Quick Start Guide
Page 1
ISP2150 2U Rack Server Platform Quick Start Guide A Guide for Technically Qualified Assemblers of Intel® Identified Subassemblies/ Products Before You Begin FCC Declaration of Conformity 4 Cautions and Warnings ...6 Product Regulation Compliance 7 Safety Compliance...7 Electromagnetic Compatibility (EMC 7 ISP2150 Opening and Closing the Front Bezel 8 Locking and Unlocking the Front Bezel 9 Attaching and Removing the Front Bezel 9 Installation...
ISP2150 2U Rack Server Platform Quick Start Guide A Guide for Technically Qualified Assemblers of Intel® Identified Subassemblies/ Products Before You Begin FCC Declaration of Conformity 4 Cautions and Warnings ...6 Product Regulation Compliance 7 Safety Compliance...7 Electromagnetic Compatibility (EMC 7 ISP2150 Opening and Closing the Front Bezel 8 Locking and Unlocking the Front Bezel 9 Attaching and Removing the Front Bezel 9 Installation...
Quick Start Guide
Page 2
... the user is encouraged to try to correct the interference by any means without prior written consent of Intel. However, there is no warranty of any kind with the instructions, may cause undesired operation. For ...of this document may appear in a particular installation. No part of this product, contact: Intel Corporation 5200 N.E. The ISP2150 2U Rack Server Platform Product Guide can be determined by turning the equipment off and on a circuit other than ... Conformity This device complies with the limits for help. 4 ISP2150 2U Rack Server Platform Quick Start Guide
... the user is encouraged to try to correct the interference by any means without prior written consent of Intel. However, there is no warranty of any kind with the instructions, may cause undesired operation. For ...of this document may appear in a particular installation. No part of this product, contact: Intel Corporation 5200 N.E. The ISP2150 2U Rack Server Platform Product Guide can be determined by turning the equipment off and on a circuit other than ... Conformity This device complies with the limits for help. 4 ISP2150 2U Rack Server Platform Quick Start Guide
Quick Start Guide
Page 3
... of the Canadian Department of Communications. Install and use the equipment according to meet CISPR 22 Class B. This equipment has been tested for correct handling. ISP2150 2U Rack Server Platform Quick Start Guide 5 BSMI (Taiwan) The following EMC Warning along with the BSMI ID number 3882B139 is located on the outside rear area of...
... of the Canadian Department of Communications. Install and use the equipment according to meet CISPR 22 Class B. This equipment has been tested for correct handling. ISP2150 2U Rack Server Platform Quick Start Guide 5 BSMI (Taiwan) The following EMC Warning along with the BSMI ID number 3882B139 is located on the outside rear area of...
Quick Start Guide
Page 4
... and notices in this guide. Read and adhere to this guide and the documentation supplied with experience installing and configuring servers. If the instructions for the chassis and power supply are inconsistent with these instructions or the instructions for qualified technical personnel... Pressing the power button does not turn off . Failure to do this can damage server components. Disconnect the server from its power source and from any telecommunications links, networks, or modems before doing any of the computer chassis. 6 ISP2150 2U Rack Server Platform Quick Start Guide
... and notices in this guide. Read and adhere to this guide and the documentation supplied with experience installing and configuring servers. If the instructions for the chassis and power supply are inconsistent with these instructions or the instructions for qualified technical personnel... Pressing the power button does not turn off . Failure to do this can damage server components. Disconnect the server from its power source and from any telecommunications links, networks, or modems before doing any of the computer chassis. 6 ISP2150 2U Rack Server Platform Quick Start Guide
Quick Start Guide
Page 5
... Part 15, Class B ICES-003 Class B EN55022, Class B EN55024 (Immunity) EN61000-3-2 Limit for use in computer rack cabinets within computer rooms and similar locations. Product Regulation Compliance See the ISP2150 2U Rack Server Platform Product Guide for U.S. Safety Compliance USA: Canada: Europe: International: Australian / New Zealand: UL 1950 - and Canada)... evaluated for Harmonic Current Emissions CISPR 22, Class B AS/NZ 3548, Class B limits (CISPR 22) VCCI Class B (CISPR 22 B limit) ISP2150 2U Rack Server Platform Quick Start Guide 7 Other uses may require further evaluation.
... Part 15, Class B ICES-003 Class B EN55022, Class B EN55024 (Immunity) EN61000-3-2 Limit for use in computer rack cabinets within computer rooms and similar locations. Product Regulation Compliance See the ISP2150 2U Rack Server Platform Product Guide for U.S. Safety Compliance USA: Canada: Europe: International: Australian / New Zealand: UL 1950 - and Canada)... evaluated for Harmonic Current Emissions CISPR 22, Class B AS/NZ 3548, Class B limits (CISPR 22) VCCI Class B (CISPR 22 B limit) ISP2150 2U Rack Server Platform Quick Start Guide 7 Other uses may require further evaluation.
Quick Start Guide
Page 6
... bezel into the correct position where it to swing to separate from each side. 2. The hinging mechanism will snap shut. 8 ISP2150 2U Rack Server Platform Quick Start Guide Opening and Closing the Front Bezel With the bezel open the bezel, do the following procedures describe how operate the... chassis and grasp the edges of the front panel features, refer to your new Intel® ISP2150 system. The following : 1. ISP2150 Congratulations on the purchase of your new system, guides you through rack kit installation, and helps you until it upwards. This Quick Start introduces you to...
... bezel into the correct position where it to swing to separate from each side. 2. The hinging mechanism will snap shut. 8 ISP2150 2U Rack Server Platform Quick Start Guide Opening and Closing the Front Bezel With the bezel open the bezel, do the following procedures describe how operate the... chassis and grasp the edges of the front panel features, refer to your new Intel® ISP2150 system. The following : 1. ISP2150 Congratulations on the purchase of your new system, guides you through rack kit installation, and helps you until it upwards. This Quick Start introduces you to...
Quick Start Guide
Page 7
To attach the bezel: 1. To remove the bezel: 1. ISP2150 2U Rack Server Platform Quick Start Guide 9 Close the bezel and insert the key into the lock and turn the lock clockwise until it from the system. The bezel ...
To attach the bezel: 1. To remove the bezel: 1. ISP2150 2U Rack Server Platform Quick Start Guide 9 Close the bezel and insert the key into the lock and turn the lock clockwise until it from the system. The bezel ...
Quick Start Guide
Page 8
Remove the new processor from its speed in BIOS set-up to two Intel® Pentium® II or Pentium III processors (with 100 MHz system bus). A 2. Push down firmly, with your system. After you have installed the processor, ... processors, make sure they click into the retention module. Attach the small end of the power cable to ensure proper operation of your system. 10 ISP2150 2U Rack Server Platform Quick Start Guide Orient the processor so that the heat sink faces the I/O connectors. To lock in the empty secondary connector (B) to the fan...
Remove the new processor from its speed in BIOS set-up to two Intel® Pentium® II or Pentium III processors (with 100 MHz system bus). A 2. Push down firmly, with your system. After you have installed the processor, ... processors, make sure they click into the retention module. Attach the small end of the power cable to ensure proper operation of your system. 10 ISP2150 2U Rack Server Platform Quick Start Guide Orient the processor so that the heat sink faces the I/O connectors. To lock in the empty secondary connector (B) to the fan...
Quick Start Guide
Page 9
Installing Memory The server only supports 100 MHz PC/100-compliant SDRAM. • Install from 32 MB to 2 GB of unbuffered memory, using up to four single or double-banked DIMMs Or • Install from 32 MB to 2 GB of registered memory, using up to four single or double-banked DIMMs OM09318 ISP2150 2U Rack Server Platform Quick Start Guide 11
Installing Memory The server only supports 100 MHz PC/100-compliant SDRAM. • Install from 32 MB to 2 GB of unbuffered memory, using up to four single or double-banked DIMMs Or • Install from 32 MB to 2 GB of registered memory, using up to four single or double-banked DIMMs OM09318 ISP2150 2U Rack Server Platform Quick Start Guide 11
Quick Start Guide
Page 10
DIMMs are protruding from its anti-static package. 3. To install your service representative or visit the Intel Support website: http://support.intel.com/support/motherboards/server/l440gx/compat.htm CAUTION Use extreme care when installing a DIMM. Orient the DIMM so that no cables are keyed and can...bottom edge of the DIMM align with gold-plated edge connectors in only one way. Turn on the monitor and then the server. 12 ISP2150 2U Rack Server Platform Quick Start Guide Applying too much pressure can be the same speed and either all registered or all external cables and the ...
DIMMs are protruding from its anti-static package. 3. To install your service representative or visit the Intel Support website: http://support.intel.com/support/motherboards/server/l440gx/compat.htm CAUTION Use extreme care when installing a DIMM. Orient the DIMM so that no cables are keyed and can...bottom edge of the DIMM align with gold-plated edge connectors in only one way. Turn on the monitor and then the server. 12 ISP2150 2U Rack Server Platform Quick Start Guide Applying too much pressure can be the same speed and either all registered or all external cables and the ...
Quick Start Guide
Page 11
...Align the drive holes to the drive (A). ISP2150 2U Rack Server Platform Quick Start Guide 13 A B OM09323 3. Make sure that you until the lever tab clicks into the chassis slot indicating that it on the right side of the housing. 2. The server has four hot-swappable SCSI hard drive ...four screws (D) from the drive bays by unclipping the retention lever on an antistatic surface. Installing a Hard Drive AB E D C OM09317 Your server does not include a hard drive. You must purchase them separately and install them. Remove the drive carrier(s) from the drive carrier/drive slide track...
...Align the drive holes to the drive (A). ISP2150 2U Rack Server Platform Quick Start Guide 13 A B OM09323 3. Make sure that you until the lever tab clicks into the chassis slot indicating that it on the right side of the housing. 2. The server has four hot-swappable SCSI hard drive ...four screws (D) from the drive bays by unclipping the retention lever on an antistatic surface. Installing a Hard Drive AB E D C OM09317 Your server does not include a hard drive. You must purchase them separately and install them. Remove the drive carrier(s) from the drive carrier/drive slide track...
Quick Start Guide
Page 12
Do not use the PCI slots on the server board. 1. Remove the thumbscrew (B) holding the cover retention bracket (A) to this server. Remove the bracket from the chassis. 2. Remove the expansion slot cover (C) for the slot you wish to use . OM09325 14 ISP2150 2U Rack Server Platform Quick Start Guide Installing Add-in Cards B A C You can only add two PCI cards to the chassis. Remove the expansion slot cover for the slot you wish to use . You must use any expansion slots on the riser card.
Do not use the PCI slots on the server board. 1. Remove the thumbscrew (B) holding the cover retention bracket (A) to this server. Remove the bracket from the chassis. 2. Remove the expansion slot cover (C) for the slot you wish to use . OM09325 14 ISP2150 2U Rack Server Platform Quick Start Guide Installing Add-in Cards B A C You can only add two PCI cards to the chassis. Remove the expansion slot cover for the slot you wish to use . You must use any expansion slots on the riser card.
Quick Start Guide
Page 13
... card should be held in board from its top edge or upper corners. Firmly press it into the mating slot in the expansion slot frame. ISP2150 2U Rack Server Platform Quick Start Guide 15 The back edge of the card guide. 6. OM09326 NOTE If you are installing a full-length PCI card, slide the card...
... card should be held in board from its top edge or upper corners. Firmly press it into the mating slot in the expansion slot frame. ISP2150 2U Rack Server Platform Quick Start Guide 15 The back edge of the card guide. 6. OM09326 NOTE If you are installing a full-length PCI card, slide the card...
Quick Start Guide
Page 14
...jumpers and/or switches on the front of the drive bay housing. 9. Reinstall the diskette drive in the top of the chassis. 16 ISP2150 2U Rack Server Platform Quick Start Guide Insert the recessed retention screws (C) through the access holes in the section "Re-Installing the OM09319 Diskette Drive". 8. B ... Drive". 6. You must purchase one separately and install it on an anti-static surface. 2. Installing a Slim-Line CD-ROM Drive C D Your server does not come with the system. 4. Connect the CD-ROM IDE cable (A) and power (B) cables to the front of the CD tray. 7. ...
...jumpers and/or switches on the front of the drive bay housing. 9. Reinstall the diskette drive in the top of the chassis. 16 ISP2150 2U Rack Server Platform Quick Start Guide Insert the recessed retention screws (C) through the access holes in the section "Re-Installing the OM09319 Diskette Drive". 8. B ... Drive". 6. You must purchase one separately and install it on an anti-static surface. 2. Installing a Slim-Line CD-ROM Drive C D Your server does not come with the system. 4. Connect the CD-ROM IDE cable (A) and power (B) cables to the front of the CD tray. 7. ...
Quick Start Guide
Page 15
... drive. 2. Tighten the three screws on the rear of the chassis with the screws that secure the diskette drive carrier to the manufacturer's specifications. ISP2150 2U Rack Server Platform Quick Start Guide 17 Slide the drive carrier out the front of the chassis. 3. Remove and save the screws from the sides of the carrier...
... drive. 2. Tighten the three screws on the rear of the chassis with the screws that secure the diskette drive carrier to the manufacturer's specifications. ISP2150 2U Rack Server Platform Quick Start Guide 17 Slide the drive carrier out the front of the chassis. 3. Remove and save the screws from the sides of the carrier...
Quick Start Guide
Page 16
The following procedures describe how to mount the ISP2150 system in a Cabinet 1. Attach the left and right front brackets (A) and mounting bolts (B) to attach them to the sides of the system. Mount the brackets to the system. CAUTION Some racks and cabinets may not support the installation of...are not exceeded. The system also comes with mounting bracket hardware that allows you to the system. B A C OM09334 18 ISP2150 2U Rack Server Platform Quick Start Guide Installing the Front Bracket in each side towards the rear panel of chassis. Mount one on each type of ...
The following procedures describe how to mount the ISP2150 system in a Cabinet 1. Attach the left and right front brackets (A) and mounting bolts (B) to attach them to the sides of the system. Mount the brackets to the system. CAUTION Some racks and cabinets may not support the installation of...are not exceeded. The system also comes with mounting bracket hardware that allows you to the system. B A C OM09334 18 ISP2150 2U Rack Server Platform Quick Start Guide Installing the Front Bracket in each side towards the rear panel of chassis. Mount one on each type of ...
Quick Start Guide
Page 17
... the support washers as rollers. A B OM09336 A OM09346 ISP2150 2U Rack Server Platform Quick Start Guide 19 3. Mount the front bracket to the cabinet. To complete the installation, bolt the system's front brackets to the cabinet using the ...
... the support washers as rollers. A B OM09336 A OM09346 ISP2150 2U Rack Server Platform Quick Start Guide 19 3. Mount the front bracket to the cabinet. To complete the installation, bolt the system's front brackets to the cabinet using the ...
Quick Start Guide
Page 18
... mounting bolts (B) to attach them to the system. Mount the brackets mid-way down the sides of the relay rack. Your system comes with the front panel. A B OM09335 A OM09347 20 ISP2150 2U Rack Server Platform Quick Start Guide Installing the Front Bracket in the figure. NOTE You can also mount the bracket so that the...
... mounting bolts (B) to attach them to the system. Mount the brackets mid-way down the sides of the relay rack. Your system comes with the front panel. A B OM09335 A OM09347 20 ISP2150 2U Rack Server Platform Quick Start Guide Installing the Front Bracket in the figure. NOTE You can also mount the bracket so that the...
Quick Start Guide
Page 19
...in the rail, fasten the rail using the largest screws (B) supplied with your system allows you to your system into a four-post, network server cabinet (e.g. Align each inside piece (C) from the outer (A) and middle (B) rail pieces. 3. Assemble tools and miscellaneous parts. You will have...cabinet. Follow these steps to completely separate the inside piece of the rail system. D D A B C A B C OM09132 D OM09133 ISP2150 2U Rack Server Platform Quick Start Guide 21 APC Netshelter). To remove an inside rail piece from both sides of the rail system, slide the part as far out...
...in the rail, fasten the rail using the largest screws (B) supplied with your system allows you to your system into a four-post, network server cabinet (e.g. Align each inside piece (C) from the outer (A) and middle (B) rail pieces. 3. Assemble tools and miscellaneous parts. You will have...cabinet. Follow these steps to completely separate the inside piece of the rail system. D D A B C A B C OM09132 D OM09133 ISP2150 2U Rack Server Platform Quick Start Guide 21 APC Netshelter). To remove an inside rail piece from both sides of the rail system, slide the part as far out...
Quick Start Guide
Page 20
... bracket. (The photo shows the rails inside the A brackets yet.) OM09145 C D B OM09142 continued 22 ISP2150 2U Rack Server Platform Quick Start Guide Use eight mounting screws (D) D provided by the manufacturer of the cabinet rack. In the illustration to the cabinet rack. Be sure that the sharper angled side of the chassis after the right inside rail...
... bracket. (The photo shows the rails inside the A brackets yet.) OM09145 C D B OM09142 continued 22 ISP2150 2U Rack Server Platform Quick Start Guide Use eight mounting screws (D) D provided by the manufacturer of the cabinet rack. In the illustration to the cabinet rack. Be sure that the sharper angled side of the chassis after the right inside rail...