Configuration Guide
Page 24
... 2000 Component List Component SCE 2000 platform Accessories Rack mount kit Management cables Power cables Grounding kit Documentation Optional Equipment External Optical Bypass module kit Description SCE 2020 4xGBE platform configured with each system. Note We no longer ship the entire SCE 2000 documentation set and the Cisco Documentation CD-ROM package* Four rubber feet for...
... 2000 Component List Component SCE 2000 platform Accessories Rack mount kit Management cables Power cables Grounding kit Documentation Optional Equipment External Optical Bypass module kit Description SCE 2020 4xGBE platform configured with each system. Note We no longer ship the entire SCE 2000 documentation set and the Cisco Documentation CD-ROM package* Four rubber feet for...
Configuration Guide
Page 40
... Dimensions 17.7 in . Information About Preparing to the network and console terminal • Rack-mounting kit (optional) • A new AC-input or DC-input power supply • A new fan module Cisco SCE 2000 4xGBE Installation and Configuration Guide 4-2 OL-7824-06 However, you need the ...following tools and equipment to install the SCE 2000 chassis and the rack-mount kit (if installing the SCE 2000 platform in a rack), fan modules, and power supplies: ...
... Dimensions 17.7 in . Information About Preparing to the network and console terminal • Rack-mounting kit (optional) • A new AC-input or DC-input power supply • A new fan module Cisco SCE 2000 4xGBE Installation and Configuration Guide 4-2 OL-7824-06 However, you need the ...following tools and equipment to install the SCE 2000 chassis and the rack-mount kit (if installing the SCE 2000 platform in a rack), fan modules, and power supplies: ...
Configuration Guide
Page 42
...mount the SCE 2000 in either a tabletop or a rack-mounted unit. Use the supporting brackets included in the kit • 19-inch rack with the SCE 2000 when it on a Workbench or Tabletop • Rack-Mounting a SCE 2000 Platform • How to properly ground the SCE 2000 platform. A rack-mounting kit...see SCE 2000 Component List ) to the Regulatory Compliance and Safety Information for tabletop installations. A rubber feet kit is included for the Cisco Service Control Engine document. Installing the SCE 2000 Platform Chapter 4 Installation and Maintenance Table 4-2 SCE 2000 ...
...mount the SCE 2000 in either a tabletop or a rack-mounted unit. Use the supporting brackets included in the kit • 19-inch rack with the SCE 2000 when it on a Workbench or Tabletop • Rack-Mounting a SCE 2000 Platform • How to properly ground the SCE 2000 platform. A rack-mounting kit...see SCE 2000 Component List ) to the Regulatory Compliance and Safety Information for tabletop installations. A rubber feet kit is included for the Cisco Service Control Engine document. Installing the SCE 2000 Platform Chapter 4 Installation and Maintenance Table 4-2 SCE 2000 ...
Configuration Guide
Page 44
... firmly on the tabletop or workbench. What to Do Next Proceed to section, How to Attach a Chassis Ground Connection to a 19" rack. To prevent injury, avoid sudden twists or moves. 4. Also make sure your hands around the SCE 2000 sides and lifting the SCE... and 5 inches (12.7 cm) at least 2 inches (5 cm) on the tabletop or workbench. 3. Cisco SCE 2000 4xGBE Installation and Configuration Guide 4-6 OL-7824-06 the mounting kit includes two mounting brackets as the surrounding area. Installing the SCE 2000 Platform Chapter 4 Installation and Maintenance DETAILED STEPS 2. Replace...
... firmly on the tabletop or workbench. What to Do Next Proceed to section, How to Attach a Chassis Ground Connection to a 19" rack. To prevent injury, avoid sudden twists or moves. 4. Also make sure your hands around the SCE 2000 sides and lifting the SCE... and 5 inches (12.7 cm) at least 2 inches (5 cm) on the tabletop or workbench. 3. Cisco SCE 2000 4xGBE Installation and Configuration Guide 4-6 OL-7824-06 the mounting kit includes two mounting brackets as the surrounding area. Installing the SCE 2000 Platform Chapter 4 Installation and Maintenance DETAILED STEPS 2. Replace...
Configuration Guide
Page 45
...7824-06 Cisco SCE 2000 4xGBE Installation and Configuration Guide 4-7 Repeat steps 1 and 2 on both sides of the chassis, respectively, multiple SCE 2000 s can be at least 17.3 inches (44 cm). Mounting Brackets for 2-post Rack Figure 4-4 Mounting Brackets for installing the rack-mount. See... Align the rack-mount bracket to the two front rack posts with front and back rack posts - Because the inlet and exhaust ports (vents) for your installation (2-post rack or 4-post rack) as illustrated in addition to the mounting brackets illustrated below, the mounting kit includes two ...
...7824-06 Cisco SCE 2000 4xGBE Installation and Configuration Guide 4-7 Repeat steps 1 and 2 on both sides of the chassis, respectively, multiple SCE 2000 s can be at least 17.3 inches (44 cm). Mounting Brackets for 2-post Rack Figure 4-4 Mounting Brackets for installing the rack-mount. See... Align the rack-mount bracket to the two front rack posts with front and back rack posts - Because the inlet and exhaust ports (vents) for your installation (2-post rack or 4-post rack) as illustrated in addition to the mounting brackets illustrated below, the mounting kit includes two ...
Configuration Guide
Page 50
... The other side of the grounding cable must always be made first and disconnected last. Use the grounding kit to the site equivalent of the AC earth. 4-12 Cisco SCE 2000 4xGBE Installation and Configuration Guide OL-7824-06 Note When installing the unit, the chassis ground ...From the enclosed grounding kit, remove the necessary materials - Installing the SCE 2000 Platform Chapter 4 Installation and Maintenance Note Since the brackets support the weight of the entire SCE 2000 chassis, be sure to use all four screws to fasten the two rack-mount brackets to the appropriate ...
... The other side of the grounding cable must always be made first and disconnected last. Use the grounding kit to the site equivalent of the AC earth. 4-12 Cisco SCE 2000 4xGBE Installation and Configuration Guide OL-7824-06 Note When installing the unit, the chassis ground ...From the enclosed grounding kit, remove the necessary materials - Installing the SCE 2000 Platform Chapter 4 Installation and Maintenance Note Since the brackets support the weight of the entire SCE 2000 chassis, be sure to use all four screws to fasten the two rack-mount brackets to the appropriate ...
Configuration Guide
Page 140
...: - Connect the control cable (supplied in the mounting panel. 2. Using the screws attached to the module, screw it into an empty position in the kit) from the front panel of the module to the... panel of the module to the Bypass 1 9-pin D-Type connector on the rear panel of the rack above the SCE 2000 platform. DETAILED STEPS Step 1 Step 2 Using the screws attached to the SUB... If installing only one module, the connections are on the rear panel of the SCE 2000 platform. Cisco SCE 2000 4xGBE Installation and Configuration Guide A-4 OL-7824-06 Secure the module panel to the NET...
...: - Connect the control cable (supplied in the mounting panel. 2. Using the screws attached to the module, screw it into an empty position in the kit) from the front panel of the module to the... panel of the module to the Bypass 1 9-pin D-Type connector on the rear panel of the rack above the SCE 2000 platform. DETAILED STEPS Step 1 Step 2 Using the screws attached to the SUB... If installing only one module, the connections are on the rear panel of the SCE 2000 platform. Cisco SCE 2000 4xGBE Installation and Configuration Guide A-4 OL-7824-06 Secure the module panel to the NET...