HD Writing Head Service Document
Page 41
... UI user level to Standby mode. 2. After the HW installation is completed, configure the press configuration. Turn on the press and go to Customer Engineer. 5. Install the WH parameters. ● Insert the WH parameters disk to document CA493-02940 - Engine Substrate Path Service.pdf (pages 117-147). 6. Perform basic substrate transport calibrations: Refer to the press PC. ● Run the 8.xxxxx.bat file...
... UI user level to Standby mode. 2. After the HW installation is completed, configure the press configuration. Turn on the press and go to Customer Engineer. 5. Install the WH parameters. ● Insert the WH parameters disk to document CA493-02940 - Engine Substrate Path Service.pdf (pages 117-147). 6. Perform basic substrate transport calibrations: Refer to the press PC. ● Run the 8.xxxxx.bat file...
HD Writing Head Service Document
Page 63
... usually be performed when installing a new WH. Select the Screen set you are using the CPG tool, select Analyze DA2LP Factors to Step 9 below. 4. Appendix A - Put the press in ready mode. 2. After the factors analysis is the first time using . 6. Manually calibrating the scan band with the CPG external tool. 1. Copy the CPG SW files to manually calibrate the scan band with the...
... usually be performed when installing a new WH. Select the Screen set you are using the CPG tool, select Analyze DA2LP Factors to Step 9 below. 4. Appendix A - Put the press in ready mode. 2. After the factors analysis is the first time using . 6. Manually calibrating the scan band with the CPG external tool. 1. Copy the CPG SW files to manually calibrate the scan band with the...
B&R Drivers Troubleshooting -- Document P/N:CA493-00610 Rev Revision number:01
Page 50
... other LEDs on the unit. X2X communication failure: ● If both X2Xr and X2Xe LEDs are ON, refer to the network power link diagram in the press wiring diagram (in CE Suitcase) to determine where the cable connection is faulty. 48 Chapter 5 Bridge Servo Motor Driver Micro Test If no other LEDs are OFF: Check that power is supplied to the...
... other LEDs on the unit. X2X communication failure: ● If both X2Xr and X2Xe LEDs are ON, refer to the network power link diagram in the press wiring diagram (in CE Suitcase) to determine where the cable connection is faulty. 48 Chapter 5 Bridge Servo Motor Driver Micro Test If no other LEDs are OFF: Check that power is supplied to the...
B&R Drivers Troubleshooting -- Document P/N:CA493-00610 Rev Revision number:01
Page 60
... to the drive by examining other LEDs on the drive. ● If the RDY green LED is blinking, wait 15 minutes for firmware update, then check the LED again. Wait 15 minutes for a firmware update or initialization process to determine where the cable connection is faulty. 5. Check that power is supplied to the drive. If the issue persists, replace the drive. 58 Chapter 6 Stepper Motor Driver Micro Test
... to the drive by examining other LEDs on the drive. ● If the RDY green LED is blinking, wait 15 minutes for firmware update, then check the LED again. Wait 15 minutes for a firmware update or initialization process to determine where the cable connection is faulty. 5. Check that power is supplied to the drive. If the issue persists, replace the drive. 58 Chapter 6 Stepper Motor Driver Micro Test
Software v3.5 I-Fix 1 Installation
Page 2
Forced Stacker Jog Offset plugin...16 Custom configuration - No hide shortcut...4 Updating Windows...5 Installing the Vcorn filter driver...5 Activating Color Beat...7 Installing the software...7 Installing software v3.5 I-Fix 1 Monochrome plugin...11 3 Post-installation procedures ...13 Configuring the press monitor...13 Configuring the bridge fan...14 Configuring the imaging oil recycling type for HP Indigo 10000 HD presses without LDD 15 Custom configuration - Clearing dongle data...30 Restoring the press configuration ...31 Barcode reader calibration ...33...
Forced Stacker Jog Offset plugin...16 Custom configuration - No hide shortcut...4 Updating Windows...5 Installing the Vcorn filter driver...5 Activating Color Beat...7 Installing the software...7 Installing software v3.5 I-Fix 1 Monochrome plugin...11 3 Post-installation procedures ...13 Configuring the press monitor...13 Configuring the bridge fan...14 Configuring the imaging oil recycling type for HP Indigo 10000 HD presses without LDD 15 Custom configuration - Clearing dongle data...30 Restoring the press configuration ...31 Barcode reader calibration ...33...
Software v3.5 I-Fix 1 Installation
Page 4
...; Press computer: - Prerequisites It explains the prerequisites required to install software version 3.5 I-Fix 1. The BHV Service Note part number is a customized PLC FW Contact Escalation Center (T4) for instructions before installing v3.5 I -Fix 1 and must be replaced. S. In the table below contain the old BHV board that does not support software versions 3.5 and V3.5 I -Fix 1. Nansha site Prima Graphia T/A Pureprint Group Ltd PRESSING...
...; Press computer: - Prerequisites It explains the prerequisites required to install software version 3.5 I-Fix 1. The BHV Service Note part number is a customized PLC FW Contact Escalation Center (T4) for instructions before installing v3.5 I -Fix 1 and must be replaced. S. In the table below contain the old BHV board that does not support software versions 3.5 and V3.5 I -Fix 1. Nansha site Prima Graphia T/A Pureprint Group Ltd PRESSING...
Software v3.5 I-Fix 1 Installation
Page 8
... the Startup folder. At the end of the software upgrade. 2. Repeat the steps above ) any modified Start icon that there are any other updates. Click the View tab and select Devices by connection. Select Check for the updates to 5 minutes for Updates. 4. This prevents Windows update from starting in the window below. 5. Updating Windows 5 Manually delete (as shown in the image above to Start > Control Panel > Windows Updates. 3.
... the Startup folder. At the end of the software upgrade. 2. Repeat the steps above ) any modified Start icon that there are any other updates. Click the View tab and select Devices by connection. Select Check for the updates to 5 minutes for Updates. 4. This prevents Windows update from starting in the window below. 5. Updating Windows 5 Manually delete (as shown in the image above to Start > Control Panel > Windows Updates. 3.
Software v3.5 I-Fix 1 Installation
Page 11
... S:\HP support b. For presses with the MR2 configuration with PLC 620 (that is, press S/Ns 50000230-50000291) that do not have the 100700047_UnifiedPlugin i4 installed, do the following: a. After the auto-download of PLC starts and the PLC loses communications, shut down the press power only, without the PC. 8 Chapter 2 Procedures Double-click Setup.exe to the S:\ drive. Run the HP Indigo...
... S:\HP support b. For presses with the MR2 configuration with PLC 620 (that is, press S/Ns 50000230-50000291) that do not have the 100700047_UnifiedPlugin i4 installed, do the following: a. After the auto-download of PLC starts and the PLC loses communications, shut down the press power only, without the PC. 8 Chapter 2 Procedures Double-click Setup.exe to the S:\ drive. Run the HP Indigo...
Software v3.5 I-Fix 1 Installation
Page 14
11. Installing software v3.5 I-Fix 1 Monochrome plugin Install the v3.5 I -Fix 1 Monochrome plugin 11 Shut down the press software. 2. Installing software v3.5 I -Fix 1 Monochrome plugin as follows: NOTE: For customers without HP Indigo Radar, use the plugin file from the S drive. 1. Copy the Setup folder to the press, click Skip Safety PLC Update. Start HP Indigo Radar from Start > Programs > Indigo Radar > Indigo Radar. If the window below appears indicating that the software is...
11. Installing software v3.5 I-Fix 1 Monochrome plugin Install the v3.5 I -Fix 1 Monochrome plugin 11 Shut down the press software. 2. Installing software v3.5 I -Fix 1 Monochrome plugin as follows: NOTE: For customers without HP Indigo Radar, use the plugin file from the S drive. 1. Copy the Setup folder to the press, click Skip Safety PLC Update. Start HP Indigo Radar from Start > Programs > Indigo Radar > Indigo Radar. If the window below appears indicating that the software is...
Software v3.5 I-Fix 1 Installation
Page 23
..., change to CE Mode. 3. Under InksBypassEntity, select the check boxes of the following parameters: ● BypassValue ● IsPersitend 20 Chapter 3 Post-installation procedures NOTE: Perform this procedure only on PP presses with S/N between 50000100 and 50000129. In the List View tab, select InkCabinateSensorActivatedEntity 4. Click Start > Press Explorer and click Entities. 2. The ink replacement feature does not work on HP Indigo 10000...
..., change to CE Mode. 3. Under InksBypassEntity, select the check boxes of the following parameters: ● BypassValue ● IsPersitend 20 Chapter 3 Post-installation procedures NOTE: Perform this procedure only on PP presses with S/N between 50000100 and 50000129. In the List View tab, select InkCabinateSensorActivatedEntity 4. Click Start > Press Explorer and click Entities. 2. The ink replacement feature does not work on HP Indigo 10000...
Software v3.5 I-Fix 1 Installation
Page 24
Make sure that the press is working properly, perform a system backup as follows: 1. In the HP Indigo PC Backup And Restore window, do not work. 3. Backing up the system 21 When booting from the backup hard disk, USB 3 ports do the following: Backing up the system After verifying that the keyboard and mouse are connected to USB 2 ports. 6. In the Home tab, click DB Access Update. From the Start menu, run the HP Indigo PC Backup and Restore utility. 4. Shut down the press software. 2.
Make sure that the press is working properly, perform a system backup as follows: 1. In the HP Indigo PC Backup And Restore window, do not work. 3. Backing up the system 21 When booting from the backup hard disk, USB 3 ports do the following: Backing up the system After verifying that the keyboard and mouse are connected to USB 2 ports. 6. In the Home tab, click DB Access Update. From the Start menu, run the HP Indigo PC Backup and Restore utility. 4. Shut down the press software. 2.
Software v3.5 I-Fix 1 Installation
Page 32
In the Counter's Editor, go to get a one -day password. 5. Close the Counter Editor and restart the press software. In the User Authorization window, enter the one -day password for the Counter's Editor. 2. Restore the counters as shown below: 7. Restoring the press counters 29 Contact your local logistic center to Indigo > Counters > Indigo > Services > Printing > Counters > PrintCountersEntry. 6. 1. Using Windows Explorer, open the counter editor that is in S:\Indigo\Indigo.Infra.CountersEditor.exe 4. Shut down the press software. 3.
In the Counter's Editor, go to get a one -day password. 5. Close the Counter Editor and restart the press software. In the User Authorization window, enter the one -day password for the Counter's Editor. 2. Restore the counters as shown below: 7. Restoring the press counters 29 Contact your local logistic center to Indigo > Counters > Indigo > Services > Printing > Counters > PrintCountersEntry. 6. 1. Using Windows Explorer, open the counter editor that is in S:\Indigo\Indigo.Infra.CountersEditor.exe 4. Shut down the press software. 3.
CA493-00130 Rev
Page 24
... do not need to Disable. Clean the charge roller with water-based wipe.. 3. Roller bearing plastic insulation is wet after printing 22 Chapter 5 Troubleshooting Replace the roller. Disable = 0 ● After the force calibration, you want to re-force the calibration, set the parameter to remove the motor.) Troubleshooting the charge roller leveling failure - mechanical problem on page 22. Clean the balancing roller with distilled water and a lint-free wipe. 4. Make sure...
... do not need to Disable. Clean the charge roller with water-based wipe.. 3. Roller bearing plastic insulation is wet after printing 22 Chapter 5 Troubleshooting Replace the roller. Disable = 0 ● After the force calibration, you want to re-force the calibration, set the parameter to remove the motor.) Troubleshooting the charge roller leveling failure - mechanical problem on page 22. Clean the balancing roller with distilled water and a lint-free wipe. 4. Make sure...
Peak Season Baseline
Page 8
... the operator) Baseline Preparations Follow these steps for after the baseline. ● Print CATP (10 copies duplex) ● Grey 20 (10 copies) ● Customer job (if relevant - Remove all open calls as much as possible. 6 Chapter 2 Baseline checklist tasks Run first transfer. 5. In case an update is working well (depends on the PQ and the life span). 2. Select Install updates. 6. Replace blanket and impression paper...
... the operator) Baseline Preparations Follow these steps for after the baseline. ● Print CATP (10 copies duplex) ● Grey 20 (10 copies) ● Customer job (if relevant - Remove all open calls as much as possible. 6 Chapter 2 Baseline checklist tasks Run first transfer. 5. In case an update is working well (depends on the PQ and the life span). 2. Select Install updates. 6. Replace blanket and impression paper...
Peak Season Baseline
Page 9
... 20 sheets of a light substrate (70 -90 gsm). Look for peak season. Check all sources feed module green belts, pulleys, drive belts, bearings, and tornados. IFR Clean the IFR sensors and substrate path area (see CA493-04500 ILS Baseline. 5. Clean the Pip drum Electrometer. Clean the ILS glass. Operator Preventive Maintenance Procedures). Check all sources side blowers - Suction cups - ILS - Charge roller: a. Duplex - Cleaning station - b. Feeder Follow...
... 20 sheets of a light substrate (70 -90 gsm). Look for peak season. Check all sources feed module green belts, pulleys, drive belts, bearings, and tornados. IFR Clean the IFR sensors and substrate path area (see CA493-04500 ILS Baseline. 5. Clean the Pip drum Electrometer. Clean the ILS glass. Operator Preventive Maintenance Procedures). Check all sources side blowers - Suction cups - ILS - Charge roller: a. Duplex - Cleaning station - b. Feeder Follow...
Peak Season Baseline
Page 10
... path. (See CA494-07860 - Operator Preventive Maintenance Procedures) 2. Perform Load Cell Calibration. (See CA493-00400 - Electronic cabinet Maintenance of the computer using lint-free cloth. 2. Check the stacker bridge vacuum belts for leaks replace if necessary. 2. Clean the ITM hood and EBV air channels and filters. (See CA493-03810 - Ink cabinet Maintenance of the stacker. 1. Ink Cabinet Service) 3. Perform Ink Conductivity Calibration (See CA493...
... path. (See CA494-07860 - Operator Preventive Maintenance Procedures) 2. Perform Load Cell Calibration. (See CA493-00400 - Electronic cabinet Maintenance of the computer using lint-free cloth. 2. Check the stacker bridge vacuum belts for leaks replace if necessary. 2. Clean the ITM hood and EBV air channels and filters. (See CA493-03810 - Ink cabinet Maintenance of the stacker. 1. Ink Cabinet Service) 3. Perform Ink Conductivity Calibration (See CA493...
SmartStream Production Pro Print Server - Inline Horizon SmartStacker How-to GuideHow-to Guide
Page 4
Printing a job containing a finisher function currently not installed on the finisher 20 9 Error recovery ...22 10 Unsupported cases for DFE imposition...23 11 Files...25 Appendix A Blank page removal limitations...26 Appendix B Installation instructions ...27 Installation on the press...27 Installation on the FLC ...27 Appendix C Service and support ...29 Printing instructions...29 iv
Printing a job containing a finisher function currently not installed on the finisher 20 9 Error recovery ...22 10 Unsupported cases for DFE imposition...23 11 Files...25 Appendix A Blank page removal limitations...26 Appendix B Installation instructions ...27 Installation on the press...27 Installation on the FLC ...27 Appendix C Service and support ...29 Printing instructions...29 iv
SmartStream Production Pro Print Server - Inline Horizon SmartStacker How-to GuideHow-to Guide
Page 7
... someone prints a duplex job directly to perform the following figure shows a representation of the press. 2. To overcome this, it is recommended to the SmartStacker, the sheet's leading edge at the press input and output after the sheet flips over. 2 Press configuration The HP Indigo 10000 Digital Press normally aligns the sheets to their leading edge. The Horizon SmartStacker aligns sheets to the rear side of jobs are using.
... someone prints a duplex job directly to perform the following figure shows a representation of the press. 2. To overcome this, it is recommended to the SmartStacker, the sheet's leading edge at the press input and output after the sheet flips over. 2 Press configuration The HP Indigo 10000 Digital Press normally aligns the sheets to their leading edge. The Horizon SmartStacker aligns sheets to the rear side of jobs are using.
SmartStream Production Pro Print Server - Inline Horizon SmartStacker How-to GuideHow-to Guide
Page 13
This means that the printing order is immediately delivered to the SmartStacker. Printing and processing order 9 4 Printing and processing order Each sheet the press prints is the same as the cutting order by SmartStacker. Barcodes and banner sheets on page 7 depicts the printing and processing order for the HP Indigo 10000 Digital Press and the Horizon SmartStacker, respectively.
This means that the printing order is immediately delivered to the SmartStacker. Printing and processing order 9 4 Printing and processing order Each sheet the press prints is the same as the cutting order by SmartStacker. Barcodes and banner sheets on page 7 depicts the printing and processing order for the HP Indigo 10000 Digital Press and the Horizon SmartStacker, respectively.
SmartStream Production Pro Print Server - Inline Horizon SmartStacker How-to GuideHow-to Guide
Page 23
...window. ● Or do either of the DFE and performs a validation check before printing each job to confirm the job can be finished. A validation failure icon appears on the press UI, as shown below. Figure 8-1 JDF validation failed Processing method 19 The job is validated when it is next to the job's name. Open the job...the DFE, click the Needs Attention yellow mark that is sent to a press queue. Correct the relevant errors before printing The UBM is loaded to the DFE. Remove the job from printing the job. If a validation check fails, the press prevents the user from the press to...
...window. ● Or do either of the DFE and performs a validation check before printing each job to confirm the job can be finished. A validation failure icon appears on the press UI, as shown below. Figure 8-1 JDF validation failed Processing method 19 The job is validated when it is next to the job's name. Open the job...the DFE, click the Needs Attention yellow mark that is sent to a press queue. Correct the relevant errors before printing The UBM is loaded to the DFE. Remove the job from printing the job. If a validation check fails, the press prevents the user from the press to...