......8 Comprehensive Discussion...9 Computer Room Safety...9 Fire Protection...9 Fire Suppression...10 Lighting Requirements for Equipment Servicing 10 Cabinet Recommendations...10 Working Space for Server Access 10 Power Consumption...10 Electrical Load Requirements (Circuit Breaker Sizing 11 Power Quality...11 Sources of Voltage Fluctuations 11 Power System Protection...11 Distribution Hardware...12 Wire Selection...12 Raceway Systems (Electrical...
......8 Comprehensive Discussion...9 Computer Room Safety...9 Fire Protection...9 Fire Suppression...10 Lighting Requirements for Equipment Servicing 10 Cabinet Recommendations...10 Working Space for Server Access 10 Power Consumption...10 Electrical Load Requirements (Circuit Breaker Sizing 11 Power Quality...11 Sources of Voltage Fluctuations 11 Power System Protection...11 Distribution Hardware...12 Wire Selection...12 Raceway Systems (Electrical...
Generic Site Preparation Guide, Third Edition
Page 4
Basic Air-Conditioning Equipment Requirements 20 Air-Conditioning System Guidelines 20 Air-Conditioning System Types 20 Basic Air-Distribution Systems 21 Air-Conditioning System Installation 21 Air-Conditioning Ducts...... Loading Terms...23 Raised Floor Loading...24 Average Floor Loading...24 Typical Raised Floor Site...24 Windows...25 Space Requirements...25 Delivery Space Requirements...25 Operational Space Requirements...25 Floor Plan Grid...26 Power Plug Configuration...26 Conversion Factors and Formulas...29 Example of an Installation Schedule...30 Sample Site Inspection Checklist...30...
Basic Air-Conditioning Equipment Requirements 20 Air-Conditioning System Guidelines 20 Air-Conditioning System Types 20 Basic Air-Distribution Systems 21 Air-Conditioning System Installation 21 Air-Conditioning Ducts...... Loading Terms...23 Raised Floor Loading...24 Average Floor Loading...24 Typical Raised Floor Site...24 Windows...25 Space Requirements...25 Delivery Space Requirements...25 Operational Space Requirements...25 Floor Plan Grid...26 Power Plug Configuration...26 Conversion Factors and Formulas...29 Example of an Installation Schedule...30 Sample Site Inspection Checklist...30...
Generic Site Preparation Guide, Third Edition
Page 7
... for maximum load. • The distance from a receptacle to power source X0 is rated for the guidelines required to support the specific server. The following information provides general principles and practices to consider before installing or operating an HP high-end or mid-range server system. These guidelines apply to all customer environments that distribution...
... for maximum load. • The distance from a receptacle to power source X0 is rated for the guidelines required to support the specific server. The following information provides general principles and practices to consider before installing or operating an HP high-end or mid-range server system. These guidelines apply to all customer environments that distribution...
Generic Site Preparation Guide, Third Edition
Page 8
...and other alternatives for critical systems and applications demanding high availability. In determining the power requirements: • Size electrical infrastructure for maximum equipment availability and use a 2-foot by...Grounding Systems WARNING! HP computer hardware has been tested only on systems where protective earth is on raised flooring, use . Power Consumption Safety and regulatory... server, depending on computer equipment list the ratings for a nonlinear load. For example, if the marked electrical voltage is better to the AC distribution point. Use uninterruptible power ...
...and other alternatives for critical systems and applications demanding high availability. In determining the power requirements: • Size electrical infrastructure for maximum equipment availability and use a 2-foot by...Grounding Systems WARNING! HP computer hardware has been tested only on systems where protective earth is on raised flooring, use . Power Consumption Safety and regulatory... server, depending on computer equipment list the ratings for a nonlinear load. For example, if the marked electrical voltage is better to the AC distribution point. Use uninterruptible power ...
Generic Site Preparation Guide, Third Edition
Page 9
...stripe, is beyond the scope of this section: • Computer room safety • Power consumption • Electrical load requirements (circuit breaker sizing) • Power quality • Distribution hardware • System installation guidelines Computer Room Safety WARNING! Failure ... on North American practices. The proper design and installation of a server power distribution system requires specialized skills. A good design, when coupled with a yellow stripe. A detailed discussion of power distribution system design and installation is a European Union (EU) directive...
...stripe, is beyond the scope of this section: • Computer room safety • Power consumption • Electrical load requirements (circuit breaker sizing) • Power quality • Distribution hardware • System installation guidelines Computer Room Safety WARNING! Failure ... on North American practices. The proper design and installation of a server power distribution system requires specialized skills. A good design, when coupled with a yellow stripe. A detailed discussion of power distribution system design and installation is a European Union (EU) directive...
Generic Site Preparation Guide, Third Edition
Page 10
Fire Suppression Though fires in a computer room reduce the possibility of the server. For example, adequate lighting reduces the chances of , or behind the server. Working Space for such devices to determine the power required to the server will be divided into two broad categories: • Marked electrical amperage, which is also more ...water valving lowers the business risks associated with suitably rated temperature heads. Use gaseous agents as a backup system. Use this amperage to the HP server hardware, you must permit at least a 90-degree opening of the world.
Fire Suppression Though fires in a computer room reduce the possibility of the server. For example, adequate lighting reduces the chances of , or behind the server. Working Space for such devices to determine the power required to the server will be divided into two broad categories: • Marked electrical amperage, which is also more ...water valving lowers the business risks associated with suitably rated temperature heads. Use gaseous agents as a backup system. Use this amperage to the HP server hardware, you must permit at least a 90-degree opening of the world.
Generic Site Preparation Guide, Third Edition
Page 11
... disturbances can occur if these electrical disturbances by using: • A dedicated power distribution system • Power-conditioning equipment • Over- Power Quality HP servers operate over a wide range of the equipment. Sources of Voltage Fluctuations Voltage ...HP Corporate Power Standard HP-00005-03 at http://standards.corp.hp.com/smc/hpstd/pdf/F-HP0000503.pdf.) The servers are common. Common sources of these devices are exceeded. Electrical Factors 11 NOTE: Peripheral equipment should be considered if outages of one cycle. Electrical Load Requirements...
... disturbances can occur if these electrical disturbances by using: • A dedicated power distribution system • Power-conditioning equipment • Over- Power Quality HP servers operate over a wide range of the equipment. Sources of Voltage Fluctuations Voltage ...HP Corporate Power Standard HP-00005-03 at http://standards.corp.hp.com/smc/hpstd/pdf/F-HP0000503.pdf.) The servers are common. Common sources of these devices are exceeded. Electrical Factors 11 NOTE: Peripheral equipment should be considered if outages of one cycle. Electrical Load Requirements...
Generic Site Preparation Guide, Third Edition
Page 12
...) (LAHJ) Raceways form part of grounding: • Power distribution safety • High-frequency intercabinet Power Distribution Safety Grounding (LAHJ) The power distribution safety grounding system connects various points in power hardware. A server requires two methods of the protective ground path for connection to...Preparation Guidelines Refer to provide ground continuity). Grounding Systems HP systems are shorted together at the X0 bonding junction on the secondary side of raceways (electrical conduits) used in the power distribution system to work loose, overheat, and fail...
...) (LAHJ) Raceways form part of grounding: • Power distribution safety • High-frequency intercabinet Power Distribution Safety Grounding (LAHJ) The power distribution safety grounding system connects various points in power hardware. A server requires two methods of the protective ground path for connection to...Preparation Guidelines Refer to provide ground continuity). Grounding Systems HP systems are shorted together at the X0 bonding junction on the secondary side of raceways (electrical conduits) used in the power distribution system to work loose, overheat, and fail...
Generic Site Preparation Guide, Third Edition
Page 15
...proper connection torque values for installation procedures. Data Communications Cables Power transformers create high-energy fields in the form of an electrical connection depends on a conductive, nonpainted surface. HP recommends putting appropriate effort into maximizing electrical and air-conditioning ...force applied. Wiring Connections Expansion and contraction rates vary among different metals. CAUTION: Connections that meet business needs. HP does not require this step. Check that the braid contact on investment by making a system more stable and by your wire manufacturer...
...proper connection torque values for installation procedures. Data Communications Cables Power transformers create high-energy fields in the form of an electrical connection depends on a conductive, nonpainted surface. HP recommends putting appropriate effort into maximizing electrical and air-conditioning ...force applied. Wiring Connections Expansion and contraction rates vary among different metals. CAUTION: Connections that meet business needs. HP does not require this step. Check that the braid contact on investment by making a system more stable and by your wire manufacturer...
Generic Site Preparation Guide, Third Edition
Page 17
... HP recommends building this consideration into your designs for a server: • Locate the computer room away from the exterior walls of the server cabinet to decrease. Cellular Telephone and Wireless Usage HP ...be damaged or upset by the human body can affect a server installation: • Computer room preparation • Airflow • Cooling requirements • Humidity level • ESD prevention • ...foot (61-cm by 61-cm) grounding grid. • Always use appropriately sized AC power ground wires. • Limit personnel traffic to two floor tiles away from the top of...
... HP recommends building this consideration into your designs for a server: • Locate the computer room away from the exterior walls of the server cabinet to decrease. Cellular Telephone and Wireless Usage HP ...be damaged or upset by the human body can affect a server installation: • Computer room preparation • Airflow • Cooling requirements • Humidity level • ESD prevention • ...foot (61-cm by 61-cm) grounding grid. • Always use appropriately sized AC power ground wires. • Limit personnel traffic to two floor tiles away from the top of...
Generic Site Preparation Guide, Third Edition
Page 26
... 90 NA 28 NA Special (or Contract) Product specifications controlled by contract or other changes in space requirements to the space plan and create an equipment layout plan which power cable ships with HP servers. Specific media requirements may vary. 6 Equipment design extremes as measured at the equipment inlet. 7 Target facility design and operational range...
... 90 NA 28 NA Special (or Contract) Product specifications controlled by contract or other changes in space requirements to the space plan and create an equipment layout plan which power cable ships with HP servers. Specific media requirements may vary. 6 Equipment design extremes as measured at the equipment inlet. 7 Target facility design and operational range...
Generic Site Preparation Guide, Third Edition
Page 29
... to ease data calculation when planning for site planning. The following list includes the conversion factors used to supply power to the server. Conversion Factors • Refrigeration - 1 watt = 0.86 kcal/hour - 1 watt = 3.412 Btu/hour - 1 watt = 2.843 × 10-4 tons - ...meter = 3.28 foot - 1 meter = 1.09 yards - 1 in determining those calculations required for systems that might be helpful in . = 2.54 centimeters Conversion Factors and Formulas 29 Figure 1-12 L6-20 Power Cable Conversion Factors and Formulas The conversion factors provided in this guide. Figure 1-12 (page 29...
... to ease data calculation when planning for site planning. The following list includes the conversion factors used to supply power to the server. Conversion Factors • Refrigeration - 1 watt = 0.86 kcal/hour - 1 watt = 3.412 Btu/hour - 1 watt = 2.843 × 10-4 tons - ...meter = 3.28 foot - 1 meter = 1.09 yards - 1 in determining those calculations required for systems that might be helpful in . = 2.54 centimeters Conversion Factors and Formulas 29 Figure 1-12 L6-20 Power Cable Conversion Factors and Formulas The conversion factors provided in this guide. Figure 1-12 (page 29...
Generic Site Preparation Guide, Third Edition
Page 37
When the power requirement of amperage and voltage. watt A unit of electricity consumption representing the product of a product is listed in watts, you can convert to amperes (A) by dividing the wattage by the voltage. (For example, 1,200 W divided by 120 V equals 10 A.) 37
When the power requirement of amperage and voltage. watt A unit of electricity consumption representing the product of a product is listed in watts, you can convert to amperes (A) by dividing the wattage by the voltage. (For example, 1,200 W divided by 120 V equals 10 A.) 37
Site Preparation Guide, Second Edition - hp rp7405/rp7410 Servers
Page 23
...-20, 240 volt International-Europe International China Continental Europe Israel North America/Japan System Power Specifications Table 1-4 and Table 1-5 list the AC power requirements for hp rp7405/rp7410 servers. System Specifications Electrical Specifications Electrical Specifications This section provides electrical specifications for the server. These tables provide information to the building installation earth or, if supplied by a separately...
...-20, 240 volt International-Europe International China Continental Europe Israel North America/Japan System Power Specifications Table 1-4 and Table 1-5 list the AC power requirements for hp rp7405/rp7410 servers. System Specifications Electrical Specifications Electrical Specifications This section provides electrical specifications for the server. These tables provide information to the building installation earth or, if supplied by a separately...
Site Preparation Guide, Second Edition - hp rp7405/rp7410 Servers
Page 24
System Specifications Electrical Specifications Table 1-4 AC Power Specifications (Continued) Requirements Minimum Operating Voltage Maximum Operating Voltage Frequency range (minimum maximum) Number of phases Rated line current Maximum inrush current Dropout carry-through time at minimum line voltage Circuit breaker rating Branch Circuit Breaker (Size, Type) Power factor correction Value 180 VAC 269 VAC 50 - 60 (Hz) 1 12 A rms 30 A peak for 15 ms 20 ms 20 A 20A, slow trip delay type >0.97 @269VAC >0.93 @262VAC Ground leakage current (mA) kVA rating
System Specifications Electrical Specifications Table 1-4 AC Power Specifications (Continued) Requirements Minimum Operating Voltage Maximum Operating Voltage Frequency range (minimum maximum) Number of phases Rated line current Maximum inrush current Dropout carry-through time at minimum line voltage Circuit breaker rating Branch Circuit Breaker (Size, Type) Power factor correction Value 180 VAC 269 VAC 50 - 60 (Hz) 1 12 A rms 30 A peak for 15 ms 20 ms 20 A 20A, slow trip delay type >0.97 @269VAC >0.93 @262VAC Ground leakage current (mA) kVA rating
Site Preparation Guide, Second Edition - hp rp7405/rp7410 Servers
Page 62
...power requirements you must consider any peripheral equipment that is required to determine the power and air-conditioning that will be installed during initial installation or as a later update. Refer to the applicable documentation for such devices to support these devices. 42 Appendix A System Requirements Summary Power Consumption and Air Conditioning Power... Consumption and Air Conditioning To determine the power consumed and the air conditioning required, follow the examples in Table ...
...power requirements you must consider any peripheral equipment that is required to determine the power and air-conditioning that will be installed during initial installation or as a later update. Refer to the applicable documentation for such devices to support these devices. 42 Appendix A System Requirements Summary Power Consumption and Air Conditioning Power... Consumption and Air Conditioning To determine the power consumed and the air conditioning required, follow the examples in Table ...
User Guide, Third Edition - hp rp7405/rp7410 Servers
Page 7
.../rp7410 Field Replaceable Unit (FRU) List 90 Table B-1. hp rp7405/rp7410 Component Weights 94 Table B-3. Typical hp rp7405/rp7410 Configurations 98 Table C-1. Rear Smart Fan Assembly LED Indications 71 Table 4-3. Tables Table 1. hp rp7405/rp7410 DIMMs 9 Table 1-4. hp rp7405/rp7410 DIMMs 32 Table 3-1. PCI Power Supply LEDs 52 Table 3-4. PCI Power Module LED Indications 77 Table A-1. AC Power Specifications 96 Table B-5. System Power Requirements...
.../rp7410 Field Replaceable Unit (FRU) List 90 Table B-1. hp rp7405/rp7410 Component Weights 94 Table B-3. Typical hp rp7405/rp7410 Configurations 98 Table C-1. Rear Smart Fan Assembly LED Indications 71 Table 4-3. Tables Table 1. hp rp7405/rp7410 DIMMs 9 Table 1-4. hp rp7405/rp7410 DIMMs 32 Table 3-1. PCI Power Supply LEDs 52 Table 3-4. PCI Power Module LED Indications 77 Table A-1. AC Power Specifications 96 Table B-5. System Power Requirements...
User Guide, Third Edition - hp rp7405/rp7410 Servers
Page 118
... Requirements Nominal input voltage Minimum Operating Voltage Maximum Operating Voltage Frequency range (minimum maximum) Number of AC power needed for 15 ms 20 ms Per line cord 20 A 20A, slow trip delay type >0.97 @269VAC >0.93 @262VAC System Specifications Electrical Specifications System Power Specifications Table B-4 and Table B-5 list the AC power requirements for an hp rp7405/rp7410 server...
... Requirements Nominal input voltage Minimum Operating Voltage Maximum Operating Voltage Frequency range (minimum maximum) Number of AC power needed for 15 ms 20 ms Per line cord 20 A 20A, slow trip delay type >0.97 @269VAC >0.93 @262VAC System Specifications Electrical Specifications System Power Specifications Table B-4 and Table B-5 list the AC power requirements for an hp rp7405/rp7410 server...
User Guide, Third Edition - hp rp7405/rp7410 Servers
Page 145
...84 PCI, 2, 4, 11, 13, 79 system, 4, 8, 11, 12, 13, 15, 59, 91, 94, 97 basic air conditioning equipment requirements, 110 basic air distribution systems, 111 booting HP-UX, 47 BPS (Bulk Power Supply), 39 C cable management arm, 29 cell board, 3, 4, 7, 9, 11, 12, 15, 16, 26, 30, 32, 37, 42,...di (Display), 45 du (display MP bus topology), 42 lc (LAN configuration), 41 ls (LAN status), 41 vfp (Virtual Front Panel), 44 component power requirements, 96 computer room safety fire protection, 116 configuring LAN information, 40 connecting AC, 34 cooling, 97 D data communications cables, 109 di (Display) ...
...84 PCI, 2, 4, 11, 13, 79 system, 4, 8, 11, 12, 13, 15, 59, 91, 94, 97 basic air conditioning equipment requirements, 110 basic air distribution systems, 111 booting HP-UX, 47 BPS (Bulk Power Supply), 39 C cable management arm, 29 cell board, 3, 4, 7, 9, 11, 12, 15, 16, 26, 30, 32, 37, 42,...di (Display), 45 du (display MP bus topology), 42 lc (LAN configuration), 41 ls (LAN status), 41 vfp (Virtual Front Panel), 44 component power requirements, 96 computer room safety fire protection, 116 configuring LAN information, 40 connecting AC, 34 cooling, 97 D data communications cables, 109 di (Display) ...
User Guide, Third Edition - hp rp7405/rp7410 Servers
Page 146
..., 4, 11, 12 installing server into the rack, 28 IP address default, 40 lc Comand Screen, 41 K Keystone system air ducts, 99 environmental elements, 110 power system protection, 104 L LAN status, 41 lc (LAN configuration) command, 41 LED Attention, 39 Bulk Power Supply, 39 SP Active, 39 Standby Power Good, 39 lighting requirements, 116 login name...
..., 4, 11, 12 installing server into the rack, 28 IP address default, 40 lc Comand Screen, 41 K Keystone system air ducts, 99 environmental elements, 110 power system protection, 104 L LAN status, 41 lc (LAN configuration) command, 41 LED Attention, 39 Bulk Power Supply, 39 SP Active, 39 Standby Power Good, 39 lighting requirements, 116 login name...