Fluke BT520 Support and Manuals
Fluke BT520 Videos
Popular Fluke BT520 Manual Pages
Product Manual - Page 1
Specifications are trademarks of their respective companies. MyFlukeStore Shop for Fluke products online at: www.
.com 1.888.610.7664 All rights reserved. All product names are subject to change without notice. BT520
Battery Analyzer
Users Manual
May 2014 Rev.1, 08/15
© 2014, 2015 Fluke Corporation.
Product Manual - Page 2
... Destination). Fluke warrants that software will be returned to that service center, with its functional specifications for 90 days and that it has been properly recorded on the date of shipment. Fluke's warranty obligation is limited, at : www.
.com 1.888.610.7664 Following repair, the product will operate substantially in accordance with a description of repair/replacement parts when...
Product Manual - Page 4
BT520
Users Manual
Edit a Profile 3-5 Edit a Profile During Creation 3-5 Modify a Profile During Measurement 3-5
Load a Profile 3-5 Load a Profile When Switched to Sequence Mode 3-6 Load a Profile During Measurement in Sequence Mode 3-6
Make Measurements 3-7 Test Battery Internal Resistance and Voltage or Strap Resistance... 3-7 Battery Test Probes 3-8 View Test Readings on the Screen ...
Product Manual - Page 8
...and voltages. An increase in
a Category III environment. • Battery Internal Resistance - Features of a stationary battery system. Chapter 1
Product Overview and Specifications
Introduction
This chapter supplies information about the Product, safety information, contact information, and specifications. Product Overview
The Fluke BT520 Battery Analyzer (the Product) is deteriorating.
Product Manual - Page 9
...battery profile and analysis information can configure a maximum of 10 sets of the battery under test.
• Discharge Volts - BT520
Users Manual
• Battery Voltage - Users can be used for 1 second. The measurement data and battery...receive a Pass/Fail/Warning indication after AutoHold.
• Fluke Battery Analyzer Software - When the AutoSave mode is released when a new ...
Product Manual - Page 14
... Australian EMC Standards. Do
not dispose of this manual and on the Product. HAZARDOUS VOLTAGE.
This product complies with the WEEE Directive marking requirements. 1 Product Overview and Specifications Safety Information
See Table 1-2 for Fluke products online at the source of the building's low-voltage MAINS installation.
Certified by CSA Group to North American...
Product Manual - Page 24
...operation. Push the Back softkey to return to open the Setup menu. 2. The auto-held reading is turned on, ...Battery Internal Resistance and Discharge functions. BT520
Users Manual
4. Use and L to normal operation. Use L and to highlight the correct date format. 5. Date/time is set...Fluke products online at: www.
.com 1.888.610.7664 Push the Confirm softkey. ...
Product Manual - Page 27
...software on the PC, you can analyze the trend of the display. METER MODE shows on the Product, it is stored in Meter mode by default. screen shows.
2.
To switch to create a new profile.
3-1
MyFlukeStore Shop for a test site or analyze... device type, serial number, battery quantity, and battery model. The Product provides two modes for the next battery string or test site.
Sequence...
Product Manual - Page 30
...edit the field values. 6. BT520
Users Manual
Create a Profile The Product provides...Fluke recommends
that you easily switch to the next battery string without the need of Sequence mode, push the Profile softkey. When necessary, push the Edit softkey, and then use the same profile. Note • When the same battery string is available only after templates are downloaded the from PC software...
Product Manual - Page 34
A voltage >60 V causes the fuse to open and needs a replacement. Connect Test Probe to OL, the fuse is open . Use the inner tip of ...Figure 3-2. Examine for Fluke products online at: www.
.com 1.888.610.7664 Push the test lead to set-back the inner tip, until both the inner tip and the outer tip of a battery must be < 60 V. BT520
Users Manual
Battery Test Probes To connect ...
Product Manual - Page 36
...push to battery or the test lead is not installed, the Save...battery resistance measurement, in Meter mode, push LO softkey, in this battery. Erase Test Readings To erase the test readings for Fluke...battery. 2. To activate the low-pass filter for this sequence: 30 mΩ > 300 mΩ > 3000 mΩ > 3 mΩ. Push the Erase softkey. BT520
Users Manual
Set Measurement Range Battery...
Product Manual - Page 38
..., indicating that the tested battery is within the defined tolerance limits. It is WARN for Fluke products online at full capacity, until the voltage of each battery in Sequence mode.
3-12...display. BT520
Users Manual
How the Thresholds Work When a threshold set is applied, the Product compares each resistance reading with the lower voltage from the start of the test when the batteries are ...
Product Manual - Page 40
... order.
Save
UPS
Vdc
Figure 3-3. To manually set the range, push to . All saved data is used by 1.
BT520
Users Manual
Measure DC Voltage The Product can measure dc... upper limit of the current range, the Product automatically decreases a range. The current battery number automatically increases by default. When the input signal reaches 90 % of the lower limit...
Product Manual - Page 45
...battery number) when enabled.
Set the Audio
The interactive test probe has a speaker that can be replaced...Fluke products online at: www.
.com 1.888.610.7664 Push the Confirm softkey. 6. To conserve product battery... Battery number, or Both. 5. BT520
Users Manual
Table 4-1. Manually saves...battery ID.
Push the Select softkey. 4. Turns on the Product to the Setup screen. To set the ...
Fluke BT520 Reviews
Do you have an experience with the Fluke BT520 that you would like to share?
Earn 750 points for your review!
We have not received any reviews for Fluke yet.
Earn 750 points for your review!