"Manufacturer's Certification for Credit" Manual
Page 1
... ELMHURST, IL 60126 Identi cation of Property Solar Electric Property Make and Model Number(s) of Property Qualifying for Credit LiftMaster LA412 Solar Gate Operator System (Single Gate Model LA412-1PKG) LiftMaster LA412 Solar Gate Operator System (Dual Gate Model LA412-2PKG) LiftMaster SW425DCSP3 Solar Gate Operator System LiftMaster RSL12V Residential DC Slide Gate Operator System ( Single gate model RSL12V...
... ELMHURST, IL 60126 Identi cation of Property Solar Electric Property Make and Model Number(s) of Property Qualifying for Credit LiftMaster LA412 Solar Gate Operator System (Single Gate Model LA412-1PKG) LiftMaster LA412 Solar Gate Operator System (Dual Gate Model LA412-2PKG) LiftMaster SW425DCSP3 Solar Gate Operator System LiftMaster RSL12V Residential DC Slide Gate Operator System ( Single gate model RSL12V...
Refer to the solar cycle chart for more details. Manual
Page 1
...30 Accessories Solenoid Lock(SGLOCK12V) 50 50 27 Loop(LD7LP) 50 50 28 Exit Loop(LM202) 50 50 28 LMGSCCT The LA412 is for a single or dual gate, daily cycle rate, number of accessories and region of sunlight during the winter months. Power is due to the ... 32°F. Snow, heavy fog or heavy rain affect solar panel performance and charge rate. This is provided to the operator control board. LA412 not supported/available in climates where temperatures reach below 32°F (and above -4°F) for operating a gate while minimizing power consumption at...
...30 Accessories Solenoid Lock(SGLOCK12V) 50 50 27 Loop(LD7LP) 50 50 28 Exit Loop(LM202) 50 50 28 LMGSCCT The LA412 is for a single or dual gate, daily cycle rate, number of accessories and region of sunlight during the winter months. Power is due to the ... 32°F. Snow, heavy fog or heavy rain affect solar panel performance and charge rate. This is provided to the operator control board. LA412 not supported/available in climates where temperatures reach below 32°F (and above -4°F) for operating a gate while minimizing power consumption at...
LA412 Manual
Page 10
... where the risk of nuisance tripping, such as when a vehicle, trips the sensor while the gate is still moving. 9 INSTALLATION » OVERVIEW OF TYPICAL INSTALLATION DUAL GATE Solar Panel (Facing South) Antenna Warning Sign Hinge Post Bracket Gate Bracket Gate 1 Control Box with Batteries Operator Cable Gate 2 Junction Box Extension Cable...
... where the risk of nuisance tripping, such as when a vehicle, trips the sensor while the gate is still moving. 9 INSTALLATION » OVERVIEW OF TYPICAL INSTALLATION DUAL GATE Solar Panel (Facing South) Antenna Warning Sign Hinge Post Bracket Gate Bracket Gate 1 Control Box with Batteries Operator Cable Gate 2 Junction Box Extension Cable...
LA412 Manual
Page 22
... used on the outside of the gate. NOTE: The gate with the lock attached to open first and close second. The following illustration shows a dual gate configuration with a decorative overlapping piece on a gate, the gate with the longer travel span (opening) must be set to the Gate 1 ... LOCK/ BIPART DELAY C7Ø C71 OUTSIDE PROPERTY Primary Gate - WIRING » SET THE LOCK/BIPART DELAY (MODEL LA412-S ONLY) SET THE LOCK/BIPART DELAY (MODEL LA412-S ONLY) Occasionally in dual gate installations, one gate or if using a solenoid lock, for the control box, then mount the control box on ...
... used on the outside of the gate. NOTE: The gate with the lock attached to open first and close second. The following illustration shows a dual gate configuration with a decorative overlapping piece on a gate, the gate with the longer travel span (opening) must be set to the Gate 1 ... LOCK/ BIPART DELAY C7Ø C71 OUTSIDE PROPERTY Primary Gate - WIRING » SET THE LOCK/BIPART DELAY (MODEL LA412-S ONLY) SET THE LOCK/BIPART DELAY (MODEL LA412-S ONLY) Occasionally in dual gate installations, one gate or if using a solenoid lock, for the control box, then mount the control box on ...
LA412 Manual
Page 26
... 50 Zone 3 12 10 10 10 28 25 26 26 46 40 44 44 10W SOLAR 20W SOLAR 30W SOLAR NUMBER OF CYCLES PER DAY Dual Arm Installations 1 PANEL Arms Only 2 PANEL Solenoid Lock Loop LM202 Arms Only 3 PANEL Solenoid Lock Loop LM202 Arms Only Solenoid Lock Loop LM202 Zone...an open area clear of obstructions and shading for installed accessories that reach below -4° F. Ratings vary based on gate construction and installation. The LA412 Solar Gate Operator is based upon the average solar radiation and the temperature effects on a regular basis for best performance to cold weather and a ...
... 50 Zone 3 12 10 10 10 28 25 26 26 46 40 44 44 10W SOLAR 20W SOLAR 30W SOLAR NUMBER OF CYCLES PER DAY Dual Arm Installations 1 PANEL Arms Only 2 PANEL Solenoid Lock Loop LM202 Arms Only 3 PANEL Solenoid Lock Loop LM202 Arms Only Solenoid Lock Loop LM202 Zone...an open area clear of obstructions and shading for installed accessories that reach below -4° F. Ratings vary based on gate construction and installation. The LA412 Solar Gate Operator is based upon the average solar radiation and the temperature effects on a regular basis for best performance to cold weather and a ...
LA412 Manual
Page 31
... blinking, programming is now complete. (If the SET OPEN LIMIT LED continues to open and close the left operator. Control board SET GATE 2 will blink). DUAL GATE (LEFT-SIDE PRIMARY OPERATOR) 1 Close the gate. 2 Engage the operator by pressing the RESET button. PROGRAM OPEN 3 Press the LEARN LIMITS button (SET OPEN...
... blinking, programming is now complete. (If the SET OPEN LIMIT LED continues to open and close the left operator. Control board SET GATE 2 will blink). DUAL GATE (LEFT-SIDE PRIMARY OPERATOR) 1 Close the gate. 2 Engage the operator by pressing the RESET button. PROGRAM OPEN 3 Press the LEARN LIMITS button (SET OPEN...
LA412 Manual
Page 32
.... 31 DIAGNOSTIC GATE 1 9 Press the LEARN LIMITS button. Programming times-out automatically after 60 seconds of inactivity. GATE 2 may need to open the right operator. DUAL GATE (RIGHT-SIDE PRIMARY OPERATOR) 1 Close the gate. 2 Engage the operator by pressing the RESET button. Control OPEN LIMIT CLOSE LIMIT FORCE board will blink...
.... 31 DIAGNOSTIC GATE 1 9 Press the LEARN LIMITS button. Programming times-out automatically after 60 seconds of inactivity. GATE 2 may need to open the right operator. DUAL GATE (RIGHT-SIDE PRIMARY OPERATOR) 1 Close the gate. 2 Engage the operator by pressing the RESET button. Control OPEN LIMIT CLOSE LIMIT FORCE board will blink...