Hardware Installation Guide
Page 25
...on the System LED colors during power-on self-test (POST), see the "Powering On the Switch and Running POST" section on . Chapter 1 Product Overview 10/100 and 10/100/1000 Ports Figure 1-18 Catalyst 3750G-24WS-S25 and 3750G-24WS-S50 Switch LEDs SYST RPS MASTR STAT DUPLX SPEED STACK... power but is not functioning properly. 1. Table 1-1 lists the LED colors and their meanings. Applies only to the Catalyst 3750G-24WS-S25 and 3750G-24WS-S50 switches. Alternating green and amber1 Wireless controller is not functioning properly. Table 1-1 System LED Color System Status Off System is ...
...on the System LED colors during power-on self-test (POST), see the "Powering On the Switch and Running POST" section on . Chapter 1 Product Overview 10/100 and 10/100/1000 Ports Figure 1-18 Catalyst 3750G-24WS-S25 and 3750G-24WS-S50 Switch LEDs SYST RPS MASTR STAT DUPLX SPEED STACK... power but is not functioning properly. 1. Table 1-1 lists the LED colors and their meanings. Applies only to the Catalyst 3750G-24WS-S25 and 3750G-24WS-S50 switches. Alternating green and amber1 Wireless controller is not functioning properly. Table 1-1 System LED Color System Status Off System is ...
Hardware Installation Guide
Page 39
...perform the procedures in mind while planning your switch and how to the switch. Switch Installation 2 C H A P T E R This chapter describes how to start your stack. It describes how to install the switch and make connections to interpret the power-on self-test (POST) that ensures proper operation. It...StackWise Cable to StackWise Ports, page 2-30 • Installing and Removing SFP Modules, page 2-33 • Installing and Removing XENPAK Modules (Catalyst 3750G-16TD Switch), page 2-35 • Connecting to the 10/100 and 10/100/1000 Ports, page 2-39 • Connecting to an SFP Module,...
...perform the procedures in mind while planning your switch and how to the switch. Switch Installation 2 C H A P T E R This chapter describes how to start your stack. It describes how to install the switch and make connections to interpret the power-on self-test (POST) that ensures proper operation. It...StackWise Cable to StackWise Ports, page 2-30 • Installing and Removing SFP Modules, page 2-33 • Installing and Removing XENPAK Modules (Catalyst 3750G-16TD Switch), page 2-35 • Connecting to the 10/100 and 10/100/1000 Ports, page 2-39 • Connecting to an SFP Module,...
Hardware Installation Guide
Page 85
... an SNMP workstation. See the software configuration guide, the switch command reference guide on self-test (POST) failures, port-connectivity problems, and overall switch performance. They show failures in the power-on page 3-5 OL-6336-10 Catalyst 3750 Switch Hardware Installation Guide 3-1 They show power-on Cisco.com, or the documentation that came with your SNMP application...
... an SNMP workstation. See the software configuration guide, the switch command reference guide on self-test (POST) failures, port-connectivity problems, and overall switch performance. They show failures in the power-on page 3-5 OL-6336-10 Catalyst 3750 Switch Hardware Installation Guide 3-1 They show power-on Cisco.com, or the documentation that came with your SNMP application...
Hardware Installation Guide
Page 132
... source: Step 1 Step 2 Step 3 Connect one end of tests that runs automatically to a Cisco redundant power system (RPS), see the documentation that you have stacked your switches, see the "Powering Considerations" section on a switch rear panel. Note If you have a stack, power on all...Step 1 Step 2 Step 3 Start the terminal-emulation program if you are connecting the switch to ensure that the switch functions properly. As the switch powers on, it begins the power-on self-test (POST). Catalyst 3750 Switch Hardware Installation Guide D-6 OL-6336-09 Start a terminal-emulation session.
... source: Step 1 Step 2 Step 3 Connect one end of tests that runs automatically to a Cisco redundant power system (RPS), see the documentation that you have stacked your switches, see the "Powering Considerations" section on a switch rear panel. Note If you have a stack, power on all...Step 1 Step 2 Step 3 Start the terminal-emulation program if you are connecting the switch to ensure that the switch functions properly. As the switch powers on, it begins the power-on self-test (POST). Catalyst 3750 Switch Hardware Installation Guide D-6 OL-6336-09 Start a terminal-emulation session.