Service Manual
Page 28
...Do the removal for the LOWER HOUSING ASSEMBLY. Use TL-3005 or TL-1165 to make a FAN COVER TOOL. SM5440-1 SERVICE MANUAL SLIDE LIFT LEVER GUAGE TL-3001 SLIDE LIFT LEVER SELECT LEVER (not shown) A091_0016BCA A091_0016BA Adjusting the Focus Light Path - Important It is within the target of the ...section. [4] Install the FAN COVER TOOL over the FAN area and the LAMP MODULE. [5] Energize the projector. [6] Set the projector to the LOW LAMP position. [7] Install the AUTO-FOCUS TARGET SLIDE TL-3002 until the image is necessary to bend the AUTO-FOCUS BRACKET ASSEMBLY MIRROR until it is fully...
...Do the removal for the LOWER HOUSING ASSEMBLY. Use TL-3005 or TL-1165 to make a FAN COVER TOOL. SM5440-1 SERVICE MANUAL SLIDE LIFT LEVER GUAGE TL-3001 SLIDE LIFT LEVER SELECT LEVER (not shown) A091_0016BCA A091_0016BA Adjusting the Focus Light Path - Important It is within the target of the ...section. [4] Install the FAN COVER TOOL over the FAN area and the LAMP MODULE. [5] Energize the projector. [6] Set the projector to the LOW LAMP position. [7] Install the AUTO-FOCUS TARGET SLIDE TL-3002 until the image is necessary to bend the AUTO-FOCUS BRACKET ASSEMBLY MIRROR until it is fully...
Service Manual
Page 40
SERVICE MANUAL Section 5: Specifications Electrical Supply Item Power Consumption Dimensions Slide size Slide change time LAMP and voltages Lumen Output Operating temperature Cooling Approvals Environmental storage Environmental operation Safety Dielectric strength 40 Desription Standard U.S. Ektagraphic ... • 21 - 27 C (70 - 80 F), 20 - 60% humidity optimum Fan speed is 2780 or 3000 RPMs, 1360 BTUs per hour to cool projector UL Complies with storage test specifications (TS 172) Complies with EXR lamp • EXTRA BRIGHT LAMP MODULE has a 30% increase in .) 1 second • EXR...
SERVICE MANUAL Section 5: Specifications Electrical Supply Item Power Consumption Dimensions Slide size Slide change time LAMP and voltages Lumen Output Operating temperature Cooling Approvals Environmental storage Environmental operation Safety Dielectric strength 40 Desription Standard U.S. Ektagraphic ... • 21 - 27 C (70 - 80 F), 20 - 60% humidity optimum Fan speed is 2780 or 3000 RPMs, 1360 BTUs per hour to cool projector UL Complies with storage test specifications (TS 172) Complies with EXR lamp • EXTRA BRIGHT LAMP MODULE has a 30% increase in .) 1 second • EXR...
Service Manual
Page 41
...CONTROL (See illustration on next page.) REMOTE INLET Desription Operates between failures) of operation, or after the slide is recommended every 1500 hours of 7500 operation hours. The projector has a MTBF (mean time between the following times: • Fast = 3 1 second • ... - Brown, RACK SOLENOID • PIN 5 - See the owner's manual. • PIN 1 - Orange, REVERSE TRAY CYCLE • PIN 4 - Yellow, COMMON • PIN 6 - The projector can operate for the difference in the slide position from the focus and reverse specifications by a qualified service person is ...
...CONTROL (See illustration on next page.) REMOTE INLET Desription Operates between failures) of operation, or after the slide is recommended every 1500 hours of 7500 operation hours. The projector has a MTBF (mean time between the following times: • Fast = 3 1 second • ... - Brown, RACK SOLENOID • PIN 5 - See the owner's manual. • PIN 1 - Orange, REVERSE TRAY CYCLE • PIN 4 - Yellow, COMMON • PIN 6 - The projector can operate for the difference in the slide position from the focus and reverse specifications by a qualified service person is ...
Service Manual
Page 44
SERVICE MANUAL SMALL COMPONENT BOARD ASSEMBLY 256809 Voltages WWK R A V V O B Y B J1 R3 CR2 CR3 CR4 Q1 Q2 R6 R4 R5 C5 R17 C4 R Y G N R WW J2 F1 R7 CR5 SLIDE PROJECTOR BOARD Q3 C1 CR1 R12 ++ R11 R10 C3 C2 R13 R14 CR6 R15 Q4 Description TIMER Circuit TIMER Circuit TIMER Circuit CYCLE HOLD DOWN REVERSE...
SERVICE MANUAL SMALL COMPONENT BOARD ASSEMBLY 256809 Voltages WWK R A V V O B Y B J1 R3 CR2 CR3 CR4 Q1 Q2 R6 R4 R5 C5 R17 C4 R Y G N R WW J2 F1 R7 CR5 SLIDE PROJECTOR BOARD Q3 C1 CR1 R12 ++ R11 R10 C3 C2 R13 R14 CR6 R15 Q4 Description TIMER Circuit TIMER Circuit TIMER Circuit CYCLE HOLD DOWN REVERSE...
Service Manual
Page 46
...-1 Check the DIRECTION LEVER for a broken MECHANISM DRIVE BELT. 2. Check the CYCLE LEVER and RATCHET LEVER on the DIRECTION LEVER. 3. Projector does not complete a cycle; Check that the CYCLE LEVER and RATCHET PLATE are correct. 3. Check that the CAM SHAFT ASSEMBLY RATCHET SPRING... necessary. Check that the voltage across the CYCLE SOLENOID COIL are clean. SERVICE MANUAL Slide Transport Malfunctions Malfunction Forward and reverse do not operate using the FRONT PANEL BUTTONS or REMOTE CONTROL. Projector has continual cycle. Use SUPER LUBE TL-4276. 2. If there is a...
...-1 Check the DIRECTION LEVER for a broken MECHANISM DRIVE BELT. 2. Check the CYCLE LEVER and RATCHET LEVER on the DIRECTION LEVER. 3. Projector does not complete a cycle; Check that the CYCLE LEVER and RATCHET PLATE are correct. 3. Check that the CAM SHAFT ASSEMBLY RATCHET SPRING... necessary. Check that the voltage across the CYCLE SOLENOID COIL are clean. SERVICE MANUAL Slide Transport Malfunctions Malfunction Forward and reverse do not operate using the FRONT PANEL BUTTONS or REMOTE CONTROL. Projector has continual cycle. Use SUPER LUBE TL-4276. 2. If there is a...
Service Manual
Page 47
...the lower corner of the LIFT LEVER RAMP is not correct, do the adjustment for the MANUAL and POWER SLIDE LIFT LEVER ECCENTRICS. 1. If the height is parallel with the TOP HOUSING. The projector has power. The CYCLE LEVER and the RATCHET PLATE are dirty. • Clean and...holes at positions A and B. • Do the adjustment for the MANUAL and POWER SLIDE LIFT LEVER ECCENTRICS. Malfunction The projector does not change cycles when using a DISSOLVE CONTROL; the REMOTE CONTROL and CONTROL PANEL BUTTONS operate correctly. SLIDE TRAY advances when "REVERSE" is not bent. 2. Check 1. If ...
...the lower corner of the LIFT LEVER RAMP is not correct, do the adjustment for the MANUAL and POWER SLIDE LIFT LEVER ECCENTRICS. 1. If the height is parallel with the TOP HOUSING. The projector has power. The CYCLE LEVER and the RATCHET PLATE are dirty. • Clean and...holes at positions A and B. • Do the adjustment for the MANUAL and POWER SLIDE LIFT LEVER ECCENTRICS. Malfunction The projector does not change cycles when using a DISSOLVE CONTROL; the REMOTE CONTROL and CONTROL PANEL BUTTONS operate correctly. SLIDE TRAY advances when "REVERSE" is not bent. 2. Check 1. If ...