Hardware Installation Guide
Page 69
...Preparing for ports 2 to 8 each test runs, the port LEDs, starting with a DC terminal block plug on the switch back panel. Step 1 Step 2 Unpack the shipping box, and verify its contents. As each turn off in turn off . Chapter 2 Installation Connecting to DC Power The ...CT-920CH, or CT-940CH • 6-gauge copper ground wire (insulated or noninsulated) 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide 2-25 Call Cisco Systems immediately if your switch does not pass POST. Obtain the following necessary tools and equipment: • Ratcheting torque screwdriver with the...
...Preparing for ports 2 to 8 each test runs, the port LEDs, starting with a DC terminal block plug on the switch back panel. Step 1 Step 2 Unpack the shipping box, and verify its contents. As each turn off in turn off . Chapter 2 Installation Connecting to DC Power The ...CT-920CH, or CT-940CH • 6-gauge copper ground wire (insulated or noninsulated) 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide 2-25 Call Cisco Systems immediately if your switch does not pass POST. Obtain the following necessary tools and equipment: • Ratcheting torque screwdriver with the...