CA493-00130 Rev
Page 1
... describes how to service the charge roller unit. Scope Document number Revision number Date Security level HP Indigo 10000 Digital Press, HP Indigo 15K Digital Press, HP Indigo 15K HD Digital Press, HP Indigo 12000 Digital Press, HP Indigo 12000 HD Digital Press, HP Indigo 20000 Digital Press, HP Indigo 25K Digital Press, HP Indigo 30000 Digital Press, HP Indigo 35K Digital Press. CAUTION: The procedures contained in this document is accurate at the date of this document...
... describes how to service the charge roller unit. Scope Document number Revision number Date Security level HP Indigo 10000 Digital Press, HP Indigo 15K Digital Press, HP Indigo 15K HD Digital Press, HP Indigo 12000 Digital Press, HP Indigo 12000 HD Digital Press, HP Indigo 20000 Digital Press, HP Indigo 25K Digital Press, HP Indigo 30000 Digital Press, HP Indigo 35K Digital Press. CAUTION: The procedures contained in this document is accurate at the date of this document...
CA493-00130 Rev
Page 4
Unit location and function The charge roller (CR) electrically charges the surface of two rollers: ● Charge roller - It is pressed against the surface of operation It is located above the PIP drum. This roller is made from metal. Figure 2-1 Charge roller location The charge roller ...
Unit location and function The charge roller (CR) electrically charges the surface of two rollers: ● Charge roller - It is pressed against the surface of operation It is located above the PIP drum. This roller is made from metal. Figure 2-1 Charge roller location The charge roller ...
CA493-00130 Rev
Page 6
.... 1. Open the engine front door. 3. 3 Procedures This chapter describes the procedures for servicing the charge roller unit. Turn OFF the PC and shut down the press. 2.
.... 1. Open the engine front door. 3. 3 Procedures This chapter describes the procedures for servicing the charge roller unit. Turn OFF the PC and shut down the press. 2.
CA493-00130 Rev
Page 8
...engage mechanism. Remove these screws, raise the engage mechanism. Carefully place the front engage mechanism onto the 2 placement pins on the front press wall. Open the engine rear door, locate the charge roller rear engage mechanism and remove the 2 M4 Allen screws that secure the ...the rear engage mechanism. Insert the 4 original M6 Allen screws into the front engage mechanism. The front engage mechanism is also connected to the press chassis by 4 M6 Allen screws. Insert the 4 original M6 Allen screws into the rear engage mechanism. To access these screws, raise the ...
...engage mechanism. Remove these screws, raise the engage mechanism. Carefully place the front engage mechanism onto the 2 placement pins on the front press wall. Open the engine rear door, locate the charge roller rear engage mechanism and remove the 2 M4 Allen screws that secure the ...the rear engage mechanism. Insert the 4 original M6 Allen screws into the front engage mechanism. The front engage mechanism is also connected to the press chassis by 4 M6 Allen screws. Insert the 4 original M6 Allen screws into the rear engage mechanism. To access these screws, raise the ...
CA493-00130 Rev
Page 9
... charge roller assembly. Repeat steps a-d for the front rail. 4. Remove the rubber charge roller from the press. 2. Install the rails, as follows: a. Close the engine front door. c. At the press front, reinsert (slide on the rear press wall. Replacing the carbon brushes 7 At the front side, reinstall the guide pin to the rear...
... charge roller assembly. Repeat steps a-d for the front rail. 4. Remove the rubber charge roller from the press. 2. Install the rails, as follows: a. Close the engine front door. c. At the press front, reinsert (slide on the rear press wall. Replacing the carbon brushes 7 At the front side, reinstall the guide pin to the rear...
CA493-00130 Rev
Page 11
Repeat the above procedure for the second carbon brush. 9. Remove the charge roller assembly from the charge roller assembly. 10. Reinstall the rubber charge roller from the press. 2. Replacing the carbon brush housing Do the following: 1. Unscrew the carbon brush caps. Remove the rubber charge roller from the charge roller assembly. 3. Insert the new carbon brush into position. Figure 3-9 Removing the carbon brush caps Replacing the carbon brush housing 9 6. Reinstall the charge roller assembly to the press. Figure 3-8 Carbon brush 7. Install the carbon brush cap. 8.
Repeat the above procedure for the second carbon brush. 9. Remove the charge roller assembly from the charge roller assembly. 10. Reinstall the rubber charge roller from the press. 2. Replacing the carbon brush housing Do the following: 1. Unscrew the carbon brush caps. Remove the rubber charge roller from the charge roller assembly. 3. Insert the new carbon brush into position. Figure 3-9 Removing the carbon brush caps Replacing the carbon brush housing 9 6. Reinstall the charge roller assembly to the press. Figure 3-8 Carbon brush 7. Install the carbon brush cap. 8.
CA493-00130 Rev
Page 14
.... Figure 3-16 Pushing on carbon brush housing 11. 10. Return the end cap cover. 14. Reinstall the rubber charge roller from the press. 2. The following procedure is applicable to the press. Reinstall the charge roller assembly to both motors. 1. Remove the charge roller assembly from the charge roller assembly. 17. Push the...
.... Figure 3-16 Pushing on carbon brush housing 11. 10. Return the end cap cover. 14. Reinstall the rubber charge roller from the press. 2. The following procedure is applicable to the press. Reinstall the charge roller assembly to both motors. 1. Remove the charge roller assembly from the charge roller assembly. 17. Push the...
CA493-00130 Rev
Page 17
Figure 3-22 Inserting new motor into position using the four Allen screws. 11. Fasten the motor into position 8. Insert the new motor into position. Reinstall the charge roller assembly to the press. 7. Reinstall the back panel. 10. Replacing the Jump-Over-Seam (JOS) motor 15 Reinstall the rubber charge roller from the charge roller assembly. 12. Connect the motor connector. 9.
Figure 3-22 Inserting new motor into position using the four Allen screws. 11. Fasten the motor into position 8. Insert the new motor into position. Reinstall the charge roller assembly to the press. 7. Reinstall the back panel. 10. Replacing the Jump-Over-Seam (JOS) motor 15 Reinstall the rubber charge roller from the charge roller assembly. 12. Connect the motor connector. 9.
CA493-00130 Rev
Page 21
... roller over the seam area to prevent damaging the roller. ● The Seam Calibration wizard is performed automatically together with the press on the balancing roller reduces its electrical efficiency, and causes the charge roller to be calibrated at a higher voltage. charge roller...to calibrate the charge roller. Charge roller seam area calibration (a.k.a. 4 Calibrations This chapter describes how to record the correct press angle of the seam. ● Incorrect press angle values may cause: - Figure 4-1 The charge roller seam area 1 Balancing roller 2 Charge roller 3 PIP drum...
... roller over the seam area to prevent damaging the roller. ● The Seam Calibration wizard is performed automatically together with the press on the balancing roller reduces its electrical efficiency, and causes the charge roller to be calibrated at a higher voltage. charge roller...to calibrate the charge roller. Charge roller seam area calibration (a.k.a. 4 Calibrations This chapter describes how to record the correct press angle of the seam. ● Incorrect press angle values may cause: - Figure 4-1 The charge roller seam area 1 Balancing roller 2 Charge roller 3 PIP drum...
CA493-00130 Rev
Page 25
... connector, make sure that BypassTableTopic > crJosJumps is connected properly. From Print Care, run the Force Leveling Calibration wizard. 9. Check the charge roller wiring at the press side: ● Check charge roller engage side - In Systab, check the bypass statuses: ● Make sure that BypassTableTopic > crJosActive is False. ● Make sure that...
... connector, make sure that BypassTableTopic > crJosJumps is connected properly. From Print Care, run the Force Leveling Calibration wizard. 9. Check the charge roller wiring at the press side: ● Check charge roller engage side - In Systab, check the bypass statuses: ● Make sure that BypassTableTopic > crJosActive is False. ● Make sure that...
CA493-00130 Rev
Page 28
... the charge roller This is a possible solution for the charge roller securing issue. This is a solution for the "1/2 dark page" print quality issue. Change the press status to accommodate the grounding cables. Diagnosing the issue Do the following: 1. Due to a mistake, the charge roller grounding cables were installed on the rear...
... the charge roller This is a possible solution for the charge roller securing issue. This is a solution for the "1/2 dark page" print quality issue. Change the press status to accommodate the grounding cables. Diagnosing the issue Do the following: 1. Due to a mistake, the charge roller grounding cables were installed on the rear...
CA493-00130 Rev
Page 29
... or Loctite 222. Solving the issue 27 If they are connected to Solving the issue on the press. Turn off the press. 3. Figure 5-4 Incorrect Figure 5-5 Correct Solving the issue Do the following: 1. Turn off the press software. 2. Reinstall the screw onto the rail. Remove the charge roller from the engine. 6. Reinstall the screw...
... or Loctite 222. Solving the issue 27 If they are connected to Solving the issue on the press. Turn off the press. 3. Figure 5-4 Incorrect Figure 5-5 Correct Solving the issue Do the following: 1. Turn off the press software. 2. Reinstall the screw onto the rail. Remove the charge roller from the engine. 6. Reinstall the screw...
CA493-00130 Rev
Page 30
Turn on the press. 12. Undo the lockout/tagout procedure. 11. Figure 5-6 Rail screws 7. Reinstall the charge roller in place. Close the engine front door. 10. Figure 5-7 Grounding cables 8. Install the three grounding cables in the engine. 9. Turn on the press software. 28 Chapter 5 Troubleshooting
Turn on the press. 12. Undo the lockout/tagout procedure. 11. Figure 5-6 Rail screws 7. Reinstall the charge roller in place. Close the engine front door. 10. Figure 5-7 Grounding cables 8. Install the three grounding cables in the engine. 9. Turn on the press software. 28 Chapter 5 Troubleshooting
CA493-00130 Rev
Page 32
Revision CA493-00130 Rev00 CA493-00130 Rev01 CA493-00130 Rev02 CA493-00130 Rev03 CA493-00130 Rev04 Description Initial document Added HP Indigo 20000 Digital Press and HP Indigo 30000 Digital Press to the scope Added the following chapters: "Theory of operation", "Calibrations", and "Troubleshooting" Added: Charge roller not secured properly Added: Balancing roller replacement and cleaning ...
Revision CA493-00130 Rev00 CA493-00130 Rev01 CA493-00130 Rev02 CA493-00130 Rev03 CA493-00130 Rev04 Description Initial document Added HP Indigo 20000 Digital Press and HP Indigo 30000 Digital Press to the scope Added the following chapters: "Theory of operation", "Calibrations", and "Troubleshooting" Added: Charge roller not secured properly Added: Balancing roller replacement and cleaning ...
Color Pyramid - Press Baseline and Maintenance -- CA493-02110Document P/N: Rev 02Revision number:
Page 1
Check CE Suitcase for known and unknown substrate types. HP Indigo 30000 Digital Press CA493-02110Document P/N: 02Revision number: 17 March 2016Date: HP Confidential The information contained in this document. i Press Baseline and Maintenance Service Document Purpose Scope Document number Revision number Date Security level To describe how to perform color related baseline and full color calibrations for the most recent version of this document is accurate at the date of release. Color Pyramid -
Check CE Suitcase for known and unknown substrate types. HP Indigo 30000 Digital Press CA493-02110Document P/N: 02Revision number: 17 March 2016Date: HP Confidential The information contained in this document. i Press Baseline and Maintenance Service Document Purpose Scope Document number Revision number Date Security level To describe how to perform color related baseline and full color calibrations for the most recent version of this document is accurate at the date of release. Color Pyramid -
Color Pyramid - Press Baseline and Maintenance -- CA493-02110Document P/N: Rev 02Revision number:
Page 2
Table of contents 1 Overview ...1 Prerequisites ...1 Estimated installation time ...1 Special jigs and tools ...1 2 Procedures ...2 Press baseline...2 Verifying site conditions ...2 Verifying print quality...2 Color calibration...3 Defining and calibrating an unknown substrate ...3 Appendix A Revision history and confidentiality notice ...7 Revision history...7 Printing instructions...7 Confidentiality notice...7 ii
Table of contents 1 Overview ...1 Prerequisites ...1 Estimated installation time ...1 Special jigs and tools ...1 2 Procedures ...2 Press baseline...2 Verifying site conditions ...2 Verifying print quality...2 Color calibration...3 Defining and calibrating an unknown substrate ...3 Appendix A Revision history and confidentiality notice ...7 Revision history...7 Printing instructions...7 Confidentiality notice...7 ii
Color Pyramid - Press Baseline and Maintenance -- CA493-02110Document P/N: Rev 02Revision number:
Page 3
Prerequisites It lists the prerequisites ● Press software version I42 or later ● High gloss, known substrate Estimated installation time 4 hours Special jigs and tools Special jigs and tools are listed below. ● X-Rite densitometer, defined to perform color related baseline and full color calibrations for known and unknown substrate types. This is part of the color pyramid calibration process. 1 Overview This document describes how to work on T status ● Primer indicator ● Color patches job Overview 1
Prerequisites It lists the prerequisites ● Press software version I42 or later ● High gloss, known substrate Estimated installation time 4 hours Special jigs and tools Special jigs and tools are listed below. ● X-Rite densitometer, defined to perform color related baseline and full color calibrations for known and unknown substrate types. This is part of the color pyramid calibration process. 1 Overview This document describes how to work on T status ● Primer indicator ● Color patches job Overview 1
Color Pyramid - Press Baseline and Maintenance -- CA493-02110Document P/N: Rev 02Revision number:
Page 4
... the ILP T1 and T2 calibration wizard. 8. Print four copies of each of press. If necessary, clean the BID developers, clean the cleaning station wiper, and perform any other activity to Menu > Press Status > Counters > Supplies. 2 Procedures It describes the procedure on how to ...°C (68 - 77 °F) ● Required ambient relative humidity: 50 - 70% non-condensing. Check ILP substrate priming using the press UI. 4. Press baseline It explains the baseline of the following jobs to be in good condition, that is 2k-30k impressions. Verifying site conditions It explains the...
... the ILP T1 and T2 calibration wizard. 8. Print four copies of each of press. If necessary, clean the BID developers, clean the cleaning station wiper, and perform any other activity to Menu > Press Status > Counters > Supplies. 2 Procedures It describes the procedure on how to ...°C (68 - 77 °F) ● Required ambient relative humidity: 50 - 70% non-condensing. Check ILP substrate priming using the press UI. 4. Press baseline It explains the baseline of the following jobs to be in good condition, that is 2k-30k impressions. Verifying site conditions It explains the...
Color Pyramid - Press Baseline and Maintenance -- CA493-02110Document P/N: Rev 02Revision number:
Page 9
...-02110Document P/N: Rev 00 CA493-02110Document P/N: Rev 01 CA493-02110Document P/N: Rev 02Revision number: Description Initial document First define and calibrate the known substrate. Responsible Engineer (TS) Press Group Manager R&D Engineer Engineering Documentation Manager Configuration Control Written by Shai LevyResponsible engineer: Yuval Bloomberg Kobi Sinuany Rafael Levi Ronit Shugal / Isaac Diwan Sigal Aknin...
...-02110Document P/N: Rev 00 CA493-02110Document P/N: Rev 01 CA493-02110Document P/N: Rev 02Revision number: Description Initial document First define and calibrate the known substrate. Responsible Engineer (TS) Press Group Manager R&D Engineer Engineering Documentation Manager Configuration Control Written by Shai LevyResponsible engineer: Yuval Bloomberg Kobi Sinuany Rafael Levi Ronit Shugal / Isaac Diwan Sigal Aknin...
Standard Operating Procedure for Indigo 30000 Digital PressUser Guide
Page 1
Standard Operating Procedure for HP Indigo 30000 Digital Press User Guide March 2015
Standard Operating Procedure for HP Indigo 30000 Digital Press User Guide March 2015