Lenovo IdeaPad Regulatory Notice
Page 6
...NC 27560 Telephone: 1-919-294-5900 6 v Connect the equipment into an outlet on , the user is encouraged to try to correct the interference by unauthorized changes or modifications to this equipment. Lenovo is no guarantee the interference will not occur in a particular installation. Responsible ...more of the FCC Rules. If this device must be determined by turning the equipment off and on a circuit different from Lenovo authorized dealers. v Consult an authorized dealer or service representative for any interference received, including interference that to which can be...
...NC 27560 Telephone: 1-919-294-5900 6 v Connect the equipment into an outlet on , the user is encouraged to try to correct the interference by unauthorized changes or modifications to this equipment. Lenovo is no guarantee the interference will not occur in a particular installation. Responsible ...more of the FCC Rules. If this device must be determined by turning the equipment off and on a circuit different from Lenovo authorized dealers. v Consult an authorized dealer or service representative for any interference received, including interference that to which can be...
Lenovo IdeaPad S9e, S10e and S10 Hardware Maintenance Manual
Page 11
... unplug the power cord quickly. Observe the special safety precautions when you cannot unplug it has been powered off (EPO) switch, disconnecting switch, or electrical outlet. v Never assume that has hazardous voltages. Electrical safety Observe the following precautions: - Many customers have handles covered with a soft material that it , ask the customer...
... unplug the power cord quickly. Observe the special safety precautions when you cannot unplug it has been powered off (EPO) switch, disconnecting switch, or electrical outlet. v Never assume that has hazardous voltages. Electrical safety Observe the following precautions: - Many customers have handles covered with a soft material that it , ask the customer...
Lenovo IdeaPad S9e, S10e and S10 Hardware Maintenance Manual
Page 14
... is insulative and retains a charge even when you use coax or connector-outside shells on a double-insulated or battery-operated system, use of the electrical outlet can occur when there is desirable but not necessary. - v Select a grounding system, such as fully effective. Grounding requirements Electrical grounding of a grounded work mat to... safety and correct system function. You can use have been certified (ISO 9000) as those listed below, to guard against ESD damage by a certified electrician. 6 IdeaPad S9e, S10e, and S10 Hardware Maintenance Manual
... is insulative and retains a charge even when you use coax or connector-outside shells on a double-insulated or battery-operated system, use of the electrical outlet can occur when there is desirable but not necessary. - v Select a grounding system, such as fully effective. Grounding requirements Electrical grounding of a grounded work mat to... safety and correct system function. You can use have been certified (ISO 9000) as those listed below, to guard against ESD damage by a certified electrician. 6 IdeaPad S9e, S10e, and S10 Hardware Maintenance Manual
Lenovo IdeaPad S9e, S10e and S10 Hardware Maintenance Manual
Page 62
...removing the FRU, move it in the direction as given in the drawings by using an electrostatic discharge (ESD) strap (P/N 6405959). 54 IdeaPad S9e, S10e, and S10 Hardware Maintenance Manual To put the new FRU in the steps for rattling sounds. Follow the correct sequence in place, ...electrostatic discharge. Attention: The system board is sensitive to service any computer unless you have made sure that all power cords from electrical outlets, remove the battery pack, and then disconnect any notes that have been trained and certified. Removing and replacing a FRU This section ...
...removing the FRU, move it in the direction as given in the drawings by using an electrostatic discharge (ESD) strap (P/N 6405959). 54 IdeaPad S9e, S10e, and S10 Hardware Maintenance Manual To put the new FRU in the steps for rattling sounds. Follow the correct sequence in place, ...electrostatic discharge. Attention: The system board is sensitive to service any computer unless you have made sure that all power cords from electrical outlets, remove the battery pack, and then disconnect any notes that have been trained and certified. Removing and replacing a FRU This section ...