BladeSystem c-Class Solution Overview Setup Poster
Page 2
...are provided. Learn about the information and tools required to plan and learn about the functionality and value of HP BladeSystem technologies and the value of BladeSystem solutions. This tab also includes useful links to locate all hard copy... Maintain and Troubleshoot. Use this document, the term "blade" can include server blades, storage blades, or workstation blades. 1 Before you begin researching the HP BladeSystem solution, see the HP BladeSystem technical resources website (http://www.hp.com/go/bladesystem/documentation). These documents provide required important ...
...are provided. Learn about the information and tools required to plan and learn about the functionality and value of HP BladeSystem technologies and the value of BladeSystem solutions. This tab also includes useful links to locate all hard copy... Maintain and Troubleshoot. Use this document, the term "blade" can include server blades, storage blades, or workstation blades. 1 Before you begin researching the HP BladeSystem solution, see the HP BladeSystem technical resources website (http://www.hp.com/go/bladesystem/documentation). These documents provide required important ...
HP BladeSystem c7000 Enclosure Maintenance and Service Guide
Page 3
... considerations ...28 Preventing electrostatic discharge ...28 Warning and caution messages ...28 Preparing the enclosure...30 Power down the server blades or workstation blades 30 Power down the storage blades ...31 Power down the enclosure ...31 HP BladeSystem c7000 power supply or power supply blank 32 Device bay blank ...33 Device bay shelf...33 Half-height...
... considerations ...28 Preventing electrostatic discharge ...28 Warning and caution messages ...28 Preparing the enclosure...30 Power down the server blades or workstation blades 30 Power down the storage blades ...31 Power down the enclosure ...31 HP BladeSystem c7000 power supply or power supply blank 32 Device bay blank ...33 Device bay shelf...33 Half-height...
HP BladeSystem c7000 Enclosure Maintenance and Service Guide
Page 30
...result in ESD damage to power down the server blades or workstation blades for more information, see "Preventing electrostatic discharge (on page 31). Power down the server blades or workstation blades Before powering down the server blades or workstation blades: • Use a virtual power button selection ...to enter standby mode. CAUTION: When performing non-hot-plug operations, you follow proper grounding procedures before the server blades or workstation blades enter standby mode. • Press and hold the Power On/Standby button for any upgrade or maintenance procedures,...
...result in ESD damage to power down the server blades or workstation blades for more information, see "Preventing electrostatic discharge (on page 31). Power down the server blades or workstation blades Before powering down the server blades or workstation blades: • Use a virtual power button selection ...to enter standby mode. CAUTION: When performing non-hot-plug operations, you follow proper grounding procedures before the server blades or workstation blades enter standby mode. • Press and hold the Power On/Standby button for any upgrade or maintenance procedures,...
HP BladeSystem c7000 Enclosure Maintenance and Service Guide
Page 31
... replacement procedures 31 Disconnect all server blades or workstation blades ("Power down all power cables. b. Power down the storage blades" on page 30). 2. This is available to power down the partner server blades or workstation blades. To remove all storage blades ("Power down all power from the server blades or workstation blades, remove the server blades or workstation blades from the Virtual Power menu...
... replacement procedures 31 Disconnect all server blades or workstation blades ("Power down all power cables. b. Power down the storage blades" on page 30). 2. This is available to power down the partner server blades or workstation blades. To remove all storage blades ("Power down all power from the server blades or workstation blades, remove the server blades or workstation blades from the Virtual Power menu...
HP BladeSystem c7000 Enclosure Maintenance and Service Guide
Page 37
... down the half-height or full-height blade ("Power down the server blades or workstation blades" on top of the storage blade. Back up all data. 3. The lower tape or storage blade cannot be removed without first removing the upper half-height blade. Identify the proper half-height or full-height blade in the same quadrant as both...
... down the half-height or full-height blade ("Power down the server blades or workstation blades" on top of the storage blade. Back up all data. 3. The lower tape or storage blade cannot be removed without first removing the upper half-height blade. Identify the proper half-height or full-height blade in the same quadrant as both...
HP BladeSystem c7000 Enclosure Maintenance and Service Guide
Page 46
... 46 Remove the Onboard Administrator tray. When removing an active component, replace it with more than one component or blank removed. 4. Power down the server blades or workstation blades" on page 31). 3. CAUTION: For best cooling practices, do not operate the enclosure for extended periods with a blank. Remove the AC input module...
... 46 Remove the Onboard Administrator tray. When removing an active component, replace it with more than one component or blank removed. 4. Power down the server blades or workstation blades" on page 31). 3. CAUTION: For best cooling practices, do not operate the enclosure for extended periods with a blank. Remove the AC input module...
HP BladeSystem c7000 Enclosure Maintenance and Service Guide
Page 47
...on page 42). 7. Removal and replacement procedures 47 To remove the component: 1. Remove the rear cage. a. Power down the server blades or workstation blades" on page 30). 2. Remove the Onboard Administrator modules ("Onboard Administrator" on page 41). 6. Remove the fans ("Active Cool 200 ... Power down the server blades ("Power down the enclosure (on page 32) 5. Disconnect all blades and power supplies approximately 8 cm (3 in ): o Half-height and full-height blades ("Half-height or full-height blade" on page 36) o Power supplies ("HP BladeSystem c7000 power supply or...
...on page 42). 7. Removal and replacement procedures 47 To remove the component: 1. Remove the rear cage. a. Power down the server blades or workstation blades" on page 30). 2. Remove the Onboard Administrator modules ("Onboard Administrator" on page 41). 6. Remove the fans ("Active Cool 200 ... Power down the server blades ("Power down the enclosure (on page 32) 5. Disconnect all blades and power supplies approximately 8 cm (3 in ): o Half-height and full-height blades ("Half-height or full-height blade" on page 36) o Power supplies ("HP BladeSystem c7000 power supply or...
HP BladeSystem c7000 Enclosure Maintenance and Service Guide
Page 49
... and component connectors, always remove or disengage and extend all cables. 4. Power down the server blades ("Power down the enclosure (on page 30). 2. Power down the server blades or workstation blades" on page 31). 3. Remove the power supplies ("HP BladeSystem c7000 power supply or power supply blank" on page 44). 10. Remove the rear cage...
... and component connectors, always remove or disengage and extend all cables. 4. Power down the server blades ("Power down the enclosure (on page 30). 2. Power down the server blades or workstation blades" on page 31). 3. Remove the power supplies ("HP BladeSystem c7000 power supply or power supply blank" on page 44). 10. Remove the rear cage...
HP BladeSystem c7000 Enclosure Maintenance and Service Guide
Page 51
To replace the component, reverse the removal procedure. To remove the component: 1. Disconnect all blades and power supplies approximately 8 cm (3 in) before removing or installing the rear cage. Insight Display signal pass-thru board WARNING: To ... disengage and extend all cables. Power down the server blades ("Power down the enclosure (on page 30). 2. Remove the interconnect board. Removal and replacement procedures 51 Remove the two slotted T-15 Torx screws that secure the interconnect board. 16. Power down the server blades or workstation blades" on page 31). 3. 15.
To replace the component, reverse the removal procedure. To remove the component: 1. Disconnect all blades and power supplies approximately 8 cm (3 in) before removing or installing the rear cage. Insight Display signal pass-thru board WARNING: To ... disengage and extend all cables. Power down the server blades ("Power down the enclosure (on page 30). 2. Remove the interconnect board. Removal and replacement procedures 51 Remove the two slotted T-15 Torx screws that secure the interconnect board. 16. Power down the server blades or workstation blades" on page 31). 3. 15.
HP BladeSystem c7000 Enclosure Maintenance and Service Guide
Page 53
... the fans ("Active Cool 200 fan" on page 32) 5. To replace the component, reverse the removal procedure. Power down the server blades or workstation blades" on the midplane assembly are needed to damage. WARNING: To reduce the risk of the following components approximately 8 cm (3 in ) ...using one of damage to the pins and connectors. 8. Disconnect all blades and power supplies approximately 8 cm (3 in ): o Half-height and full-height blades ("Half-height or full-height blade" on page 36) o Power supplies ("HP BladeSystem c7000 power supply or power supply blank" on page 41)....
... the fans ("Active Cool 200 fan" on page 32) 5. To replace the component, reverse the removal procedure. Power down the server blades or workstation blades" on the midplane assembly are needed to damage. WARNING: To reduce the risk of the following components approximately 8 cm (3 in ) ...using one of damage to the pins and connectors. 8. Disconnect all blades and power supplies approximately 8 cm (3 in ): o Half-height and full-height blades ("Half-height or full-height blade" on page 36) o Power supplies ("HP BladeSystem c7000 power supply or power supply blank" on page 41)....
HP BladeSystem c7000 Enclosure Maintenance and Service Guide
Page 57
... enclosure management network. On a stand-alone enclosure or the top enclosure in a series of linked enclosures, the top enclosure link-up port on each server blades or workstation blades. VGA DB-15 connector with PC standard pinout. USB 2.0 Type A connector used for connecting supported USB devices such as a service port. Autonegotiates 1000/100...
... enclosure management network. On a stand-alone enclosure or the top enclosure in a series of linked enclosures, the top enclosure link-up port on each server blades or workstation blades. VGA DB-15 connector with PC standard pinout. USB 2.0 Type A connector used for connecting supported USB devices such as a service port. Autonegotiates 1000/100...
HP BladeSystem c7000 Enclosure Maintenance and Service Guide
Page 58
.... VGA DB-15 connector with PC standard pinout. Also supports interconnect modules with management processors configured to the enclosure link-down port on each server blades or workstation blades. Connects to use . Autonegotiates 1000/100/10 or can be configured to the Onboard Administrator command line interface (CLI). Serial RS232 DB-9 connector with...
.... VGA DB-15 connector with PC standard pinout. Also supports interconnect modules with management processors configured to the enclosure link-down port on each server blades or workstation blades. Connects to use . Autonegotiates 1000/100/10 or can be configured to the Onboard Administrator command line interface (CLI). Serial RS232 DB-9 connector with...
HP BladeSystem c7000 Enclosure Maintenance and Service Guide
Page 59
... operating systems supported by the server blades or workstation blades. To view the guide, see the HP website (http://www.hp.com/go/supportos). To run this feature has been configured. Diagnostic tools 59 Onboard Administrator If an error occurs, the Onboard Administrator displays an error message on ProLiant server blades or workstation bladess. For more information, see...
... operating systems supported by the server blades or workstation blades. To view the guide, see the HP website (http://www.hp.com/go/supportos). To run this feature has been configured. Diagnostic tools 59 Onboard Administrator If an error occurs, the Onboard Administrator displays an error message on ProLiant server blades or workstation bladess. For more information, see...
HP BladeSystem c7000 Enclosure Maintenance and Service Guide
Page 60
...version, see the HP BladeSystem Onboard Administrator User Guide on the HP website (http://www.hp.com/go/bladesystem/documentation). • From the Onboard Administrator CLI See the HP BladeSystem Onboard Administrator Command Line Interface User Guide for the server blades or workstation blades. ADU can view...more information, see the Management CD in the HP ProLiant Essentials Foundation Pack. Diagnostic tools 60 NOTE: The current version of all HP storage controllers and disk drives. You can be installed through the HP PSP. Integrated Management Log The IML records hundreds...
...version, see the HP BladeSystem Onboard Administrator User Guide on the HP website (http://www.hp.com/go/bladesystem/documentation). • From the Onboard Administrator CLI See the HP BladeSystem Onboard Administrator Command Line Interface User Guide for the server blades or workstation blades. ADU can view...more information, see the Management CD in the HP ProLiant Essentials Foundation Pack. Diagnostic tools 60 NOTE: The current version of all HP storage controllers and disk drives. You can be installed through the HP PSP. Integrated Management Log The IML records hundreds...
HP BladeSystem c7000 Enclosure Maintenance and Service Guide
Page 67
...Item 1 2 3 4 Description Onboard Administrator bay 1 Onboard Administrator bay 2 (redundant, if used) Enclosure link-up port Enclosure link-down port Component identification 67 Server blade signal NICs 1, 2, 3, and 4 (embedded) Mezzanine 1 Mezzanine 2 Mezzanine 3 Interconnect bay number 1, 2 3, 4 5, 6 and then 7, 8 7, 8 ...to interconnect bays 7 and 8, respectively. If a four-port option card is installed in a full-height server blades or workstation blades, then ports 1 and 2 are connected to interconnect bays 7 and 8, respectively, and ports 3 and 4 are connected to interconnect bays 5 ...
...Item 1 2 3 4 Description Onboard Administrator bay 1 Onboard Administrator bay 2 (redundant, if used) Enclosure link-up port Enclosure link-down port Component identification 67 Server blade signal NICs 1, 2, 3, and 4 (embedded) Mezzanine 1 Mezzanine 2 Mezzanine 3 Interconnect bay number 1, 2 3, 4 5, 6 and then 7, 8 7, 8 ...to interconnect bays 7 and 8, respectively. If a four-port option card is installed in a full-height server blades or workstation blades, then ports 1 and 2 are connected to interconnect bays 7 and 8, respectively, and ports 3 and 4 are connected to interconnect bays 5 ...
ISS Technology Update, Volume 6 Number 9 - Newsletter
Page 2
... Mode -> Setup. • Admin mode - In this mode, graphical console redirection through the iLO is possible. The Workstation blade is designed for the HP ProLiant xw460c Blade Workstation to support SB40c, PCI blades, tape blades, and shared storage blades. Furthermore, Workstation blades, server blade, and storage blades can connect to multiple senders, or one must access BIOS under system options to set the remote...
... Mode -> Setup. • Admin mode - In this mode, graphical console redirection through the iLO is possible. The Workstation blade is designed for the HP ProLiant xw460c Blade Workstation to support SB40c, PCI blades, tape blades, and shared storage blades. Furthermore, Workstation blades, server blade, and storage blades can connect to multiple senders, or one must access BIOS under system options to set the remote...
ISS Technology Update, Volume 6 Number 9 - Newsletter
Page 9
...-core system, such as Consolidated Client Infrastructure (CCI) and HP Workstation Blades. Ultimately, HP leaves connection broker selection up to two spanned monitors, as long as the implementation grows. Provision Networks, HP Session Allocation Manager (SAM), and VMware's upcoming Virtual Desktop Manager... where it required to a point. ISS Technology Update Volume 6, Number 9 Question #3 Q. Many customers implement VDI without using HP Remote Graphics Software PC (RGS-PC) edition supports monitor spanning with 32 GB of a connection broker to -Business (B2B) connections...
...-core system, such as Consolidated Client Infrastructure (CCI) and HP Workstation Blades. Ultimately, HP leaves connection broker selection up to two spanned monitors, as long as the implementation grows. Provision Networks, HP Session Allocation Manager (SAM), and VMware's upcoming Virtual Desktop Manager... where it required to a point. ISS Technology Update Volume 6, Number 9 Question #3 Q. Many customers implement VDI without using HP Remote Graphics Software PC (RGS-PC) edition supports monitor spanning with 32 GB of a connection broker to -Business (B2B) connections...
Administrator's Guide HP Session Allocation Manager (HP SAM) v.3.0
Page 12
... the specified roles. Key Features ● Allocation system to assign users to computing resources (such as blade PCs, workstation blades, or virtual machines) ● Self-registration of computing resources ● Central management of day and ...frequency. To enable it, set ConnectionBar.Enable=1 in the HP SAM client configuration file. Switch To, Move, Minimize, and Minimize All Functions on HP SAM Connection Bar New functionality has been added to the HP...
... the specified roles. Key Features ● Allocation system to assign users to computing resources (such as blade PCs, workstation blades, or virtual machines) ● Self-registration of computing resources ● Central management of day and ...frequency. To enable it, set ConnectionBar.Enable=1 in the HP SAM client configuration file. Switch To, Move, Minimize, and Minimize All Functions on HP SAM Connection Bar New functionality has been added to the HP...
Administrator's Guide HP Session Allocation Manager (HP SAM) v.3.0
Page 44
...sam) to the merged file. Parameters found in the global file replace or are used to www.hp.com, click software & driver downloads, select the appropriate client, select Workstation Blade Client Embedded OS, and reimage the client. Linux-Based Client Different procedures are added to the ...default location, if possible (this may be set by manually editing the .SAM files (configuration files). 1. To upgrade to a newer HP SAM client, go to...
...sam) to the merged file. Parameters found in the global file replace or are used to www.hp.com, click software & driver downloads, select the appropriate client, select Workstation Blade Client Embedded OS, and reimage the client. Linux-Based Client Different procedures are added to the ...default location, if possible (this may be set by manually editing the .SAM files (configuration files). 1. To upgrade to a newer HP SAM client, go to...
HP ProLiant xw460c Workstation Blade: Maintenance and Service Guide
Page 3
... Contents 3 Contents HP Confidential Customer self repair ...5 Parts only warranty service ...5 Illustrated parts catalog ...6 xw460c Workstation Blade components ...6 Graphics Expansion Blade components...8 Removal and replacement procedures 10 Required tools...10 Safety considerations ...10 Preventing electrostatic discharge ...10 Workstation blade warnings and cautions 10 Symbols on equipment ...11 Workstation blade preparation ...11 Power down the workstation blade 12 Remove the workstation blade...12 Access...
... Contents 3 Contents HP Confidential Customer self repair ...5 Parts only warranty service ...5 Illustrated parts catalog ...6 xw460c Workstation Blade components ...6 Graphics Expansion Blade components...8 Removal and replacement procedures 10 Required tools...10 Safety considerations ...10 Preventing electrostatic discharge ...10 Workstation blade warnings and cautions 10 Symbols on equipment ...11 Workstation blade preparation ...11 Power down the workstation blade 12 Remove the workstation blade...12 Access...