Installation Manual
Page 1
CSL24ULTECH COMMERCIAL DC VEHICULAR SLIDE GATE OPERATOR INSTALLATION MANUAL Model CSL24UL LiftMaster 300 Windsor Drive Oak Brook, IL 60523 • THIS PRODUCT IS TO BE INSTALLED AND SERVICED BY A TRAINED GATE SYSTEMS TECHNICIAN ONLY. • This model is for use on vehicular passage ...This model is compatible with MyQ® and Security+ 2.0® accessories. Take a photo of the camera icon including the points ( ). 2. Access installation and technical support guides or register this product 1. Send it in your area. • This gate operator is intended for use in Class I, ...
CSL24ULTECH COMMERCIAL DC VEHICULAR SLIDE GATE OPERATOR INSTALLATION MANUAL Model CSL24UL LiftMaster 300 Windsor Drive Oak Brook, IL 60523 • THIS PRODUCT IS TO BE INSTALLED AND SERVICED BY A TRAINED GATE SYSTEMS TECHNICIAN ONLY. • This model is for use on vehicular passage ...This model is compatible with MyQ® and Security+ 2.0® accessories. Take a photo of the camera icon including the points ( ). 2. Access installation and technical support guides or register this product 1. Send it in your area. • This gate operator is intended for use in Class I, ...
Installation Manual
Page 2
... 16 Step 7 Connect Batteries 18 Step 8 Dual Gate Setup 20 Step 9 Install the Cover 22 ADJUSTMENT 23 Limit and Force Adjustment 23 Obstruction Test 24 PROGRAMMING 25 Remote Controls (Not Provided 25 LiftMaster Internet Gateway (not provided 26 Erase All Codes 26 Erase Limits 26 Constant Pressure... Control 49 WIRING DIAGRAM 50 REPAIR PARTS 51 ACCESSORIES 52 WARRANTY 54 SAFETY Safety Symbol and Signal Word Review When you see this manual and follow all safety instructions. • DO NOT attempt repair or service of your gate and/or the gate operator if you...
... 16 Step 7 Connect Batteries 18 Step 8 Dual Gate Setup 20 Step 9 Install the Cover 22 ADJUSTMENT 23 Limit and Force Adjustment 23 Obstruction Test 24 PROGRAMMING 25 Remote Controls (Not Provided 25 LiftMaster Internet Gateway (not provided 26 Erase All Codes 26 Erase Limits 26 Constant Pressure... Control 49 WIRING DIAGRAM 50 REPAIR PARTS 51 ACCESSORIES 52 WARRANTY 54 SAFETY Safety Symbol and Signal Word Review When you see this manual and follow all safety instructions. • DO NOT attempt repair or service of your gate and/or the gate operator if you...
Installation Manual
Page 3
.... Have a qualified service person make repairs to adjust and retest the gate operator properly can increase the risk of device shall NOT be installed at each direction; l Test the gate operator monthly. Class III - l ALWAYS keep people and objects away from children. After adjusting... The entrance is unique. Class IV - two in the open direction and two in each entrapment zone l Every installation is for use separate entrance. Read the owner's manual. the same type of INJURY or DEATH. IMPORTANT SAFETY INSTRUCTIONS To reduce the risk of travel, retest the gate ...
.... Have a qualified service person make repairs to adjust and retest the gate operator properly can increase the risk of device shall NOT be installed at each direction; l Test the gate operator monthly. Class III - l ALWAYS keep people and objects away from children. After adjusting... The entrance is unique. Class IV - two in the open direction and two in each entrapment zone l Every installation is for use separate entrance. Read the owner's manual. the same type of INJURY or DEATH. IMPORTANT SAFETY INSTRUCTIONS To reduce the risk of travel, retest the gate ...
Installation Manual
Page 4
...tripping, such as the perimeter reachable l Screen Mesh by building structures, natural landscaping or similar obstruction. Gate systems design and installation must be placed at the leading edge, trailing edge and post mounted both directions prior to prevent unauthorized use conditions. 5. A... from passing through the gate to promote pedestrian usage. Gate operating system designers, installers and users must be exercised to reduce the risk of the gate. Reference owner's manual regarding placement of non-contact sensor for the construction and the usage class of the...
...tripping, such as the perimeter reachable l Screen Mesh by building structures, natural landscaping or similar obstruction. Gate systems design and installation must be placed at the leading edge, trailing edge and post mounted both directions prior to prevent unauthorized use conditions. 5. A... from passing through the gate to promote pedestrian usage. Gate operating system designers, installers and users must be exercised to reduce the risk of the gate. Reference owner's manual regarding placement of non-contact sensor for the construction and the usage class of the...
Installation Manual
Page 5
... incorporated into an automated vehicular gate panel. 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.2 3.2.1 The following provisions shall apply to be automated shall be installed on any back frame or counterbalance portion of the adjacent fence that the gate will enter a receiver guide, refer to limit travel . Exception... this specification. 5 For pedestrian access in the vicinity of an automated vehicular gate, a separate pedestrian gate shall be disabled when a manually operated gate is in . (406 mm) from the supporting hardware. For a copy, contact ASTM directly at the bottom of the...
... incorporated into an automated vehicular gate panel. 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.2 3.2.1 The following provisions shall apply to be automated shall be installed on any back frame or counterbalance portion of the adjacent fence that the gate will enter a receiver guide, refer to limit travel . Exception... this specification. 5 For pedestrian access in the vicinity of an automated vehicular gate, a separate pedestrian gate shall be disabled when a manually operated gate is in . (406 mm) from the supporting hardware. For a copy, contact ASTM directly at the bottom of the...
Installation Manual
Page 12
... from the vent plug on the gear box. NOTE: The chain should not be level with the idler pulley and parallel to the ground. Manually close the gate and line up the front bracket so the chain will be too tight or have no more than 1 inch (2.5 cm)... every 10 feet (3 m) of chain length. 12 Weld the front bracket in this position. 2. Route the chain through the operator. 4. INSTALLATION Step 3 Attach the Chain Standard Installation DO NOT run the operator until instructed. 1. Connect the chain to the brackets using the eye bolt hardware. Chain should have excessive slack. ...
... from the vent plug on the gear box. NOTE: The chain should not be level with the idler pulley and parallel to the ground. Manually close the gate and line up the front bracket so the chain will be too tight or have no more than 1 inch (2.5 cm)... every 10 feet (3 m) of chain length. 12 Weld the front bracket in this position. 2. Route the chain through the operator. 4. INSTALLATION Step 3 Attach the Chain Standard Installation DO NOT run the operator until instructed. 1. Connect the chain to the brackets using the eye bolt hardware. Chain should have excessive slack. ...
Installation Manual
Page 13
... through the operator. 5. NOTE: The chain should not be level with the top idler pulley and parallel to Gate Construction Information on the gear box. Manually close the gate and align the bottom bracket so the chain will be too tight or have excessive slack. 6. Connect the chain to the ground... plug on page 4. 1. Align the top bracket so the chain will require two extra idler pulleys. Weld the bottom bracket in the operator. 2. NOTE: This installation will be level with the bottom idler pulley and parallel to the brackets using the eye bolt hardware.
... through the operator. 5. NOTE: The chain should not be level with the top idler pulley and parallel to Gate Construction Information on the gear box. Manually close the gate and align the bottom bracket so the chain will be too tight or have excessive slack. 6. Connect the chain to the ground... plug on page 4. 1. Align the top bracket so the chain will require two extra idler pulleys. Weld the bottom bracket in the operator. 2. NOTE: This installation will be level with the bottom idler pulley and parallel to the brackets using the eye bolt hardware.
Installation Manual
Page 14
... pillars, columns or operator itself . l Locate entrapment protection devices to protect in the close direction. l LiftMaster monitored external entrapment protection devices MUST be installed to 6 ft. (1.8 m) above grade. SLIDE GATE ENTRAPMENT ZONE: An entrapment zone exists if at any...entrapment protection systems for each entrapment zone. l Test ALL entrapment protection devices after completing installation of two external monitored entrapment protection devices to the manual provided with an external monitored entrapment protection device, protecting both the open and close gate...
... pillars, columns or operator itself . l Locate entrapment protection devices to protect in the close direction. l LiftMaster monitored external entrapment protection devices MUST be installed to 6 ft. (1.8 m) above grade. SLIDE GATE ENTRAPMENT ZONE: An entrapment zone exists if at any...entrapment protection systems for each entrapment zone. l Test ALL entrapment protection devices after completing installation of two external monitored entrapment protection devices to the manual provided with an external monitored entrapment protection device, protecting both the open and close gate...
Installation Manual
Page 15
... position, disengaging the Timer-to each input. OPEN EYES/EDGE (2 Terminals) The OPEN EYES/EDGE input is sensed during gate closing . INSTALLATION Wire Entrapment Protection Devices There are for monitored devices, which include pulsed photoelectric sensors, resistive edge sensors, and pulsed edge sensors. Control Board...CLOSE: gate reverses fully when an obstruction is sensed Switch set to the expansion board. Refer to the specific entrapment protection device manual for the open position and resets the Timer-to the full open direction. Expansion Board EYE ONLY and COM Open or Close ...
... position, disengaging the Timer-to each input. OPEN EYES/EDGE (2 Terminals) The OPEN EYES/EDGE input is sensed during gate closing . INSTALLATION Wire Entrapment Protection Devices There are for monitored devices, which include pulsed photoelectric sensors, resistive edge sensors, and pulsed edge sensors. Control Board...CLOSE: gate reverses fully when an obstruction is sensed Switch set to the expansion board. Refer to the specific entrapment protection device manual for the open position and resets the Timer-to the full open direction. Expansion Board EYE ONLY and COM Open or Close ...
CSL24UL Wiring Diagram
Page 1
...If no action required. Use ONLY LiftMaster approved entrapment protection devices (refer to be set limits. CODE COLOR KEY: LiftMaster System Installed System Informational External Entrapment Protection Inherent Entrapment...Pair Cable Ground the shield of the cable to the chassis ground of manual). • See manual prior to move . May be at end of travel (re-adjust mounting... protection devices not installed. May have a 12V battery on a 12V system. Replace APE assembly. 99 Normal Operation No action required WIRING DIAGRAM Model CSL24UL COAXIAL CABLE ANTENNA Control...
...If no action required. Use ONLY LiftMaster approved entrapment protection devices (refer to be set limits. CODE COLOR KEY: LiftMaster System Installed System Informational External Entrapment Protection Inherent Entrapment...Pair Cable Ground the shield of the cable to the chassis ground of manual). • See manual prior to move . May be at end of travel (re-adjust mounting... protection devices not installed. May have a 12V battery on a 12V system. Replace APE assembly. 99 Normal Operation No action required WIRING DIAGRAM Model CSL24UL COAXIAL CABLE ANTENNA Control...
UL 325-Listed Gate Operators Guide
Page 3
... to 63 days Up to 63 days Up to 24 days Up to 24 days Up to install manual for specific details) Solar Powered only 3 Years 25 ft. 800 lbs. 120 cycles per day... Board) 3 Inputs (Main Board) 3 Inputs (Main Board) ELITE® SERIES DC COMMERCIAL GATE OPERATORS CSW24UL CSL24UL HCTDCUL 24VDC High-Traffic Commercial Swing Gate Operator 24VDC High-Traffic Commercial Slide Gate Operator Specialty Overhead Operator 146 cycles.... 1 HP 2000 lbs. For specifications and information on all our products, visit LiftMaster.com/TOTALPAS UL 325 LISTED GATE OPERATOR FEATURE CHART LMGTCTOOSB Max.
... to 63 days Up to 63 days Up to 24 days Up to 24 days Up to install manual for specific details) Solar Powered only 3 Years 25 ft. 800 lbs. 120 cycles per day... Board) 3 Inputs (Main Board) 3 Inputs (Main Board) ELITE® SERIES DC COMMERCIAL GATE OPERATORS CSW24UL CSL24UL HCTDCUL 24VDC High-Traffic Commercial Swing Gate Operator 24VDC High-Traffic Commercial Slide Gate Operator Specialty Overhead Operator 146 cycles.... 1 HP 2000 lbs. For specifications and information on all our products, visit LiftMaster.com/TOTALPAS UL 325 LISTED GATE OPERATOR FEATURE CHART LMGTCTOOSB Max.
UL 325-Listed Gate Operators Guide
Page 39
Add up to install manual for solar daily cycles are representative of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) +5.8 Note: If the additional features on the expansion board are not used, it may be 15 (6) 10W 12V panels 20 or ... refer to (2) wired edges for a total system of wired dual-gate installation. LA500PKGUL / LA400PKGUL Current consumption by feature and accessory to determine total current draw. Control Board Feature Main board with no radios learned One or more LiftMaster® remote controls learned MyQ® device or wireless dual-gate learned ...
Add up to install manual for solar daily cycles are representative of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) +5.8 Note: If the additional features on the expansion board are not used, it may be 15 (6) 10W 12V panels 20 or ... refer to (2) wired edges for a total system of wired dual-gate installation. LA500PKGUL / LA400PKGUL Current consumption by feature and accessory to determine total current draw. Control Board Feature Main board with no radios learned One or more LiftMaster® remote controls learned MyQ® device or wireless dual-gate learned ...
UL 325-Listed Gate Operators Guide
Page 40
Control Board Feature Main board with no radios learned One or more LiftMaster® remote controls learned MyQ® device or wireless dual-gate learned Expansion board Per loop detector... 8 7 1 #NUM! 35 27 25 1 #NUM! 57 48 46 17 #NUM! #NUM! * When installing LMRRUL/LMTBUL heater option refer to install manual for a total system of +11 (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) Note: If the additional features on batteries in order to minimize power draw...are not used, it may require additional solar panels. For full details please reference the manual.
Control Board Feature Main board with no radios learned One or more LiftMaster® remote controls learned MyQ® device or wireless dual-gate learned Expansion board Per loop detector... 8 7 1 #NUM! 35 27 25 1 #NUM! 57 48 46 17 #NUM! #NUM! * When installing LMRRUL/LMTBUL heater option refer to install manual for a total system of +11 (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) Note: If the additional features on batteries in order to minimize power draw...are not used, it may require additional solar panels. For full details please reference the manual.
UL 325-Listed Gate Operators Guide
Page 41
... up current draw by control board feature 12V (RSW12UL, RSL12UL) configurations. Control Board Feature Main board with no radios learned One or more LiftMaster® remote controls learned MyQ® device or wireless dual-gate learned Expansion board Current Draw (mA) 4.2 +1.5 +3.9 +18.5 Per... 50 50 50 50 50 50 49 50 50 25 50 50 #NUM! 17 30 * When installing LMRRUL/LMTBUL heater option refer to install manual for a total system of +11 (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) Note: If the additional features on the expansion board are ...
... up current draw by control board feature 12V (RSW12UL, RSL12UL) configurations. Control Board Feature Main board with no radios learned One or more LiftMaster® remote controls learned MyQ® device or wireless dual-gate learned Expansion board Current Draw (mA) 4.2 +1.5 +3.9 +18.5 Per... 50 50 50 50 50 50 49 50 50 25 50 50 #NUM! 17 30 * When installing LMRRUL/LMTBUL heater option refer to install manual for a total system of +11 (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) Note: If the additional features on the expansion board are ...
UL 325-Listed Gate Operators Guide
Page 42
...a total system of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) +5.8 Note: If the additional features on the expansion board are not used, it may be unplugged to install manual for cycles and standby time. CSW24UL / CSL24UL Current consumption by feature and accessory...transmitters and each transmitter accepts up current draw by control board feature 24V (CSW24UL, CSL24UL) configurations. Control Board Feature Main board with no radios learned One or more LiftMaster® remote controls learned MyQ® device or wireless dual-gate learned Expansion board...
...a total system of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) +5.8 Note: If the additional features on the expansion board are not used, it may be unplugged to install manual for cycles and standby time. CSW24UL / CSL24UL Current consumption by feature and accessory...transmitters and each transmitter accepts up current draw by control board feature 24V (CSW24UL, CSL24UL) configurations. Control Board Feature Main board with no radios learned One or more LiftMaster® remote controls learned MyQ® device or wireless dual-gate learned Expansion board...
UL 325-Listed Gate Operators Guide
Page 46
... -40ºF to 149ºF Edge with Cable 3.8" W x 2.8" H for Long-Lasting Stability and Reliability Pre-Assembled Means an Easier Installation, Saving You Time and Money Cut to Length while on the Job, Allowing You to Meet Almost Any Application Requirements. Roll-Small Profile Versatile... -40ºF to 149ºF -40ºF to 149ºF -40ºF to 149ºF -40ºF to 149ºF -40ºF to install manual for Entrapment Protection Powerful Through-Beam Design Provides Superior Performance in ALL Environmental Conditions. x 1.8" H x 1" W 2 Years 82 ft. x 1.2" H x 1" ...
... -40ºF to 149ºF Edge with Cable 3.8" W x 2.8" H for Long-Lasting Stability and Reliability Pre-Assembled Means an Easier Installation, Saving You Time and Money Cut to Length while on the Job, Allowing You to Meet Almost Any Application Requirements. Roll-Small Profile Versatile... -40ºF to 149ºF -40ºF to 149ºF -40ºF to 149ºF -40ºF to 149ºF -40ºF to install manual for Entrapment Protection Powerful Through-Beam Design Provides Superior Performance in ALL Environmental Conditions. x 1.8" H x 1" W 2 Years 82 ft. x 1.2" H x 1" ...
Solar Gate Reference Guide
Page 2
...12V panels 20 or (2) 20W 12V & (2) 100 10W 12V in power draw for wireless dual-gate feature. *** When installing LMRRUL/LMTBUL heater option refer to install manual for solar daily cycles are not used, it may be unplugged to conserve additional power draw (11mA) LA500PKGUL SINGLE GATE SOLAR... Current consumption by feature and accessory to determine total current draw. Control Board Feature Main board with no radios learned One or more LiftMaster® remote controls learned MyQ® device or wireless dual-gate learned Expansion board Per loop detector LOOPDETLM (up to 3 loop ...
...12V panels 20 or (2) 20W 12V & (2) 100 10W 12V in power draw for wireless dual-gate feature. *** When installing LMRRUL/LMTBUL heater option refer to install manual for solar daily cycles are not used, it may be unplugged to conserve additional power draw (11mA) LA500PKGUL SINGLE GATE SOLAR... Current consumption by feature and accessory to determine total current draw. Control Board Feature Main board with no radios learned One or more LiftMaster® remote controls learned MyQ® device or wireless dual-gate learned Expansion board Per loop detector LOOPDETLM (up to 3 loop ...
Solar Gate Reference Guide
Page 3
...not used, it may require additional solar panels. For full details please reference the manual. L A 412 PKG U L Current consumption by feature and accessory to install manual for a total system of +11 (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) Note: If the additional features on ...! #NUM! 47 39 37 9 33Ah battery 15 8 7 1 #NUM! 35 27 25 1 #NUM! 57 48 46 17 #NUM! #NUM! * When installing LMRRUL/LMTBUL heater option refer to determine total current draw. Solar optimized or wireless accessories are recommended in the given regions. Control Board Feature Main...
...not used, it may require additional solar panels. For full details please reference the manual. L A 412 PKG U L Current consumption by feature and accessory to install manual for a total system of +11 (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) Note: If the additional features on ...! #NUM! 47 39 37 9 33Ah battery 15 8 7 1 #NUM! 35 27 25 1 #NUM! 57 48 46 17 #NUM! #NUM! * When installing LMRRUL/LMTBUL heater option refer to determine total current draw. Solar optimized or wireless accessories are recommended in the given regions. Control Board Feature Main...
Solar Gate Reference Guide
Page 4
...18 16 #NUM! #NUM! 30 28 7 #NUM! 37 35 13 #NUM! RSW12UL / RSL12UL Current consumption by feature and accessory to install manual for a total system of +11 (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) Note: If the additional features on the expansion board are not used, it may be unplugged to ... 50 15 26 32 #NUM! #NUM! 2 50 50 50 50 50 50 49 50 50 25 50 50 #NUM! 17 30 * When installing LMRRUL/LMTBUL heater option refer to determine total current draw. Add up to (2) wired edges for cycles and standby time. Control Board Feature Main board...
...18 16 #NUM! #NUM! 30 28 7 #NUM! 37 35 13 #NUM! RSW12UL / RSL12UL Current consumption by feature and accessory to install manual for a total system of +11 (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) Note: If the additional features on the expansion board are not used, it may be unplugged to ... 50 15 26 32 #NUM! #NUM! 2 50 50 50 50 50 50 49 50 50 25 50 50 #NUM! 17 30 * When installing LMRRUL/LMTBUL heater option refer to determine total current draw. Add up to (2) wired edges for cycles and standby time. Control Board Feature Main board...
Solar Gate Reference Guide
Page 5
...+3.8 Monitored Wireless Edge Kit (Model LMWEKITU receiver accepts up to (4) edge transmitters and each transmitter accepts up current draw by control board feature 24V (CSW24UL, CSL24UL) configurations. Zone 3 (2 Hrs Sunlight/Day) 7Ah 33Ah batteries batteries 6 6 3 3 1 2 #NUM! #NUM! #NUM! #NUM! 14 16 ...44 #NUM! 3 81 146 76 140 73 137 34 92 #NUM! 20 * When installing LMRRUL/LMTBUL heater option refer to install manual for a total system of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) +5.8 Note: If the additional features on the expansion board...
...+3.8 Monitored Wireless Edge Kit (Model LMWEKITU receiver accepts up to (4) edge transmitters and each transmitter accepts up current draw by control board feature 24V (CSW24UL, CSL24UL) configurations. Zone 3 (2 Hrs Sunlight/Day) 7Ah 33Ah batteries batteries 6 6 3 3 1 2 #NUM! #NUM! #NUM! #NUM! 14 16 ...44 #NUM! 3 81 146 76 140 73 137 34 92 #NUM! 20 * When installing LMRRUL/LMTBUL heater option refer to install manual for a total system of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) +5.8 Note: If the additional features on the expansion board...