port. 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide B-5 Circuits 14, tip/ring 15, tip/ring 16, tip/ring 17..., tip/ring 18, tip/ring 19, tip/ring 20, tip/ring 21, tip/ring 22, tip/ring 23, tip/ring 24,...
Hardware Installation Guide
Page 155
...full duplex 1-6 half duplex 1-6 pinouts B-2 100BASE-FX ports cables and connectors B-2 connecting to 2-37 to 2-38 connection distances, maximum 1-7 100 port mode LED 1-14 to 1-16 19-, 23-, and 24-inch racks 2-9 A AC power connecting to 2-24 connector 1-21 warning C-1 to C-4 78-6461-04 INDEX...100BASE-T ports B-1 to B-2, B-4 100BASE-FX, 50/125- or 62.5/125-micron fiber-optic 2-37, B-2 crossover and straight-through pinouts B-4 RJ-21 pinouts B-5 rollover B-6 rollover pinouts DB-25 adapter B-8 CCO See Cisco.com chassis, warning against stacking C-7 circuit breaker (15A) warning C-12 Catalyst 2900 ...
...full duplex 1-6 half duplex 1-6 pinouts B-2 100BASE-FX ports cables and connectors B-2 connecting to 2-37 to 2-38 connection distances, maximum 1-7 100 port mode LED 1-14 to 1-16 19-, 23-, and 24-inch racks 2-9 A AC power connecting to 2-24 connector 1-21 warning C-1 to C-4 78-6461-04 INDEX...100BASE-T ports B-1 to B-2, B-4 100BASE-FX, 50/125- or 62.5/125-micron fiber-optic 2-37, B-2 crossover and straight-through pinouts B-4 RJ-21 pinouts B-5 rollover B-6 rollover pinouts DB-25 adapter B-8 CCO See Cisco.com chassis, warning against stacking C-7 circuit breaker (15A) warning C-12 Catalyst 2900 ...
Hardware Installation Guide
Page 156
Index Cisco.com xviii Cisco RPS See RPS CiscoWorks 2000 1-4 Class 1 laser product warning C-22 CLI 1-4 Cluster Management Suite See CMS CMS 1-4 command-line interface See CLI connecting 10/100 ports to IP Phones 2-35 to 2-36 connecting to 10/100BASE-T ports 2-35 100BASE-FX ports 2-37 to 2-38 AC power 2-24 console port 2-42 to 2-43... xii crossover cable connectivity problems 3-5 pinout B-4 D DC power connecting to 2-25 to 2-35 specifications A-5 warning C-29 to C-30, C-39 default characteristics of the console port 2-42 IN-2 Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04
Index Cisco.com xviii Cisco RPS See RPS CiscoWorks 2000 1-4 Class 1 laser product warning C-22 CLI 1-4 Cluster Management Suite See CMS CMS 1-4 command-line interface See CLI connecting 10/100 ports to IP Phones 2-35 to 2-36 connecting to 10/100BASE-T ports 2-35 100BASE-FX ports 2-37 to 2-38 AC power 2-24 console port 2-42 to 2-43... xii crossover cable connectivity problems 3-5 pinout B-4 D DC power connecting to 2-25 to 2-35 specifications A-5 warning C-29 to C-30, C-39 default characteristics of the console port 2-42 IN-2 Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04
Hardware Installation Guide
Page 158
... 1-14 to 1-16 expansion slots 1-19 FDUP 1-14 to 1-16 full duplex 1-16 half duplex 1-16 interpreting 1-14 LRE 1-15 port (Catalyst 2900 LRE XL) 1-17 port status 1-9, 1-16 to 1-18 POST results 2-24, 3-1 RPS 1-13 to 1-14 RPS 600 1-13 SPEED 1-15 STAT 1-14 to 1-17 STAT LED 1-16 System 1-12 UTL 1-14...
... 1-14 to 1-16 expansion slots 1-19 FDUP 1-14 to 1-16 full duplex 1-16 half duplex 1-16 interpreting 1-14 LRE 1-15 port (Catalyst 2900 LRE XL) 1-17 port status 1-9, 1-16 to 1-18 POST results 2-24, 3-1 RPS 1-13 to 1-14 RPS 600 1-13 SPEED 1-15 STAT 1-14 to 1-17 STAT LED 1-16 System 1-12 UTL 1-14...
Hardware Installation Guide
Page 159
...11, 2-15, 2-22 N no on/off switch warning C-24 O overtemperature warning C-9 P PC, connecting to switch 2-42 performance problems, solving 3-3 personnel warning C-3 pinouts 10/100BASE-T ports B-2 cable, straight-through and crossover B-4 RJ-21... connector B-5 RJ-45-to-DB-25 terminal adapter B-8 RJ-45-to-DB-9 terminal adapter B-7 rollover cable B-7, B-8 Index port LEDs Catalyst 2900 LRE XL 1-17 ports...
...11, 2-15, 2-22 N no on/off switch warning C-24 O overtemperature warning C-9 P PC, connecting to switch 2-42 performance problems, solving 3-3 personnel warning C-3 pinouts 10/100BASE-T ports B-2 cable, straight-through and crossover B-4 RJ-21... connector B-5 RJ-45-to-DB-25 terminal adapter B-8 RJ-45-to-DB-9 terminal adapter B-7 rollover cable B-7, B-8 Index port LEDs Catalyst 2900 LRE XL 1-17 ports...
Hardware Installation Guide
Page 160
...port B-5 RPS connector 1-21 regulatory statements, EMC 2-4 to 2-6 RJ-21 connector illustration 1-7 pinouts B-5 RJ-45 connector, console port 2-43, B-3, B-5 RJ-45 console port 1-19 rollover cable 2-43, B-6 identifying B-6 pinouts B-8 RPS 300 connector 1-23 supported switches... 1-22 warning C-2 RPS 600 connector 1-22 LED 1-13 supported switches...SunNet Manager 1-4 supply circuit warning C-15 switch powering on 2-24 switched ports, module 1-8 System LED 1-12 T ...
...port B-5 RPS connector 1-21 regulatory statements, EMC 2-4 to 2-6 RJ-21 connector illustration 1-7 pinouts B-5 RJ-45 connector, console port 2-43, B-3, B-5 RJ-45 console port 1-19 rollover cable 2-43, B-6 identifying B-6 pinouts B-8 RPS 300 connector 1-23 supported switches... 1-22 warning C-2 RPS 600 connector 1-22 LED 1-13 supported switches...SunNet Manager 1-4 supply circuit warning C-15 switch powering on 2-24 switched ports, module 1-8 System LED 1-12 T ...