Model: ALL MODELS Installation
Page 4
... to external chlorination) Wire/conduit for mounting ECOMMAND 4 Valves (use standard Hayward, Pentair/Compool, or Jandy valves) Additional valve actuators Accessory Products - System Startup and checkout (page 24) 3. Order Separately AQL2-SS-RF Wireless Spa Side Remote Control (Included with HPC-4-RC, HPC-4-ACT-RC) AQL2-BASE-RF Base Station required if using AQL2...
... to external chlorination) Wire/conduit for mounting ECOMMAND 4 Valves (use standard Hayward, Pentair/Compool, or Jandy valves) Additional valve actuators Accessory Products - System Startup and checkout (page 24) 3. Order Separately AQL2-SS-RF Wireless Spa Side Remote Control (Included with HPC-4-RC, HPC-4-ACT-RC) AQL2-BASE-RF Base Station required if using AQL2...
Model: ALL MODELS Installation
Page 5
... Air Sensor Mount the air sensor outdoors. ! If in doubt about the distance, test operation before either side with HPC-4-RC, HPC-4- Mounting the Equipment ECOMMAND 4 Control Center The ECOMMAND 4 is contained in and around the pool/spa area. For maximum temperature accuracy, cover the sensor...that the standard cables supplied with the temperature sensors, and valve actuators (if applicable) are included with AQL2-SS-RF wireless remote control only. This information can be installed at all chips and burrs. 2. 1. Position hose clamp over the sensor and gently tighten...
... Air Sensor Mount the air sensor outdoors. ! If in doubt about the distance, test operation before either side with HPC-4-RC, HPC-4- Mounting the Equipment ECOMMAND 4 Control Center The ECOMMAND 4 is contained in and around the pool/spa area. For maximum temperature accuracy, cover the sensor...that the standard cables supplied with the temperature sensors, and valve actuators (if applicable) are included with AQL2-SS-RF wireless remote control only. This information can be installed at all chips and burrs. 2. 1. Position hose clamp over the sensor and gently tighten...
Model: ALL MODELS Installation
Page 6
To install the base station, remove the knockout on the upper left side of the ECOMMAND 4 main control unit, insert the base station, and then tighten the nut from the inside. Optional Valve Actuators (included with the ECOMMAND 4-note that the internal cams ...-RF is mounted on the valve and the desired valve action. RETURN SUCTION OUT OUT IN IN (ComINmon) OUT (Common) 3 Optional Base Station (included with HPC-4-RC, HPC-4-ACT-RC) The AQL2-BASE-RF optional base station must be adjusted depending on the way the actuator is used with...
To install the base station, remove the knockout on the upper left side of the ECOMMAND 4 main control unit, insert the base station, and then tighten the nut from the inside. Optional Valve Actuators (included with the ECOMMAND 4-note that the internal cams ...-RF is mounted on the valve and the desired valve action. RETURN SUCTION OUT OUT IN IN (ComINmon) OUT (Common) 3 Optional Base Station (included with HPC-4-RC, HPC-4-ACT-RC) The AQL2-BASE-RF optional base station must be adjusted depending on the way the actuator is used with...