HP BladeSystem c-Class Site Planning Guide
Page 4
... America/Japan 49 Three-phase HP 2250W Power Supply specification (International 49 Three-phase HP 2400W Power Supply specification (International 50 DC power supply specification ...50 Hardware specifications and requirements 51 Enclosure specifications...51 HP BladeSystem c7000 Enclosure specifications 51 HP BladeSystem c3000 Enclosure specifications 51 HP 10000 G2 rack specifications ...52 Rack requirements ...52 Rack-free environment requirements ...53 Configuration scenarios...54 Example...
... America/Japan 49 Three-phase HP 2250W Power Supply specification (International 49 Three-phase HP 2400W Power Supply specification (International 50 DC power supply specification ...50 Hardware specifications and requirements 51 Enclosure specifications...51 HP BladeSystem c7000 Enclosure specifications 51 HP BladeSystem c3000 Enclosure specifications 51 HP 10000 G2 rack specifications ...52 Rack requirements ...52 Rack-free environment requirements ...53 Configuration scenarios...54 Example...
HP BladeSystem c-Class Site Planning Guide
Page 6
...8226; General site preparation guidelines (on page 29) This section details the power requirements and electrical factors that must be considered before installation. The HP BladeSystem documentation website includes white papers, tech briefs, installation instructions, user guides, ... includes tools and information to accept HP BladeSystem hardware. • Environmental requirements (on page 15) This section provides information on the environmental site requirements, including temperature, airflow, and space requirements. • Power requirements and considerations (on page 7) This...
...8226; General site preparation guidelines (on page 29) This section details the power requirements and electrical factors that must be considered before installation. The HP BladeSystem documentation website includes white papers, tech briefs, installation instructions, user guides, ... includes tools and information to accept HP BladeSystem hardware. • Environmental requirements (on page 15) This section provides information on the environmental site requirements, including temperature, airflow, and space requirements. • Power requirements and considerations (on page 7) This...
HP BladeSystem c-Class Site Planning Guide
Page 29
... and must be performed by NFPA-70 (National Electric Code) and NFPA-75 (code for computer and data processing equipment. Power requirements and considerations 29 Power requirements and considerations Power requirements When planning power distribution requirements, observe the following: • The power load must be balanced between available AC supply branch circuits. • The AC current load attached to...
... and must be performed by NFPA-70 (National Electric Code) and NFPA-75 (code for computer and data processing equipment. Power requirements and considerations 29 Power requirements and considerations Power requirements When planning power distribution requirements, observe the following: • The power load must be balanced between available AC supply branch circuits. • The AC current load attached to...
HP BladeSystem c-Class Site Planning Guide
Page 30
...8320VA each) or two 30A three-phase circuits (8640VA each watt of redundant power costs between $23 and $25 depending on computer equipment list the ratings for determining power requirements, which are needed. An order of magnitude calculation using nameplate values typically ...amperage, which is usually lower, typically between 3kVA and 4kVA. Power requirements and considerations 30 The cost of the UPS equipment, transformers, switchgear, generators, and other infrastructure to provide the maximum power consumption throughout the life of system. In North America the relevant...
...8320VA each) or two 30A three-phase circuits (8640VA each watt of redundant power costs between $23 and $25 depending on computer equipment list the ratings for determining power requirements, which are needed. An order of magnitude calculation using nameplate values typically ...amperage, which is usually lower, typically between 3kVA and 4kVA. Power requirements and considerations 30 The cost of the UPS equipment, transformers, switchgear, generators, and other infrastructure to provide the maximum power consumption throughout the life of system. In North America the relevant...
HP BladeSystem c-Class Site Planning Guide
Page 31
...: o For ML and DL products, on the HP website (http://h30099.www3.hp.com/configurator/powercalcs.asp) o For BladeSystem products, on Dynamic Power Capping, see the applicable documentation for many customers. To determine the power required to your environment, and then size the electrical infrastructure accordingly. Power requirements and considerations 31 HP provides power sizing tools for cooling the infrastructure.
...: o For ML and DL products, on the HP website (http://h30099.www3.hp.com/configurator/powercalcs.asp) o For BladeSystem products, on Dynamic Power Capping, see the applicable documentation for many customers. To determine the power required to your environment, and then size the electrical infrastructure accordingly. Power requirements and considerations 31 HP provides power sizing tools for cooling the infrastructure.
HP BladeSystem c-Class Site Planning Guide
Page 32
For each situation, refer to power interruptions. Power requirements and considerations 32 The products are exceeded. Factors affecting power quality Common factors that affect power quality include the following: • Electrical storms • Utility service brownouts or sags • Faults in the distribution system wiring Power system protection HP products can exceed the design specifications of service. Depending...
For each situation, refer to power interruptions. Power requirements and considerations 32 The products are exceeded. Factors affecting power quality Common factors that affect power quality include the following: • Electrical storms • Utility service brownouts or sags • Faults in the distribution system wiring Power system protection HP products can exceed the design specifications of service. Depending...
HP BladeSystem c-Class Site Planning Guide
Page 33
... HP website http://www.hp.com/og/powercapping. Power receptacle required L15-30R IEC 309, 4-Pole, 5-Wire, red IEC320-C19* 45DG 4AWG 1/4 2H (Twohole lug, 45degree bend, 6.4-mm (0.25-in) stud hole size, 16-mm (0.63-in ) studs for single-phase solutions. Power options The following configurations: Power requirements and... delta 16A 346-415V 16A Singlephase 100V to 120V or 200V to form a common ground. See the HP Website (http://www.hp.com/go/rackandpower). All power sources such as servers and storage devices can be connected together to 240V - Enclosure part number 412136-B2x...
... HP website http://www.hp.com/og/powercapping. Power receptacle required L15-30R IEC 309, 4-Pole, 5-Wire, red IEC320-C19* 45DG 4AWG 1/4 2H (Twohole lug, 45degree bend, 6.4-mm (0.25-in) stud hole size, 16-mm (0.63-in ) studs for single-phase solutions. Power options The following configurations: Power requirements and... delta 16A 346-415V 16A Singlephase 100V to 120V or 200V to form a common ground. See the HP Website (http://www.hp.com/go/rackandpower). All power sources such as servers and storage devices can be connected together to 240V - Enclosure part number 412136-B2x...
HP BladeSystem c-Class Site Planning Guide
Page 34
..., because they run cooler, they produce less heat which helps to the same power distribution device (PDU or UPS). To provide additional redundancy, HP recommends routing the power through separate branch circuits, breaker panels, and PDUs. Power requirements and considerations 34 Non-redundant power For equipment supplied by a single source of high line voltage operation include...
..., because they run cooler, they produce less heat which helps to the same power distribution device (PDU or UPS). To provide additional redundancy, HP recommends routing the power through separate branch circuits, breaker panels, and PDUs. Power requirements and considerations 34 Non-redundant power For equipment supplied by a single source of high line voltage operation include...
HP BladeSystem c-Class Site Planning Guide
Page 35
...be grounded properly for personnel and equipment. Conduit that all power distribution devices used in which a neutral return path and a protective earth are listed or certified grounding-type devices. Grounding systems HP systems are tested and certified only with IEC 60309 are... Any of the following limits when connecting products to this purpose. Using common power outlet strips to supply power to AC power distribution devices: Power requirements and considerations 35 In all power distribution devices used under raised floors) • Armored cable Building distribution All ...
...be grounded properly for personnel and equipment. Conduit that all power distribution devices used in which a neutral return path and a protective earth are listed or certified grounding-type devices. Grounding systems HP systems are tested and certified only with IEC 60309 are... Any of the following limits when connecting products to this purpose. Using common power outlet strips to supply power to AC power distribution devices: Power requirements and considerations 35 In all power distribution devices used under raised floors) • Armored cable Building distribution All ...
HP BladeSystem c-Class Site Planning Guide
Page 36
... on circuit overcurrent device ratings). • For UPS products and PDUs that have permanently attached AC power cords or are Power requirements and considerations 36 Connections such as required by applicable codes. NOTE: The green wire ground conductor can be grounded to personnel and might be...Otherwise, an electrical potential could be hazardous to the electrical service entrance with green (green/yellow) wire ground conductors. HP recommends that might cause performance issues for the connected products. • For UPS products and PDUs that could exist that have...
... on circuit overcurrent device ratings). • For UPS products and PDUs that have permanently attached AC power cords or are Power requirements and considerations 36 Connections such as required by applicable codes. NOTE: The green wire ground conductor can be grounded to personnel and might be...Otherwise, an electrical potential could be hazardous to the electrical service entrance with green (green/yellow) wire ground conductors. HP recommends that might cause performance issues for the connected products. • For UPS products and PDUs that could exist that have...
HP BladeSystem c-Class Site Planning Guide
Page 37
measured above 3.0 V might need high-frequency ground return paths in addition to the safety or power distribution system 50-60Hz grounding system. Power requirements and considerations 37 Signal interconnects between system cabinets might be 70 cm (24 in) or less in place of a ... equipment performance issues and must be corrected before placing the equipment in close proximity to the site grounding grid. HP recommends the use a cabinet-to personnel. Power panels located in service. If a raised floor system is clamped mechanically to floor pedestals and bonded properly to ...
measured above 3.0 V might need high-frequency ground return paths in addition to the safety or power distribution system 50-60Hz grounding system. Power requirements and considerations 37 Signal interconnects between system cabinets might be 70 cm (24 in) or less in place of a ... equipment performance issues and must be corrected before placing the equipment in close proximity to the site grounding grid. HP recommends the use a cabinet-to personnel. Power panels located in service. If a raised floor system is clamped mechanically to floor pedestals and bonded properly to ...
HP BladeSystem c-Class Site Planning Guide
Page 38
...floor) or cable trough ground point (nonraised floor). 3. Connections that the braid contact on the restraining force applied. Power requirements and considerations 38 Therefore, the integrity of an electrical connection depends on each pedestal to four strips using 6-mm (0.25... washers). 4. • Add a grounding grid made of copper strips mounted to weaken. Equipment grounding implementation details Connect all HP equipment cabinets to the manufacturer's torque recommendation. For installation procedures, see the appropriate installation guide. Connect each end of the ...
...floor) or cable trough ground point (nonraised floor). 3. Connections that the braid contact on the restraining force applied. Power requirements and considerations 38 Therefore, the integrity of an electrical connection depends on each pedestal to four strips using 6-mm (0.25... washers). 4. • Add a grounding grid made of copper strips mounted to weaken. Equipment grounding implementation details Connect all HP equipment cabinets to the manufacturer's torque recommendation. For installation procedures, see the appropriate installation guide. Connect each end of the ...
HP BladeSystem c-Class Site Planning Guide
Page 39
These options are changed to -Order processes. Existing units can damage electronic components. Power requirements and considerations 39 Wiring connections must only be made on a conductive, nonpainted surface. Ground connections must be converted...-phase AC power. Heavy foot traffic can create ESD that meet approved industry standards. Route data communications cables away from -48V DC site power sources. Power configuration HP BladeSystem enclosures can be used on converting an enclosure power source, see the HP website (http://www.hp.com/go/bladesystem). This feature...
These options are changed to -Order processes. Existing units can damage electronic components. Power requirements and considerations 39 Wiring connections must only be made on a conductive, nonpainted surface. Ground connections must be converted...-phase AC power. Heavy foot traffic can create ESD that meet approved industry standards. Route data communications cables away from -48V DC site power sources. Power configuration HP BladeSystem enclosures can be used on converting an enclosure power source, see the HP website (http://www.hp.com/go/bladesystem). This feature...
HP BladeSystem c-Class Site Planning Guide
Page 41
... to an installed PDU. 3. o On the left side: To install the power cord retention bracket on the left side of the enclosure, ensure the power cord retention tabs are located on the left side of the enclosure. 2. Power requirements and considerations 41 • HP BladeSystem c7000 Enclosure To cable the enclosure using a single-phase AC configuration...
... to an installed PDU. 3. o On the left side: To install the power cord retention bracket on the left side of the enclosure, ensure the power cord retention tabs are located on the left side of the enclosure. 2. Power requirements and considerations 41 • HP BladeSystem c7000 Enclosure To cable the enclosure using a single-phase AC configuration...
HP BladeSystem c-Class Site Planning Guide
Page 42
...circuit breakers for the enclosure to power up for the first time, it takes to 2 minutes. When the enclosure powers up , while an enclosure with fewer server blades might take less time. Power requirements and considerations 42 Slide the power cord retention bracket until they snap ...into the slots on the server blades during discovery. For example, a full enclosure of each power cord overmold, and then squeeze each snap ...
...circuit breakers for the enclosure to power up for the first time, it takes to 2 minutes. When the enclosure powers up , while an enclosure with fewer server blades might take less time. Power requirements and considerations 42 Slide the power cord retention bracket until they snap ...into the slots on the server blades during discovery. For example, a full enclosure of each power cord overmold, and then squeeze each snap ...
HP BladeSystem c-Class Site Planning Guide
Page 43
... PDU. This specific wiring configuration is used to ensure that came with the PDU For technical specifications on circuit breakers. Port 2 = uppermost 1 = bottommost Top Top Power requirements and considerations 43 PDU installation The PDU can be connected to HP S348 (part number AF916A) PDUs.
... PDU. This specific wiring configuration is used to ensure that came with the PDU For technical specifications on circuit breakers. Port 2 = uppermost 1 = bottommost Top Top Power requirements and considerations 43 PDU installation The PDU can be connected to HP S348 (part number AF916A) PDUs.
HP BladeSystem c-Class Site Planning Guide
Page 44
Enclosure/switch Power supply Switch A Enclosure C Enclosure C Enclosure C Enclosure C Enclosure C Enclosure C Enclosure B Enclosure B Enclosure B Enclosure B Enclosure B Enclosure B Enclosure A Enclosure A Enclosure A Enclosure A Enclosure...L2B Left L3A Left L2A Left L1A Right L3A Right L2A Right L1A Port 2 = uppermost 1 = bottommost Top - 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 c3000 PDU example Two example redundant configurations are shown in the following figures: • N+N redundant, 5kVA enclosure configuration with 16A 3-phase PDU Power requirements and considerations 44
Enclosure/switch Power supply Switch A Enclosure C Enclosure C Enclosure C Enclosure C Enclosure C Enclosure C Enclosure B Enclosure B Enclosure B Enclosure B Enclosure B Enclosure B Enclosure A Enclosure A Enclosure A Enclosure A Enclosure...L2B Left L3A Left L2A Left L1A Right L3A Right L2A Right L1A Port 2 = uppermost 1 = bottommost Top - 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 c3000 PDU example Two example redundant configurations are shown in the following figures: • N+N redundant, 5kVA enclosure configuration with 16A 3-phase PDU Power requirements and considerations 44
HP BladeSystem c-Class Site Planning Guide
Page 45
.... Power requirements and considerations 45 • N+N redundant, 5kVA enclosure configuration with fewer server blades might take less time. Turn on the number of 16 server blades might take 5 minutes to power up to complete initialization depends on the AC circuit breakers that power the power cables... it takes to 5 minutes before all server blades are already attached to the AC power source. 3. The time it might take up , while an enclosure with 24A single-phase PDU HP BladeSystem c7000 Enclosure three-phase AC configuration To cable the enclosure using a three-phase AC ...
.... Power requirements and considerations 45 • N+N redundant, 5kVA enclosure configuration with fewer server blades might take less time. Turn on the number of 16 server blades might take 5 minutes to power up to complete initialization depends on the AC circuit breakers that power the power cables... it takes to 5 minutes before all server blades are already attached to the AC power source. 3. The time it might take up , while an enclosure with 24A single-phase PDU HP BladeSystem c7000 Enclosure three-phase AC configuration To cable the enclosure using a three-phase AC ...
HP BladeSystem c-Class Site Planning Guide
Page 46
... have power. HP BladeSystem c7000 Enclosure DC configuration Item 1 2 3 4 5 6 7 8 9 10 Description Chassis grounding lugs DC connectors for power supply bay 1 DC connectors for power supply bay 2 DC connectors for power supply bay 3 DC connectors for power supply bay 4 DC connectors for power supply bay 5 DC connectors for power supply bay 6 Chassis grounding lugs -48 VDC power connections DC return power connections Power requirements...
... have power. HP BladeSystem c7000 Enclosure DC configuration Item 1 2 3 4 5 6 7 8 9 10 Description Chassis grounding lugs DC connectors for power supply bay 1 DC connectors for power supply bay 2 DC connectors for power supply bay 3 DC connectors for power supply bay 4 DC connectors for power supply bay 5 DC connectors for power supply bay 6 Chassis grounding lugs -48 VDC power connections DC return power connections Power requirements...
HP BladeSystem c-Class Site Planning Guide
Page 48
...VAC 2612 VA at 200 VAC to 240 VAC Single-phase HP 2400W High Efficiency Power Supply specification Specification Power cord Output Input requirements Rated input voltage Rated input frequency Rated input current per power supply (maximum) Rated input power per power supply (maximum) Value IEC-320 C19-C20 1.22 m ...Three-phase HP 2250W Power Supply specification (North America/Japan) Specification Value Power cords (2) NEMA L15-30p 2.44 m (10 ft) Max input current per line cord 22.6A at 200 VAC 21.8A at 208 VAC 20.6A at 220 VAC Input requirements Power requirements and considerations...
...VAC 2612 VA at 200 VAC to 240 VAC Single-phase HP 2400W High Efficiency Power Supply specification Specification Power cord Output Input requirements Rated input voltage Rated input frequency Rated input current per power supply (maximum) Rated input power per power supply (maximum) Value IEC-320 C19-C20 1.22 m ...Three-phase HP 2250W Power Supply specification (North America/Japan) Specification Value Power cords (2) NEMA L15-30p 2.44 m (10 ft) Max input current per line cord 22.6A at 200 VAC 21.8A at 208 VAC 20.6A at 220 VAC Input requirements Power requirements and considerations...