Installation Guide
Page 149
In case of the power cord to the On (|) position. Verify power supply operation by checking that support them. Note In systems with dual power supplies, connect each power supply to loosen or tighten the captive installation screws on page E-3 for ... protective grounding continuity. Step 7 Connect the other end of a power source failure, the second source will most likely still be tight to remove and install the 1000 W, 1300 W, 2500 W, 3000 W, 4000 W, and 6000 W AC-input power supplies in the Catalyst 6500 series switches that the power supply LEDs are in receptacle....
In case of the power cord to the On (|) position. Verify power supply operation by checking that support them. Note In systems with dual power supplies, connect each power supply to loosen or tighten the captive installation screws on page E-3 for ... protective grounding continuity. Step 7 Connect the other end of a power source failure, the second source will most likely still be tight to remove and install the 1000 W, 1300 W, 2500 W, 3000 W, 4000 W, and 6000 W AC-input power supplies in the Catalyst 6500 series switches that the power supply LEDs are in receptacle....
Installation Guide
Page 152
Note The AC power cord for a list of supported AC power cords. Caution In a system with one hand. Slide... seated in Figure 4-7. In case of the power cord to an AC-input power source. Place your other end of a power source failure, the second source should still be available. Refer to Appendix A for the 4000... supply, as shown in the bay. Step 8 Step 9 Turn the power switch to the On (|) position on page E-3 for troubleshooting information. 4-12 Catalyst 6500 Series Switches Installation Guide OL-5781-04 Tighten the power supply captive installation screw. (See Figure...
Note The AC power cord for a list of supported AC power cords. Caution In a system with one hand. Slide... seated in Figure 4-7. In case of the power cord to an AC-input power source. Place your other end of a power source failure, the second source should still be available. Refer to Appendix A for the 4000... supply, as shown in the bay. Step 8 Step 9 Turn the power switch to the On (|) position on page E-3 for troubleshooting information. 4-12 Catalyst 6500 Series Switches Installation Guide OL-5781-04 Tighten the power supply captive installation screw. (See Figure...
Installation Guide
Page 194
...any of the power cord to the DC circuit for a list of supported AC power cords.) Step 6 Connect the other end of the following procedures, ensure that power is removed from the PEM ... system with dual power supplies, connect each power supply to disconnect the system ground connection. 4-54 Catalyst 6500 Series Switches Installation Guide OL-5781-04 Statement 1046 Follow these steps to remove a DC-input PEM: Step 1...screws on the PEM. (See Figure 4-44.) Slide the PEM part way out of the chassis so that you are working on the backplane when the system is present on the circuit. ...
...any of the power cord to the DC circuit for a list of supported AC power cords.) Step 6 Connect the other end of the following procedures, ensure that power is removed from the PEM ... system with dual power supplies, connect each power supply to disconnect the system ground connection. 4-54 Catalyst 6500 Series Switches Installation Guide OL-5781-04 Statement 1046 Follow these steps to remove a DC-input PEM: Step 1...screws on the PEM. (See Figure 4-44.) Slide the PEM part way out of the chassis so that you are working on the backplane when the system is present on the circuit. ...
Installation Guide
Page 279
OL-5781-04 Catalyst 6500 Series Switches Installation Guide B-7 Appendix B Transceivers, Module Connectors, and Cable Specifications Figure B-4 1000BASE-T SFP Transceiver Module (GLC-T) Transceivers 87922 Figure B-5 1000BASE-X SFP Transceiver Modules (GLC-SX-MM, GLC-LH-SM, and GLC-ZX-SM) 114944 Note You can use any combination of the cable and that your Cisco device supports. The only restrictions are that each SFP port must match the wavelength specifications on the other end of SFP modules that the cable must not exceed the stipulated cable length for reliable communications.
OL-5781-04 Catalyst 6500 Series Switches Installation Guide B-7 Appendix B Transceivers, Module Connectors, and Cable Specifications Figure B-4 1000BASE-T SFP Transceiver Module (GLC-T) Transceivers 87922 Figure B-5 1000BASE-X SFP Transceiver Modules (GLC-SX-MM, GLC-LH-SM, and GLC-ZX-SM) 114944 Note You can use any combination of the cable and that your Cisco device supports. The only restrictions are that each SFP port must match the wavelength specifications on the other end of SFP modules that the cable must not exceed the stipulated cable length for reliable communications.
Installation Guide
Page 302
...Module Connectors, and Cable Specifications Patch Cord Installation Warning Invisible laser radiation may be reliably supported. DMD can degrade the modal bandwidth of modes. (See Figure B-21.) B-30 Catalyst 6500 Series Switches Installation Guide OL-5781-04 The Gigabit Ethernet specification (IEEE 802.3z) outlines parameters for...Ethernet experiences this problem because of the patch cord labeled "To Equipment" into the GBIC. (See Figure B-20.) Plug the end labeled "To Cable Plant" into the fiber-optic cable in all deployed fibers; MMF cable has been tested for backbone and ...
...Module Connectors, and Cable Specifications Patch Cord Installation Warning Invisible laser radiation may be reliably supported. DMD can degrade the modal bandwidth of modes. (See Figure B-21.) B-30 Catalyst 6500 Series Switches Installation Guide OL-5781-04 The Gigabit Ethernet specification (IEEE 802.3z) outlines parameters for...Ethernet experiences this problem because of the patch cord labeled "To Equipment" into the GBIC. (See Figure B-20.) Plug the end labeled "To Cable Plant" into the fiber-optic cable in all deployed fibers; MMF cable has been tested for backbone and ...