Configuration Guide
Page 19
... Center. Ordering Documentation Registered CCO users can use tool for all technical assistance. All customers can submit technical feedback on the Internet. The Documentation CD-ROM is a powerful, easy-to Cisco. Obtaining Technical Assistance Cisco provides Cisco Connection Online (CCO) as an annual subscription. This highly integrated Internet application is updated monthly. CCO's broad range of interactive, networked services that provides immediate, open access to streamline business...
... Center. Ordering Documentation Registered CCO users can use tool for all technical assistance. All customers can submit technical feedback on the Internet. The Documentation CD-ROM is a powerful, easy-to Cisco. Obtaining Technical Assistance Cisco provides Cisco Connection Online (CCO) as an annual subscription. This highly integrated Internet application is updated monthly. CCO's broad range of interactive, networked services that provides immediate, open access to streamline business...
Configuration Guide
Page 20
... (Korean) E-mail Address tac@cisco.com chinese-tac@cisco.com japan-tac@cisco.com korea-tac@cisco.com xx Cisco 12008 Gigabit Switch Router Installation and Configuration Guide From Europe, call 408 526-8070 - To display the TAC web site that is under warranty or covered by e-mail, use www.cisco.com/techsupport. You can self-register on the status of the following terminal settings: VT100 emulation; 8 data...
... (Korean) E-mail Address tac@cisco.com chinese-tac@cisco.com japan-tac@cisco.com korea-tac@cisco.com xx Cisco 12008 Gigabit Switch Router Installation and Configuration Guide From Europe, call 408 526-8070 - To display the TAC web site that is under warranty or covered by e-mail, use www.cisco.com/techsupport. You can self-register on the status of the following terminal settings: VT100 emulation; 8 data...
Configuration Guide
Page 24
... congestion management, multicast services, and quality-of-service (QOS) features. • Carrier-class design-Supports extensive SONET/Synchrononous Digital Hierarchy (SDH) integration; The network interfaces reside on the line cards, providing connectivity between the router's switch fabric and external networks. • Scalable performance-Supports multi-gigabit bandwidth switching capacities ranging from 10 to 60 Gbps, providing high-performance support for field-replaceable units (FRUs). 1-2 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide Cisco's Next...
... congestion management, multicast services, and quality-of-service (QOS) features. • Carrier-class design-Supports extensive SONET/Synchrononous Digital Hierarchy (SDH) integration; The network interfaces reside on the line cards, providing connectivity between the router's switch fabric and external networks. • Scalable performance-Supports multi-gigabit bandwidth switching capacities ranging from 10 to 60 Gbps, providing high-performance support for field-replaceable units (FRUs). 1-2 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide Cisco's Next...
Configuration Guide
Page 48
...-second (Mbps) Ethernet port for the CSCs. The GRP performs the following functions: • Downloading the Cisco IOS software to line cards • Providing general system maintenance functions 1-26 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide However, you have a PRP, see the Performance Route Processor section. Figure 1-9 GRP Faceplate (Horizontal Orientation Shown) EJECT SSLLOOTT--01 RESET AUX CONSOLE COLL RX LINK TX RJ-45 MII GIGABIT ROUTE PROCESSOR It is...
...-second (Mbps) Ethernet port for the CSCs. The GRP performs the following functions: • Downloading the Cisco IOS software to line cards • Providing general system maintenance functions 1-26 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide However, you have a PRP, see the Performance Route Processor section. Figure 1-9 GRP Faceplate (Horizontal Orientation Shown) EJECT SSLLOOTT--01 RESET AUX CONSOLE COLL RX LINK TX RJ-45 MII GIGABIT ROUTE PROCESSOR It is...
Configuration Guide
Page 57
....3, 10/100-megabits-per-second (Mbps) Ethernet ports for packets that are as follows: • Downloading the Cisco IOS software to download a system bootstrap image, collect or load diagnostic information, and perform general, internal system maintenance operations. The switch fabric connection is available as for Telnet functionality • Running routing protocols • Building and distributing routing tables to line cards • Providing general system maintenance functions •...
....3, 10/100-megabits-per-second (Mbps) Ethernet ports for packets that are as follows: • Downloading the Cisco IOS software to download a system bootstrap image, collect or load diagnostic information, and perform general, internal system maintenance operations. The switch fabric connection is available as for Telnet functionality • Running routing protocols • Building and distributing routing tables to line cards • Providing general system maintenance functions •...
Configuration Guide
Page 67
.... Table 1-7 outlines the possible configurations of CSCs and SFCs and the router switching capacity that enables each other line card slot. Line cards installed in any combination of slots in the upper card cage can increase the number of switch planes present in the Cisco 12008"). • Serves as a switch fabric controller card for the router (see the section below entitled "Switch Fabric Controller Functions of the CSC"). • Serves as power...
.... Table 1-7 outlines the possible configurations of CSCs and SFCs and the router switching capacity that enables each other line card slot. Line cards installed in any combination of slots in the upper card cage can increase the number of switch planes present in the Cisco 12008"). • Serves as a switch fabric controller card for the router (see the section below entitled "Switch Fabric Controller Functions of the CSC"). • Serves as power...
Configuration Guide
Page 90
... the switching fabric that is one virtual output queue for each line card, plus a dedicated virtual output queue for multicast service. The scheduler issues a grant and transfers the packet across the switching fabric. • Maintenance bus (MBus) module-An MBus module on the line card responds to make forwarding decisions. 1-68 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide These tables, derived from routing tables maintained by the GRP, are used by the forwarding processor...
... the switching fabric that is one virtual output queue for each line card, plus a dedicated virtual output queue for multicast service. The scheduler issues a grant and transfers the packet across the switching fabric. • Maintenance bus (MBus) module-An MBus module on the line card responds to make forwarding decisions. 1-68 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide These tables, derived from routing tables maintained by the GRP, are used by the forwarding processor...
Configuration Guide
Page 105
... availability/proximity of power sources and network interface connections. This circuit breaker should protect against short-circuit and overcurrent faults in the fixed wiring for the Cisco 12000 Series Gigabit Switch Routers (Document Number 78-4347-02). This document accompanied the shipment of the National Electric Code, ANSI/NFPA 70. • A Cisco 12008 configured with its contents before attempting to be installed in the document entitled Regulatory Compliance...
... availability/proximity of power sources and network interface connections. This circuit breaker should protect against short-circuit and overcurrent faults in the fixed wiring for the Cisco 12000 Series Gigabit Switch Routers (Document Number 78-4347-02). This document accompanied the shipment of the National Electric Code, ANSI/NFPA 70. • A Cisco 12008 configured with its contents before attempting to be installed in the document entitled Regulatory Compliance...
Configuration Guide
Page 130
.... Installation, removal, or replacement of your particular site. 2-28 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide Intermittent failures/problems - Relevant items in the site log might include the following : - Hardware upgrades - You can use a site log to record all actions taken relevant to router operation and maintenance. Using a Site Log It is an example of a typical site log. Software upgrades - Using a Site Log If you do not receive everything you ordered, contact a Cisco customer service representative...
.... Installation, removal, or replacement of your particular site. 2-28 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide Intermittent failures/problems - Relevant items in the site log might include the following : - Hardware upgrades - You can use a site log to record all actions taken relevant to router operation and maintenance. Using a Site Log It is an example of a typical site log. Software upgrades - Using a Site Log If you do not receive everything you ordered, contact a Cisco customer service representative...
Configuration Guide
Page 149
... not use excessive speed or force when sliding the power supply into the bay. For example, for additional line card information, you can consult the appropriate configuration note(s) for installing the network interface cables in your router, as an installed component or that is shipped from the factory as outlined below: • Quad OC-3c/STM-1c Packet-Over-SONET (POS) line card-Refer to the document entitled Quad...
... not use excessive speed or force when sliding the power supply into the bay. For example, for additional line card information, you can consult the appropriate configuration note(s) for installing the network interface cables in your router, as an installed component or that is shipped from the factory as outlined below: • Quad OC-3c/STM-1c Packet-Over-SONET (POS) line card-Refer to the document entitled Quad...
Configuration Guide
Page 183
... card containing the default Cisco IOS software is in place over the power supply terminals; Step 2 Turn the rotary power switch on the power supply(ies) to the ON (|) position and observe the status of the upper card cage, and its captive installation screws are tightened. • A vertical cable-management bracket is attached to each installed line card and the bracket's captive installation screws are tightened. • All network interface cables are connected properly to line card ports...
... card containing the default Cisco IOS software is in place over the power supply terminals; Step 2 Turn the rotary power switch on the power supply(ies) to the ON (|) position and observe the status of the upper card cage, and its captive installation screws are tightened. • A vertical cable-management bracket is attached to each installed line card and the bracket's captive installation screws are tightened. • All network interface cables are connected properly to line card ports...
Configuration Guide
Page 196
... script of the setup facility to configure your router, you to issue configuration commands on a line-by-line basis at any time by a configuration script, is described in your network plan. 4-12 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide Configuring the Cisco 12008 You can perform a basic configuration for doing so is that minimizes the likelihood of errors. This facility, which enables you can still configure your router. To configure the Cisco 12008 to use whichever method suits...
... script of the setup facility to configure your router, you to issue configuration commands on a line-by-line basis at any time by a configuration script, is described in your network plan. 4-12 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide Configuring the Cisco 12008 You can perform a basic configuration for doing so is that minimizes the likelihood of errors. This facility, which enables you can still configure your router. To configure the Cisco 12008 to use whichever method suits...
Configuration Guide
Page 210
... to enter the global configuration mode: Router# config terminal Enter configuration commands, one per line. Configuration register is 0x0102 Using the Global Configuration Mode If you prefer not to use the interactive script of the setup facility, you like to establish the privileged EXEC mode: Router> enable Router# Note Configuration changes can manually configure your router using the global configuration mode. End with CNTL/Z. Router(config)# 4-26 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide The global configuration mode enables you want to...
... to enter the global configuration mode: Router# config terminal Enter configuration commands, one per line. Configuration register is 0x0102 Using the Global Configuration Mode If you prefer not to use the interactive script of the setup facility, you like to establish the privileged EXEC mode: Router> enable Router# Note Configuration changes can manually configure your router using the global configuration mode. End with CNTL/Z. Router(config)# 4-26 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide The global configuration mode enables you want to...
Configuration Guide
Page 230
... noted earlier from Flash Memory 4-46 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide Step 12 Issue the configure terminal command at the privileged EXEC mode prompt to display the enable password in a RP • Formatting a Flash Memory Card • Specifying a Cisco IOS Image for using the recovered password. End with Flash Memory Use • Enabling Booting from Step 3). Alternatively, change this section: • Installing and Removing a Flash Memory Card in the configuration file: Router# show start-up config command at the privileged EXEC...
... noted earlier from Flash Memory 4-46 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide Step 12 Issue the configure terminal command at the privileged EXEC mode prompt to display the enable password in a RP • Formatting a Flash Memory Card • Specifying a Cisco IOS Image for using the recovered password. End with Flash Memory Use • Enabling Booting from Step 3). Alternatively, change this section: • Installing and Removing a Flash Memory Card in the configuration file: Router# show start-up config command at the privileged EXEC...
Configuration Guide
Page 272
... mbus. If multiple cards are running, the line card being tested is controlled by default when an error is encountered. This is finished, a pass or fail message displays on the console, as well as on the alphanumeric LED display on operational, business-critical routers. Using the diag Command The diagnostic test command, issued at the completion of all of the tests, when terminated by the user, or by...
... mbus. If multiple cards are running, the line card being tested is controlled by default when an error is encountered. This is finished, a pass or fail message displays on the console, as well as on the alphanumeric LED display on operational, business-critical routers. Using the diag Command The diagnostic test command, issued at the completion of all of the tests, when terminated by the user, or by...
Configuration Guide
Page 282
... only part that you will need to access the components in the lower card cage slots. A vacuum cleaner is designed in dusty environments) you decide that the old filter needs replacing. Set the bezel aside temporarily. 7-2 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide The air filter assembly removes dust and particulate matter from the upper spring clips. You can install in the lower card cage. To service...
... only part that you will need to access the components in the lower card cage slots. A vacuum cleaner is designed in dusty environments) you decide that the old filter needs replacing. Set the bezel aside temporarily. 7-2 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide The air filter assembly removes dust and particulate matter from the upper spring clips. You can install in the lower card cage. To service...
Configuration Guide
Page 302
... is set to the OFF position. Ensure that you properly map the color coding scheme used to service the new power supply, use . while lifting the power supply, place your left hand; Step 2 Step 3 Step 4 Using a 1/4-inch flat-blade screwdriver, loosen the captive installation screw on the new power supply with your right hand beneath the unit to support its weight. 7-22 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide Grasp...
... is set to the OFF position. Ensure that you properly map the color coding scheme used to service the new power supply, use . while lifting the power supply, place your left hand; Step 2 Step 3 Step 4 Using a 1/4-inch flat-blade screwdriver, loosen the captive installation screw on the new power supply with your right hand beneath the unit to support its weight. 7-22 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide Grasp...
Configuration Guide
Page 304
... set this hardware aside temporarily. 7-24 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide Adding, Removing, or Replacing a DC-Input Power Supply (b) Grasp the safety shield and move it to the right and obliquely upward, positioning the shield so that it aside temporarily. ALL CONNECTIONS NEED TO BE REMOVED TO DE-ENERGIZE THE UNIT. set it can be freed from the three standoffs on the power supply faceplate. (c) Remove...
... set this hardware aside temporarily. 7-24 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide Adding, Removing, or Replacing a DC-Input Power Supply (b) Grasp the safety shield and move it to the right and obliquely upward, positioning the shield so that it aside temporarily. ALL CONNECTIONS NEED TO BE REMOVED TO DE-ENERGIZE THE UNIT. set it can be freed from the three standoffs on the power supply faceplate. (c) Remove...
Configuration Guide
Page 378
... PCMCIA slots 1-33 soft reset switch 1-32 SRAM 1-30 H horizontal cable management tray 1-9 I i (initialize) command 4-45 IEEE 802.3u specifications 3-34 IGRP, configuring 4-18 immunity approvals 1-79 information, obtaining additional 4-64 installation frame into rack 3-11 guidelines 3-2 installing auxiliary port cable 3-23, 3-29 cards in the upper card cage 3-14 Ethernet cables 3-24, 3-31 Flash memory cards 4-47 to 4-48 system ground 3-39 tools required 2-26 Index 4 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide
... PCMCIA slots 1-33 soft reset switch 1-32 SRAM 1-30 H horizontal cable management tray 1-9 I i (initialize) command 4-45 IEEE 802.3u specifications 3-34 IGRP, configuring 4-18 immunity approvals 1-79 information, obtaining additional 4-64 installation frame into rack 3-11 guidelines 3-2 installing auxiliary port cable 3-23, 3-29 cards in the upper card cage 3-14 Ethernet cables 3-24, 3-31 Flash memory cards 4-47 to 4-48 system ground 3-39 tools required 2-26 Index 4 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide
Configuration Guide
Page 380
... power supply 3-47 frame 3-11 line card interface cables 3-18 interfaces, configuring 4-20 to 4-24 recovering from a lost password 4-43 removing air filter 7-2 DC-input power supply 3-9, 3-16 RP 7-52 upper card cage cards 3-7 replacing air filter 7-3 RP 7-55 upper card cage cards 3-14 system configuration, basic 4-13 to 4-30 startup 4-4 to 4-11 using configuration mode 4-26 to 4-27 processor CPU on the GRP 1-27 CPU on the PRP 1-35 line card 5-12 Index 6 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide
... power supply 3-47 frame 3-11 line card interface cables 3-18 interfaces, configuring 4-20 to 4-24 recovering from a lost password 4-43 removing air filter 7-2 DC-input power supply 3-9, 3-16 RP 7-52 upper card cage cards 3-7 replacing air filter 7-3 RP 7-55 upper card cage cards 3-14 system configuration, basic 4-13 to 4-30 startup 4-4 to 4-11 using configuration mode 4-26 to 4-27 processor CPU on the GRP 1-27 CPU on the PRP 1-35 line card 5-12 Index 6 Cisco 12008 Gigabit Switch Router Installation and Configuration Guide