(English)
Page 16
...-01-28 ø¿»ƒ 3:26:09 These joints should be grounded to your dryer before installing the exhaust system. Install the ductwork from your dryer, but do not permit grounding through the hole provided in place. Review Electrical Requirements section. and 4-WIRE SYSTEM CONNECTIONS. All U.S. Use duct tape to secure this...
...-01-28 ø¿»ƒ 3:26:09 These joints should be grounded to your dryer before installing the exhaust system. Install the ductwork from your dryer, but do not permit grounding through the hole provided in place. Review Electrical Requirements section. and 4-WIRE SYSTEM CONNECTIONS. All U.S. Use duct tape to secure this...
(English)
Page 17
Review Gas Requirements section. Apply pipe joint compound or about 1 1/2 wraps of Teflon tape over threads. Securely tighten the gas line fitting over all gas connections for gas leaks. 3-WIRE system connections 1. Tighten screw. 3. Tighten the strain relief screws. 5. 01 Installing your dryer... the pipe thread protective cap. Connect the other wires to the center, silver-colored terminal screw of the terminal block cover into your dryer. Neutral wire (white or center wire) 5. 3/4" (1.9 cm) UL-listed strain relief If converting from a 4-wire electrical system to...
Review Gas Requirements section. Apply pipe joint compound or about 1 1/2 wraps of Teflon tape over threads. Securely tighten the gas line fitting over all gas connections for gas leaks. 3-WIRE system connections 1. Tighten screw. 3. Tighten the strain relief screws. 5. 01 Installing your dryer... the pipe thread protective cap. Connect the other wires to the center, silver-colored terminal screw of the terminal block cover into your dryer. Neutral wire (white or center wire) 5. 3/4" (1.9 cm) UL-listed strain relief If converting from a 4-wire electrical system to...