HP BladeSystem c-Class Site Planning Guide
Page 9
...air conditioning equipment for the computer room. For example, a person dissipates about 450 BTU/h while performing a typical computer room task. Air conditioning system guidelines HP recommends the following guidelines when designing a computer room air conditioning system and selecting the ... Specify air conditioning equipment air filters with remote air cooled chilling plant General site preparation guidelines 9 Air conditioning system types HP recommends the following : o A redundant air conditioning system o Sufficient extra cooling capacity to ensure availability of the computer ...
...air conditioning equipment for the computer room. For example, a person dissipates about 450 BTU/h while performing a typical computer room task. Air conditioning system guidelines HP recommends the following guidelines when designing a computer room air conditioning system and selecting the ... Specify air conditioning equipment air filters with remote air cooled chilling plant General site preparation guidelines 9 Air conditioning system types HP recommends the following : o A redundant air conditioning system o Sufficient extra cooling capacity to ensure availability of the computer ...
HP BladeSystem c-Class Site Planning Guide
Page 54
...Example configurations The following configuration: • HP BladeSystem c7000 enclosure (1) • Ethernet Pass-Through Modules for HP BladeSystem (2) • HP ProLiant BL460c Server Blades (2) o 2.33-GHz Intel® Xeon™ processor 5148, dual-core (2 per server blade) o 4GB (4 x 1GB) RAM per server blade o 36GB 10,000-... airflow (CFM) Total airflow (CMM) Idle 601 W 613 VA 2049 BTU 2.95 A 116 3.280 100% utilization 764 W 779 VA 2604 BTU 3.75 A 131 3.713 Circuit sizing 1109 W 1132 VA 3781 BTU 5.44 A 156 4.429 Example typical configuration This power summary is designed for...
...Example configurations The following configuration: • HP BladeSystem c7000 enclosure (1) • Ethernet Pass-Through Modules for HP BladeSystem (2) • HP ProLiant BL460c Server Blades (2) o 2.33-GHz Intel® Xeon™ processor 5148, dual-core (2 per server blade) o 4GB (4 x 1GB) RAM per server blade o 36GB 10,000-... airflow (CFM) Total airflow (CMM) Idle 601 W 613 VA 2049 BTU 2.95 A 116 3.280 100% utilization 764 W 779 VA 2604 BTU 3.75 A 131 3.713 Circuit sizing 1109 W 1132 VA 3781 BTU 5.44 A 156 4.429 Example typical configuration This power summary is designed for...
HP BladeSystem c-Class Site Planning Guide
Page 55
... 6244 W 6372 VA 21293 BTU 30.63 A 516 14.611 Example maximum configuration This power summary is based on the following configuration: • HP BladeSystem c7000 Enclosure (1) • HP Virtual Connect Ethernet Modules (2) • HP Virtual Connect Fibre Channel Modules (2) • HP 4X DDR InfiniBand Switch Module for HP c-Class BladeSystem (1) • HP ProLiant BL460 Server Blades (16...
... 6244 W 6372 VA 21293 BTU 30.63 A 516 14.611 Example maximum configuration This power summary is based on the following configuration: • HP BladeSystem c7000 Enclosure (1) • HP Virtual Connect Ethernet Modules (2) • HP Virtual Connect Fibre Channel Modules (2) • HP 4X DDR InfiniBand Switch Module for HP c-Class BladeSystem (1) • HP ProLiant BL460 Server Blades (16...
HP BladeSystem c-Class Site Planning Guide
Page 56
... other models, obtain the power consumption data from a component's specifications. For more information, see the following worksheet and use per hour (BTU/h). For more information, contact your HP sales representative. Using modern day kW/cabinet to properly support the added electrical and cooling requirements. Modern blade systems should budget at maximum configuration...
... other models, obtain the power consumption data from a component's specifications. For more information, see the following worksheet and use per hour (BTU/h). For more information, contact your HP sales representative. Using modern day kW/cabinet to properly support the added electrical and cooling requirements. Modern blade systems should budget at maximum configuration...
HP BladeSystem c-Class Site Planning Guide
Page 66
... for site planning: • kVA = voltage x Current (amps) • Watts = VA x PF • BTU = Watts x 3.41 Conversion factors and formulas 66 Conversion factors and formulas Conversion factors The conversion factors provided here are ... to the specific configurations listed in determining conversion factors required for site planning. • Refrigeration o 1 watt = 0.86 kcal/h o 1 watt = 3.412 BTU/h o 1 watt = 2.843 x 10-4 tons o 1 ton = 200 BTU/min o 1 ton = 12,000 BTU/h o 1 ton = 3517.2 W • Equivalents o 1 centimeter = 0.3937 in o 1 meter = 3.28 ft o 1 meter = 1.09 yards o ...
... for site planning: • kVA = voltage x Current (amps) • Watts = VA x PF • BTU = Watts x 3.41 Conversion factors and formulas 66 Conversion factors and formulas Conversion factors The conversion factors provided here are ... to the specific configurations listed in determining conversion factors required for site planning. • Refrigeration o 1 watt = 0.86 kcal/h o 1 watt = 3.412 BTU/h o 1 watt = 2.843 x 10-4 tons o 1 ton = 200 BTU/min o 1 ton = 12,000 BTU/h o 1 ton = 3517.2 W • Equivalents o 1 centimeter = 0.3937 in o 1 meter = 3.28 ft o 1 meter = 1.09 yards o ...