Assembly Manual
Page 5
... help guide the bolt through doors easily once fully assembled. Item #: R Qty.: 3 Descr: 3/8" Nylock Nut Item #: S Qty.: 6 Descr: 1/2" Nylock Nut Item #: T Qty.: 4 Descr: Cable End Stop Ball Note: Drawings are actual size Basic Assembly Principles Here are going to put your Bowflex® Xtreme®2... bolts or nuts toward the right to tighten and left to complete the assembly of your Bowflex® Xtreme®2 home gym. If you don't have these tools, you use a combination wrench to assemble your Bowflex® Xtreme®2 home gym. The best place for the step. 2. When ...
... help guide the bolt through doors easily once fully assembled. Item #: R Qty.: 3 Descr: 3/8" Nylock Nut Item #: S Qty.: 6 Descr: 1/2" Nylock Nut Item #: T Qty.: 4 Descr: Cable End Stop Ball Note: Drawings are actual size Basic Assembly Principles Here are going to put your Bowflex® Xtreme®2... bolts or nuts toward the right to tighten and left to complete the assembly of your Bowflex® Xtreme®2 home gym. If you don't have these tools, you use a combination wrench to assemble your Bowflex® Xtreme®2 home gym. The best place for the step. 2. When ...
Assembly Manual
Page 6
...; Item #3 - Do not tighten hardware from the Right Frame Rail (Item #2) into the end of the Cross Bar. Lower Lat Tower • Item #6 - Assembly Guide Step 1: Assemble the Base Frame Assembly Locate the following items: • Item #5 - Insert bolts through the holes in the Rear Cross Bar and Right Frame Rail. Place (1) 3/8" washer over...
...; Item #3 - Do not tighten hardware from the Right Frame Rail (Item #2) into the end of the Cross Bar. Lower Lat Tower • Item #6 - Assembly Guide Step 1: Assemble the Base Frame Assembly Locate the following items: • Item #5 - Insert bolts through the holes in the Rear Cross Bar and Right Frame Rail. Place (1) 3/8" washer over...
Assembly Manual
Page 19
... the Floating and Main Assembly Pulleys Slide the Right Squat Frame Pulley (6) to guide the Cable down through the Inner Right Frame Rail Pulley (9), up through the Floating (8) Pulley. Figure 20 - Unwrap the Right Squat Cable from the (6) Pulley and guide the Cable under the Cable Shroud (with the Bowflex® Xtreme®2 Logos), threading...
... the Floating and Main Assembly Pulleys Slide the Right Squat Frame Pulley (6) to guide the Cable down through the Inner Right Frame Rail Pulley (9), up through the Floating (8) Pulley. Figure 20 - Unwrap the Right Squat Cable from the (6) Pulley and guide the Cable under the Cable Shroud (with the Bowflex® Xtreme®2 Logos), threading...