User's Manual for English Edition
Page 2
... Started Power System...30 Using AC Power 30 Using Battery Power 32 Battery Care...33 Powering ON the Notebook PC 34 The Power-On Self Test (POST 34 Checking Battery Power 36 Charging the Battery Pack 37 Power Options 38 Power Management Modes 40 Sleep and Hibernate 40 Thermal Power Control...
... Started Power System...30 Using AC Power 30 Using Battery Power 32 Battery Care...33 Powering ON the Notebook PC 34 The Power-On Self Test (POST 34 Checking Battery Power 36 Charging the Battery Pack 37 Power Options 38 Power Management Modes 40 Sleep and Hibernate 40 Thermal Power Control...
User's Manual for English Edition
Page 18
... lock.To remove the battery pack, this spring lock must be held in the system and configures CMOS accordingly during the POST (Power-On-Self-Test) process. The BIOS automatically detects the amount of this Notebook PC.The battery pack cannot be disassembled and must be purchased as a single unit. 2 Battery...
... lock.To remove the battery pack, this spring lock must be held in the system and configures CMOS accordingly during the POST (Power-On-Self-Test) process. The BIOS automatically detects the amount of this Notebook PC.The battery pack cannot be disassembled and must be purchased as a single unit. 2 Battery...
User's Manual for English Edition
Page 34
... cover a Notebook PC that controls the POST is installed as a carrying bag. The Power-On Self Test (POST) When you need to run through a series of software-controlled diagnostic tests called the Power-On Self Test (POST).The software that is powered ON with selections to correct the conflict by running BIOS Setup... the existing hardware, it back ON. Before bootup, the display panel flashes when the power is turned ON.This is part of the Notebook PC's test routine and is finished, you receive the Notebook PC. When the...
... cover a Notebook PC that controls the POST is installed as a carrying bag. The Power-On Self Test (POST) When you need to run through a series of software-controlled diagnostic tests called the Power-On Self Test (POST).The software that is powered ON with selections to correct the conflict by running BIOS Setup... the existing hardware, it back ON. Before bootup, the display panel flashes when the power is turned ON.This is part of the Notebook PC's test routine and is finished, you receive the Notebook PC. When the...
User's Manual for English Edition
Page 68
Only purchase expansion modules from authorized retailers of memory in the system and configures CMOS accordingly during the POST (PowerOn-Self-Test) process. The BIOS automatically detects the amount of this Notebook PC to ensure maximum compatibility and reliability. WARNING! Disconnect all the connected peripherals, any telephone ...
Only purchase expansion modules from authorized retailers of memory in the system and configures CMOS accordingly during the POST (PowerOn-Self-Test) process. The BIOS automatically detects the amount of this Notebook PC to ensure maximum compatibility and reliability. WARNING! Disconnect all the connected peripherals, any telephone ...
User's Manual for English Edition
Page 104
... Yes Yes No Yes Yes Yes Yes Yes No Yes Yes Still Pending No Yes Yes Yes Yes No No No Yes Yes Yes More Testing No No Not Applicable Yes No No No No Not Applicable No No Still Pending No No No Yes No Not Applicable Not Applicable Not...
... Yes Yes No Yes Yes Yes Yes Yes No Yes Yes Still Pending No Yes Yes Yes Yes No No No Yes Yes Yes More Testing No No Not Applicable Yes No No No No Not Applicable No No Still Pending No No No Yes No Not Applicable Not Applicable Not...
User's Manual for English Edition
Page 105
For updates to support DTMF signalling, which would make any additional testing superfluous). de/technologies/ctr_21.html 1 National requirements will apply only if the equipment may use pulse dialling (manufacturers may visit http://www.cetecom. This information was copied from CETECOM and is only intended to this table, you may state in the user guide that the equipment is supplied without liability. Notebook PC User Manual A-25 In The Netherlands additional testing is required for series connection and caller ID facilities.
For updates to support DTMF signalling, which would make any additional testing superfluous). de/technologies/ctr_21.html 1 National requirements will apply only if the equipment may use pulse dialling (manufacturers may visit http://www.cetecom. This information was copied from CETECOM and is only intended to this table, you may state in the user guide that the equipment is supplied without liability. Notebook PC User Manual A-25 In The Netherlands additional testing is required for series connection and caller ID facilities.
User's Manual for English Edition
Page 106
This equipment has been tested and found to comply with the limits for compliance could void your authority to operate the equipment. You are designed to provide reasonable protection against ...
This equipment has been tested and found to comply with the limits for compliance could void your authority to operate the equipment. You are designed to provide reasonable protection against ...
User's Manual for English Edition
Page 107
... safety according to Channels 1 through 11 in the 2.4GHz frequency by specified firmware controlled in [Article 3.2] • Radio test suites according to the transmitting antenna during transmitting. Washington DC: Office of the radio spectrum as in the USA." Declaration of...8226; Essential requirements as in [Article 3] • Protection requirements for health and safety as in [Article 3.1b] • Testing for satisfying RF exposure compliance. Government Printing Office.) FCC Radio Frequency (RF) Exposure Caution Statement Any changes or modifications not expressly approved...
... safety according to Channels 1 through 11 in the 2.4GHz frequency by specified firmware controlled in [Article 3.2] • Radio test suites according to the transmitting antenna during transmitting. Washington DC: Office of the radio spectrum as in the USA." Declaration of...8226; Essential requirements as in [Article 3] • Protection requirements for health and safety as in [Article 3.1b] • Testing for satisfying RF exposure compliance. Government Printing Office.) FCC Radio Frequency (RF) Exposure Caution Statement Any changes or modifications not expressly approved...