Hardware Installation Guide
Page 267
... Formerly called Bellcore. Terminal Access See TACACS+. OL-18259-09 Cisco uBR10012 Universal Broadband Router Hardware Installation Guide GL-13 User passwords are four TACs worldwide. TELNET Standard terminal emulation protocol in RFC 854. Controller Access Control System...congest a network. Timing, Communication, and Control Plus The Timing, Communication, and Control Plus (TCC+) card in the Cisco uBR10012 chassis monitors the cable interface line cards and power supply usage, controls the LCD display on preassigned time slots. Traffic management A technique for ...
... Formerly called Bellcore. Terminal Access See TACACS+. OL-18259-09 Cisco uBR10012 Universal Broadband Router Hardware Installation Guide GL-13 User passwords are four TACs worldwide. TELNET Standard terminal emulation protocol in RFC 854. Controller Access Control System...congest a network. Timing, Communication, and Control Plus The Timing, Communication, and Control Plus (TCC+) card in the Cisco uBR10012 chassis monitors the cable interface line cards and power supply usage, controls the LCD display on preassigned time slots. Traffic management A technique for ...
Hardware Installation Guide
Page 273
... supported modules 1-7 system shutdown 5-2 TCC+ card 1-29 troubleshooting 4-2, 4-4 upstream data path 1-4 Cisco uBR10-LCP2-MC28C cable interface line card blank slot covers 5-44 installing and replacing 5-41 Cisco uBR10-SRP-OC12SML DPT WAN line card 1-33 CLI, setup facility 3-61 clock ...Telnet password 3-63 connecting 100BASE-T to an ethernet port (figure) 3-55 10BASE-T to an ethernet port (figure) 3-54 alarm indicators 3-36, 5-7 cable to the GBIC port (figure) 3-58 connectors alarm indicators (figure) 3-38 DB-9 3-51 Ethernet LAN 3-54 gigabit Ethernet line card 3-57 OL-18259-09 Cisco uBR10012...
... supported modules 1-7 system shutdown 5-2 TCC+ card 1-29 troubleshooting 4-2, 4-4 upstream data path 1-4 Cisco uBR10-LCP2-MC28C cable interface line card blank slot covers 5-44 installing and replacing 5-41 Cisco uBR10-SRP-OC12SML DPT WAN line card 1-33 CLI, setup facility 3-61 clock ...Telnet password 3-63 connecting 100BASE-T to an ethernet port (figure) 3-55 10BASE-T to an ethernet port (figure) 3-54 alarm indicators 3-36, 5-7 cable to the GBIC port (figure) 3-58 connectors alarm indicators (figure) 3-38 DB-9 3-51 Ethernet LAN 3-54 gigabit Ethernet line card 3-57 OL-18259-09 Cisco uBR10012...
Hardware Installation Guide
Page 277
... required for replacing 5-2 mounting brackets, attaching 3-9 mounting brackets for the Cisco uBR10012 router (figure) 3-9 N NCTA cable television channels and relative frequencies (table) C-3 NEBS Level 3 support 1-7 nonoperating specifications 2-7 no shutdown command 3-64 NTSC frequency allocation C-3 standards, description C-1 NTSC (M) frequency allocations C-8, C-10 O OC-12 POS line card 1-31 faceplate (figure) 1-32 LEDs (table) 1-32 SC connector 1-31...
... required for replacing 5-2 mounting brackets, attaching 3-9 mounting brackets for the Cisco uBR10012 router (figure) 3-9 N NCTA cable television channels and relative frequencies (table) C-3 NEBS Level 3 support 1-7 nonoperating specifications 2-7 no shutdown command 3-64 NTSC frequency allocation C-3 standards, description C-1 NTSC (M) frequency allocations C-8, C-10 O OC-12 POS line card 1-31 faceplate (figure) 1-32 LEDs (table) 1-32 SC connector 1-31...
Hardware Installation Guide
Page 279
... installing 3-43 removing 3-4, 3-7 software Cisco uBR10012 router 1-7 configuration setup 3-63 LCD display panel 1-18 system configuration dialog 3-63 specifications airflow A-1 altitude A-1 DC PEM A-2 GBIC 1-31 gigabit Ethernet line card A-8 humidity A-1 operating conditions 2-8 PRE module A-7 specifications for operating and nonoperating environments (table) 2-7 spectrum analyzer manufacturers D-2, D-4 splitter manufacturers D-1, D-3 startup troubleshooting 4-6 straight-through cables B-5, B-6 stripping insulation (figure) 3-37...
... installing 3-43 removing 3-4, 3-7 software Cisco uBR10012 router 1-7 configuration setup 3-63 LCD display panel 1-18 system configuration dialog 3-63 specifications airflow A-1 altitude A-1 DC PEM A-2 GBIC 1-31 gigabit Ethernet line card A-8 humidity A-1 operating conditions 2-8 PRE module A-7 specifications for operating and nonoperating environments (table) 2-7 spectrum analyzer manufacturers D-2, D-4 splitter manufacturers D-1, D-3 startup troubleshooting 4-6 straight-through cables B-5, B-6 stripping insulation (figure) 3-37...