Quick Installation Guide
Page 6
...module by performing the following steps to install the fan tray: 1. Figure 7. Installing the Power Supply of the DES-7210 and DES-7206 6 D-Link 6/10 Slot Chassis-Based Switch Figure 4 shows the installed fan tray. +PUGTVVJGRQYGTUWRRN[OQFWNGKPVQVJG cabinet along the ...guide rail. 3. Installing the Power Supply of the DES-7210 and DES-7206 Figure 5. Figure 4. Installing the Power Supply of the fan ...
...module by performing the following steps to install the fan tray: 1. Figure 7. Installing the Power Supply of the DES-7210 and DES-7206 6 D-Link 6/10 Slot Chassis-Based Switch Figure 4 shows the installed fan tray. +PUGTVVJGRQYGTUWRRN[OQFWNGKPVQVJG cabinet along the ...guide rail. 3. Installing the Power Supply of the DES-7210 and DES-7206 Figure 5. Figure 4. Installing the Power Supply of the fan ...
Quick Installation Guide
Page 10
...- Screws - Unpacking Inspection Requirements Checklist Consult the following equipment: - DES-7200 Chassis Carton - Contains the modules, packing list and documentation for the DES-7200. 10 D-Link 6/10 Slot Chassis-Based Switch Management Options This system may be closed. - Connecting the Console... cables are any problems, please contact your distributor. The actual items delivered varies based on the Control Module or in an acceptable condition. 1. Power Cable (for DES-7210 only) - Verify that the equipment has been installed in good condition and comply...
...- Screws - Unpacking Inspection Requirements Checklist Consult the following equipment: - DES-7200 Chassis Carton - Contains the modules, packing list and documentation for the DES-7200. 10 D-Link 6/10 Slot Chassis-Based Switch Management Options This system may be closed. - Connecting the Console... cables are any problems, please contact your distributor. The actual items delivered varies based on the Control Module or in an acceptable condition. 1. Power Cable (for DES-7210 only) - Verify that the equipment has been installed in good condition and comply...