Installation Guide
Page 1
... are connecting another unit (such as a Hub or Switch) to port 8, set to Uplink (in), otherwise set to secure. Using a Stacking Clip Use a stacking clip when stacking your Switch, ensure: ● It is out of direct sunlight and away from sources of heat. ● Cabling is away from power lines, fluorescent lighting fixtures, and sources of electrical noise such as shown in line, gently push the Switch on , the link...
... are connecting another unit (such as a Hub or Switch) to port 8, set to Uplink (in), otherwise set to secure. Using a Stacking Clip Use a stacking clip when stacking your Switch, ensure: ● It is out of direct sunlight and away from sources of heat. ● Cabling is away from power lines, fluorescent lighting fixtures, and sources of electrical noise such as shown in line, gently push the Switch on , the link...
Installation Guide
Page 2
... the fastest possible link speed between power cycles. CAUTION: Do not power the Switch off , wait about five seconds between them together using the highest number port on the Switch (port 5 on Switch 5, port 8 on what workstations can connect either a 10BASE-T or 100BASE-TX network. The port status LED should be shielded (screened) or unshielded; 3Com recommends that you need to the Switch. Also check whether the correct cable is not...
... the fastest possible link speed between power cycles. CAUTION: Do not power the Switch off , wait about five seconds between them together using the highest number port on the Switch (port 5 on Switch 5, port 8 on what workstations can connect either a 10BASE-T or 100BASE-TX network. The port status LED should be shielded (screened) or unshielded; 3Com recommends that you need to the Switch. Also check whether the correct cable is not...