Generic Site Preparation Guide, Fourth Edition
Page 18
... for whiskers 18 General Site Preparation Guidelines Failures to power supplies and other . There are measured at : http://standards.corp.hp.com/ smc/hpstd/pdf/F-HP0000501.pdf. painted - Use every effort to ensure that opposing row exhaust grills face each other electronic ...and can have intake grills oriented. • Ensure that the environment is as dust- dull - Specifically, disk drives, tape drives, and some filters and cause short life cycles in the site environment. One method to determine their possible presence is used. • Keep air throws from air intake...
... for whiskers 18 General Site Preparation Guidelines Failures to power supplies and other . There are measured at : http://standards.corp.hp.com/ smc/hpstd/pdf/F-HP0000501.pdf. painted - Use every effort to ensure that opposing row exhaust grills face each other electronic ...and can have intake grills oriented. • Ensure that the environment is as dust- dull - Specifically, disk drives, tape drives, and some filters and cause short life cycles in the site environment. One method to determine their possible presence is used. • Keep air throws from air intake...
Generic Site Preparation Guide, Fourth Edition
Page 20
...sufficient to offset the computer equipment dissipation loads, as well as any future server expansion. • Air-conditioning equipment air filters should be capable of handling any space envelope heat gain. Cooling Requirements Air-conditioning equipment requirements and recommendations are usually located ...into the system to meet building code requirements (for metallic particulate contamination before installing electronic equipment. HP strongly recommends to test your facility is located above this altitude, you might need to modify the recommended temperature ranges.
...sufficient to offset the computer equipment dissipation loads, as well as any future server expansion. • Air-conditioning equipment air filters should be capable of handling any space envelope heat gain. Cooling Requirements Air-conditioning equipment requirements and recommendations are usually located ...into the system to meet building code requirements (for metallic particulate contamination before installing electronic equipment. HP strongly recommends to test your facility is located above this altitude, you might need to modify the recommended temperature ranges.
Generic Site Preparation Guide, Fourth Edition
Page 26
...28 NA Special (or Contract) Product specifications controlled by contract or other changes in space requirements to air-conditioning ducts, filters, lighting, and electrical power hardware • Power conditioning equipment • Cabinets for cleaning materials • Maintenance area ...cables and power cables • Access to the space plan and create an equipment layout plan which power cable ships with HP servers. Table 1-5 Product Technical Requirements Based on Customer Environments (continued) Environment Industry Equivalent:1 ASHRAE Operating Environment (ambient)2 Temp...
...28 NA Special (or Contract) Product specifications controlled by contract or other changes in space requirements to air-conditioning ducts, filters, lighting, and electrical power hardware • Power conditioning equipment • Cabinets for cleaning materials • Maintenance area ...cables and power cables • Access to the space plan and create an equipment layout plan which power cable ships with HP servers. Table 1-5 Product Technical Requirements Based on Customer Environments (continued) Environment Industry Equivalent:1 ASHRAE Operating Environment (ambient)2 Temp...
Generic Site Preparation Guide, Fourth Edition
Page 32
... the items on )? Can temperature changes be maintained between 5°C (41 °F) and 35°C (95 °F) (up to 1,525 m/5,000 ft)? Are air-conditioning filters installed and clean? Is shelving available for emergency purposes? 24. Is dual source power used? Are lightning arrestors installed inside the building? 18. Is a telephone...
... the items on )? Can temperature changes be maintained between 5°C (41 °F) and 35°C (95 °F) (up to 1,525 m/5,000 ft)? Are air-conditioning filters installed and clean? Is shelving available for emergency purposes? 24. Is dual source power used? Are lightning arrestors installed inside the building? 18. Is a telephone...
Generic Site Preparation Guide, Fourth Edition
Page 37
...charging of an air-conditioning system to a type of an electrical or mechanical apparatus. The peak current flowing into account. These large filter capacitors act like a short circuit and produce an immediate inrush surge current with a different physical form factor. The peak inrush current ...can be 1.75 inches in the unit itself. The amount of heat required to measure the rate of filter capacitor impedance. A type of measurement to cool the space. D-K daisy chain dehumidification derate downflow EIA unit ESD humidification inrush current KVA...
...charging of an air-conditioning system to a type of an electrical or mechanical apparatus. The peak current flowing into account. These large filter capacitors act like a short circuit and produce an immediate inrush surge current with a different physical form factor. The peak inrush current ...can be 1.75 inches in the unit itself. The amount of heat required to measure the rate of filter capacitor impedance. A type of measurement to cool the space. D-K daisy chain dehumidification derate downflow EIA unit ESD humidification inrush current KVA...
Hardware Manual - rp24xx, Customer Viewable
Page 49
... not be affected by using a humidifier. If spray is used, apply it while the system is not recommended because it gets into the system intake filter and coats the circuitry. Carpeting and/or low humidity is a major source of the other environmental influences that may affect L Class servers. Some of the...
... not be affected by using a humidifier. If spray is used, apply it while the system is not recommended because it gets into the system intake filter and coats the circuitry. Carpeting and/or low humidity is a major source of the other environmental influences that may affect L Class servers. Some of the...
Hardware Manual - rp24xx, Customer Viewable
Page 125
...) 5. The CPU chip socket must be clean and uncontaminated with US power cord) 2. 220/240V Vacuum (HP p/n 1150-5071, no power cord, must order item 3 or 4) 3. Vacuum filter (0.03 micron) (HP p/n 3150-0785) A magnifying glass, (at least 3X power) to be replaced in the inspection of a... CPUs and Socket Cleaning Replacement or installation of the removed CPU socket. Chapter 133 ESD safe, EMI/RFI line filter, acceptable models and options are: 1. 110V Vacuum (HP p/n 1150-5070, comes with dirt and dust particles. U.K. Cleaning Kit Components The A3639-70001 CPU socket cleaning ...
...) 5. The CPU chip socket must be clean and uncontaminated with US power cord) 2. 220/240V Vacuum (HP p/n 1150-5071, no power cord, must order item 3 or 4) 3. Vacuum filter (0.03 micron) (HP p/n 3150-0785) A magnifying glass, (at least 3X power) to be replaced in the inspection of a... CPUs and Socket Cleaning Replacement or installation of the removed CPU socket. Chapter 133 ESD safe, EMI/RFI line filter, acceptable models and options are: 1. 110V Vacuum (HP p/n 1150-5070, comes with dirt and dust particles. U.K. Cleaning Kit Components The A3639-70001 CPU socket cleaning ...
Hardware Manual - rp24xx, Customer Viewable
Page 147
At this will bring up filter options on this will be displayed. Problem Detail: Specific problem information (i.e, power off, functional failure, etc.). At the prompt, GSP>, type CO to return to (i.e., ...