English Manual
Page 21
... two M10 Washers (88), two 12.7mm Spacers (73), and an M10 Locknut (74). Route the High Cable (44) upward through the Top Frame (6), over a Pulley (69), and downward through the slot in the side of the ...V-pulley. Make sure to hold the High Cable in this step. 35 Slide the Top Cover (not shown) as far forward as possible. Note: Another Pulley (not shown) .... 27 Slot 74 71 67 93 44 5 35. Note: For clarity, the Top Cover (27) is oriented to leave slack in the High Cable in step 61. 69 74 88 73 44 6 73 88 75 Slack 21 Attach...
... two M10 Washers (88), two 12.7mm Spacers (73), and an M10 Locknut (74). Route the High Cable (44) upward through the Top Frame (6), over a Pulley (69), and downward through the slot in the side of the ...V-pulley. Make sure to hold the High Cable in this step. 35 Slide the Top Cover (not shown) as far forward as possible. Note: Another Pulley (not shown) .... 27 Slot 74 71 67 93 44 5 35. Note: For clarity, the Top Cover (27) is oriented to leave slack in the High Cable in step 61. 69 74 88 73 44 6 73 88 75 Slack 21 Attach...