Gateway Desktop User's Guide
Page 61
... discs, you must create the set of recovery discs as soon as possible. 51 Gateway Recovery Management opens. 2 To create recovery discs for only the factory-loaded software and drivers, click Create driver and application backup disc. Gateway provides everything you create each type...steps first" on page 51. www.gateway.com Recovering your system under most computer problems by other methods, you should create a set of recovery discs beforehand. Recovery discs take some or all factory-loaded software and drivers, click Create factory default disc. - Creating recovery discs ...
... discs, you must create the set of recovery discs as soon as possible. 51 Gateway Recovery Management opens. 2 To create recovery discs for only the factory-loaded software and drivers, click Create driver and application backup disc. Gateway provides everything you create each type...steps first" on page 51. www.gateway.com Recovering your system under most computer problems by other methods, you should create a set of recovery discs beforehand. Recovery discs take some or all factory-loaded software and drivers, click Create factory default disc. - Creating recovery discs ...
User Guide
Page 13
... For more information, see "Installing a printer, scanner, or other peripheral device" on page 56. www.gateway.com 5 The switch is supplied at a nominal 115 volts at 60 Hz. In the United States, the... utility power is preset at 50 Hz. The power supply should always be set to 230. Plug a serial device (such as Europe, the utility power is operating in such... about the Internet" on page 24. If your computer is supplied at 230 volts at the factory with the correct voltage for your computer is in the United States. Plug a Personal System/2®...
... For more information, see "Installing a printer, scanner, or other peripheral device" on page 56. www.gateway.com 5 The switch is supplied at a nominal 115 volts at 60 Hz. In the United States, the... utility power is preset at 50 Hz. The power supply should always be set to 230. Plug a serial device (such as Europe, the utility power is operating in such... about the Internet" on page 24. If your computer is supplied at 230 volts at the factory with the correct voltage for your computer is in the United States. Plug a Personal System/2®...
User Guide
Page 246
... hardware configuration, system resource settings, and password security. Before changing any settings, write them down in case you need to these settings will affect the performance of the BIOS Setup utility opens. 238 www.gateway.com Changes to restore them later. To open BIOS Setup utility: 1 Restart your computer. These settings are stored and saved... For more information about sound troubleshooting, click Start, then click Help and Support. Type the keyword sound troubleshooter in the BIOS Setup utility have been set at the factory for your computer.
... hardware configuration, system resource settings, and password security. Before changing any settings, write them down in case you need to these settings will affect the performance of the BIOS Setup utility opens. 238 www.gateway.com Changes to restore them later. To open BIOS Setup utility: 1 Restart your computer. These settings are stored and saved... For more information about sound troubleshooting, click Start, then click Help and Support. Type the keyword sound troubleshooter in the BIOS Setup utility have been set at the factory for your computer.
User Guide
Page 254
...fit only into an outlet, contact an electrician to install the appropriate outlet. ■ If you set at least 6 inches (15 cm), around the system for ventilation when you use Gateway products in areas classified as hazardous locations. Dispose of batteries according to the manufacturer's instructions. ■...;The system does not operate properly when the operating instructions are provided for your area. Make sure you provide adequate space, at the factory to the correct voltage. ■ Openings in the computer case are followed. ■The system was dropped or the cabinet is to...
...fit only into an outlet, contact an electrician to install the appropriate outlet. ■ If you set at least 6 inches (15 cm), around the system for ventilation when you use Gateway products in areas classified as hazardous locations. Dispose of batteries according to the manufacturer's instructions. ■...;The system does not operate properly when the operating instructions are provided for your area. Make sure you provide adequate space, at the factory to the correct voltage. ■ Openings in the computer case are followed. ■The system was dropped or the cabinet is to...