Hardware Installation Guide
Page 9
... network devices to provide fault tolerance, flexibility, port density, robust security and maximum throughput with DC Power. • DGS-3620-28PC: Twenty Copper PoE ports (10/100/1000Mbps), Four Combo Copper PoE/SFP ports (10/100/1000Mbps and 100/1000Mbps),...xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide Chapter 1 Introduction Switch Description Features Ports Front-Panel Components Rear Panel Description Side Panel Description Switch Description The D-Link DGS-3620 Series is a high performance member of switches: • DGS-3620-28TC...
... network devices to provide fault tolerance, flexibility, port density, robust security and maximum throughput with DC Power. • DGS-3620-28PC: Twenty Copper PoE ports (10/100/1000Mbps), Four Combo Copper PoE/SFP ports (10/100/1000Mbps and 100/1000Mbps),...xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide Chapter 1 Introduction Switch Description Features Ports Front-Panel Components Rear Panel Description Side Panel Description Switch Description The D-Link DGS-3620 Series is a high performance member of switches: • DGS-3620-28TC...
Hardware Installation Guide
Page 11
...xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide Ports The following table lists the ports that are equipt with one Alarm Port and SD Card Slot. DGS-3620-28PC... interested in D-View, D-Link Corporation's proprietary SNMP management software, go to a PC) • All the switches are present within each switch. DGS-3620-28SC-DC Twenty SFP ports.../1000Mbps), Four SFP+ ports (10GE), Layer 3 Stackable Managed Switch with DC Power. DGS-3620-28TC-DC Twenty Copper ports (10/100/1000Mbps), Four Combo Copper/SFP ports (10/100/1000Mbps...
...xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide Ports The following table lists the ports that are equipt with one Alarm Port and SD Card Slot. DGS-3620-28PC... interested in D-View, D-Link Corporation's proprietary SNMP management software, go to a PC) • All the switches are present within each switch. DGS-3620-28SC-DC Twenty SFP ports.../1000Mbps), Four SFP+ ports (10GE), Layer 3 Stackable Managed Switch with DC Power. DGS-3620-28TC-DC Twenty Copper ports (10/100/1000Mbps), Four Combo Copper/SFP ports (10/100/1000Mbps...
Hardware Installation Guide
Page 12
... in more detail. Figure 1-1 Front panel view of a DGS-3620-28TC Switch Figure 1-2 Front panel view of a DGS-3620-28TC-DC Switch Figure 1-3 Front panel view of a DGS-3620-28SC Switch Figure 1-4 Front panel view of a DGS-3620-28SC-DC Switch Figure 1-5 Front panel view of a DGS-3620-28PC Switch Figure 1-5 Front panel view of a DGS-3620-52T Switch Figure 1-6 Front panel view of a Management...
... in more detail. Figure 1-1 Front panel view of a DGS-3620-28TC Switch Figure 1-2 Front panel view of a DGS-3620-28TC-DC Switch Figure 1-3 Front panel view of a DGS-3620-28SC Switch Figure 1-4 Front panel view of a DGS-3620-28SC-DC Switch Figure 1-5 Front panel view of a DGS-3620-28PC Switch Figure 1-5 Front panel view of a DGS-3620-52T Switch Figure 1-6 Front panel view of a Management...
Hardware Installation Guide
Page 13
...for a DGS-3620-28TC Switch Figure 1-8 LED indicators for a DGS-3620-28TC-DC Switch Figure 1-9 LED indicators for a DGS-3620-28SC Switch Figure 1-10 LED indicators for a DGS-3620-28SC-DC Switch Figure 1-11 LED indicators for all ports including the Gigabit Ethernet ports. The DGS-3620-28PC and DGS-3620-52P ... mode. xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide LED Indicators The Switch front panel presents LED indicators for Power, Console, RPS, Master (stack control), SD, Stack ID and Link/Act indicators for a DGS-3620-28PC Switch 13...
...for a DGS-3620-28TC Switch Figure 1-8 LED indicators for a DGS-3620-28TC-DC Switch Figure 1-9 LED indicators for a DGS-3620-28SC Switch Figure 1-10 LED indicators for a DGS-3620-28SC-DC Switch Figure 1-11 LED indicators for all ports including the Gigabit Ethernet ports. The DGS-3620-28PC and DGS-3620-52P ... mode. xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide LED Indicators The Switch front panel presents LED indicators for Power, Console, RPS, Master (stack control), SD, Stack ID and Link/Act indicators for a DGS-3620-28PC Switch 13...
Hardware Installation Guide
Page 14
...Link and Activity. xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide Figure 1-12 LED indicators for a DGS-3620-52T Switch Figure 1-13 LED indicators for a DGS-3620-52P Switch LED Power Console RPS SD Stack ID Link.../Act LEDs PoE Description This LED will light green after powering the Switch on to indicate the ready state of a DGS-3620-28TC... in use . Only the DGS-3620-28PC and the DGS-3620-52P switches are equipt with a solid ...
...Link and Activity. xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide Figure 1-12 LED indicators for a DGS-3620-52T Switch Figure 1-13 LED indicators for a DGS-3620-52P Switch LED Power Console RPS SD Stack ID Link.../Act LEDs PoE Description This LED will light green after powering the Switch on to indicate the ready state of a DGS-3620-28TC... in use . Only the DGS-3620-28PC and the DGS-3620-52P switches are equipt with a solid ...
Hardware Installation Guide
Page 15
...6 inches of the cord into a power outlet. An optional external Redundant Power Supply (DPS-500 for DGS-3620-28TC/28SC/26SC/52T, DPS-700 for proper ventilation. Without proper heat dissipation and air circulation, system components ...xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide Figure 1-15 Rear panel view of a DGS-3620-28TC-DC Switch Figure 1-16 Rear panel view of a DGS-3620-28SC Switch Figure 1-17 Rear panel view of a DGS-3620-28SC-DC Switch Figure 1-18 Rear panel view of a DGS-3620-28PC Switch Figure 1-19 Rear panel view of a DGS-3620...
...6 inches of the cord into a power outlet. An optional external Redundant Power Supply (DPS-500 for DGS-3620-28TC/28SC/26SC/52T, DPS-700 for proper ventilation. Without proper heat dissipation and air circulation, system components ...xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide Figure 1-15 Rear panel view of a DGS-3620-28TC-DC Switch Figure 1-16 Rear panel view of a DGS-3620-28SC Switch Figure 1-17 Rear panel view of a DGS-3620-28SC-DC Switch Figure 1-18 Rear panel view of a DGS-3620-28PC Switch Figure 1-19 Rear panel view of a DGS-3620...
Hardware Installation Guide
Page 16
xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide Figure 1-21 Side panels view of a DGS-3620-28TC Switch Figure 1-22 Side panels view of a DGS-3620-28TC-DC Switch Figure 1-23 Side panels view of a DGS-3620-28SC Switch Figure 1-24 Side panels view of a DGS-3620-28SC-DC Switch 16
xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide Figure 1-21 Side panels view of a DGS-3620-28TC Switch Figure 1-22 Side panels view of a DGS-3620-28TC-DC Switch Figure 1-23 Side panels view of a DGS-3620-28SC Switch Figure 1-24 Side panels view of a DGS-3620-28SC-DC Switch 16
Hardware Installation Guide
Page 23
The LED indicator will glow to the main AC power source. Only the DGS-3620-28TC, DGS-3620-28SC & the DGS-3620-52T use the DPS700. 23 CAUTION: The DGS-3620-28TC-DC/28SC-DC doesn't support any changes on the switch and the other end into the port on the ...Switch using a 14-pin DC power cable. Do not make any redundant power system. xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide Connecting to a Redundant Power Supply The DGS 3620 Series switch connects to the AC power source. A standard, threepronged AC power cable ...
The LED indicator will glow to the main AC power source. Only the DGS-3620-28TC, DGS-3620-28SC & the DGS-3620-52T use the DPS700. 23 CAUTION: The DGS-3620-28TC-DC/28SC-DC doesn't support any changes on the switch and the other end into the port on the ...Switch using a 14-pin DC power cable. Do not make any redundant power system. xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide Connecting to a Redundant Power Supply The DGS 3620 Series switch connects to the AC power source. A standard, threepronged AC power cable ...
Hardware Installation Guide
Page 39
... Hz DGS-3620-28TC-DC: -36 VDC ~ -72 VDC DGS-3620-28SC: 100-240 VAC, 50/60 Hz DGS-3620-28SC-DC: -36 VDC ~ -72 VDC DGS-3620-28PC: 100-240 VAC, 50/60 Hz DGS-3620-52T: 100-240 VAC, 50/60 Hz DGS-3620-52P: 100-240 VAC, 50/60 Hz One connector in back to install optional external RPS. xStack® DGS-3620 Series...
... Hz DGS-3620-28TC-DC: -36 VDC ~ -72 VDC DGS-3620-28SC: 100-240 VAC, 50/60 Hz DGS-3620-28SC-DC: -36 VDC ~ -72 VDC DGS-3620-28PC: 100-240 VAC, 50/60 Hz DGS-3620-52T: 100-240 VAC, 50/60 Hz DGS-3620-52P: 100-240 VAC, 50/60 Hz One connector in back to install optional external RPS. xStack® DGS-3620 Series...
Hardware Installation Guide
Page 40
... 40 xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide DGS-3620-28TC-DC: 51.5 Watt DGS-3620-28SC: 60.3 Watt DGS-3620-28SC-DC: 65.5 Watt DGS-3620-28PC: 478.0 Watt with 350 Watt PoE load DGS-3620-52T: 81.0 Watt DGS-3620-52P: 505.4 Watt with 350 Watt PoE load For hardware version B1, the following applies: DGS-3620-28TC: 45.1 Watt (Max.) DGS-3620-28TC-DC...
... 40 xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide DGS-3620-28TC-DC: 51.5 Watt DGS-3620-28SC: 60.3 Watt DGS-3620-28SC-DC: 65.5 Watt DGS-3620-28PC: 478.0 Watt with 350 Watt PoE load DGS-3620-52T: 81.0 Watt DGS-3620-52P: 505.4 Watt with 350 Watt PoE load For hardware version B1, the following applies: DGS-3620-28TC: 45.1 Watt (Max.) DGS-3620-28TC-DC...
Hardware Installation Guide
Page 41
...link Read/Write Failed Console on Secure connection established Console off Plugged in a virtual stack with a single IP address. DGS-3620-28TC: 128 Gbps DGS-3620-28TC-DC: 128 Gbps DGS-3620-28SC: 128 Gbps DGS-3620-28SC-DC: 128 Gbps DGS-3620-28PC: 128 Gbps DGS-3620-52T: 176 Gbps DGS-3620-52P: 176 Gbps DGS-3620-28TC: 95.24 Mpps (Mega Packets Per Second) DGS-3620-28TC...switch detects that RPS is connected RPS in using RPS off Supports 32K MAC addresses. xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide Transmission Method Packet Buffer Packet ...
...link Read/Write Failed Console on Secure connection established Console off Plugged in a virtual stack with a single IP address. DGS-3620-28TC: 128 Gbps DGS-3620-28TC-DC: 128 Gbps DGS-3620-28SC: 128 Gbps DGS-3620-28SC-DC: 128 Gbps DGS-3620-28PC: 128 Gbps DGS-3620-52T: 176 Gbps DGS-3620-52P: 176 Gbps DGS-3620-28TC: 95.24 Mpps (Mega Packets Per Second) DGS-3620-28TC...switch detects that RPS is connected RPS in using RPS off Supports 32K MAC addresses. xStack® DGS-3620 Series Layer 3 Managed Stackable Gigabit Switch Hardware Installation Guide Transmission Method Packet Buffer Packet ...