EMC PowerSwitch S5200F-ON Series Setup Guide
Page 3
...8 Unpack...8 Ground cable...9 Rack or cabinet installation...9 One-half U front-rack installation...10 One-half U switch installation...11 One-half U switch removal...12 One U ReadyRails installation...12 1U Tool-less mount installation...13 Two-post flush-mount installation...14 Two...threaded installation...15 S5200F-ON Series switch installation...16 Two U four-post rack assembly...18 Four-post rack mount...18 DC power connections...19 S5212F-ON only DC power connections...21 Optics installation...22 Optics removal...22 Switch start up...22 After switch installation...22 4 Specifications...23 ...
...8 Unpack...8 Ground cable...9 Rack or cabinet installation...9 One-half U front-rack installation...10 One-half U switch installation...11 One-half U switch removal...12 One U ReadyRails installation...12 1U Tool-less mount installation...13 Two-post flush-mount installation...14 Two...threaded installation...15 S5200F-ON Series switch installation...16 Two U four-post rack assembly...18 Four-post rack mount...18 DC power connections...19 S5212F-ON only DC power connections...21 Optics installation...22 Optics removal...22 Switch start up...22 After switch installation...22 4 Specifications...23 ...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 4
... about the S5200F-ON Series (S5232F-ON, S5248F-ON, S5296F-ON, S5224F-ON, and S5212F-ON) switches, see the following documents. • Dell EMC SmartFabric OS10 Release Notes • Dell EMC SmartFabric OS10 User Guide • Delll EMC PowerSwitch S5200F-ON Series Installation Guide •...this guide This guide provides site preparation recommendations, step-by the regulatory model E26W and the regulatory type E26W001. • Marketing model S5212F-ON is connected, visible and invisible laser radiation may be emitted from the aperture of Class 1 laser radiation. NOTE: This equipment...
... about the S5200F-ON Series (S5232F-ON, S5248F-ON, S5296F-ON, S5224F-ON, and S5212F-ON) switches, see the following documents. • Dell EMC SmartFabric OS10 Release Notes • Dell EMC SmartFabric OS10 User Guide • Delll EMC PowerSwitch S5200F-ON Series Installation Guide •...this guide This guide provides site preparation recommendations, step-by the regulatory model E26W and the regulatory type E26W001. • Marketing model S5212F-ON is connected, visible and invisible laser radiation may be emitted from the aperture of Class 1 laser radiation. NOTE: This equipment...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 6
... facilities • Data centers • Other locations where the National Electric Code (NEC) applies For more information about the S5200F-ON Series switch specifications, see Specifications. Airflow must be permanent. 6 Site preparations Ensure that the rack is grounded. 2 Site preparations The 5200F-ON Series ...(S5232F-ON, S5248F-ON, S5296F-ON, S5224F-ON, and S5212F-ON) switch is suitable for the location controls access to the restricted area. You can only gain access using a special tool, lock, key, ...
... facilities • Data centers • Other locations where the National Electric Code (NEC) applies For more information about the S5200F-ON Series switch specifications, see Specifications. Airflow must be permanent. 6 Site preparations Ensure that the rack is grounded. 2 Site preparations The 5200F-ON Series ...(S5232F-ON, S5248F-ON, S5296F-ON, S5224F-ON, and S5212F-ON) switch is suitable for the location controls access to the restricted area. You can only gain access using a special tool, lock, key, ...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 7
... accessible. Use the S5200F-ON Series switch in a single switch. Use a single type of the National Electrical Code ANSI/NFPA 70, where applicable. NOTE: Module power is connected between the switch and the power source. Switch ground Dell EMC recommends grounding your site's ventilation.... For proper ventilation, position the switch in a plastic bag placed with fan airflow from the I /O-reverse Be...
... accessible. Use the S5200F-ON Series switch in a single switch. Use a single type of the National Electrical Code ANSI/NFPA 70, where applicable. NOTE: Module power is connected between the switch and the power source. Switch ground Dell EMC recommends grounding your site's ventilation.... For proper ventilation, position the switch in a plastic bag placed with fan airflow from the I /O-reverse Be...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 8
... fan units • S5296F-ON: one USB extension cable; Remove all straps securing the container. 2. NOTE: For the S5212F-ON and S5296F-ON switches only: the USB extension cable is packaged separately. Topics: • Unpack • Ground cable • Rack or cabinet...8226; One U ReadyRails installation • Two U four-post rack assembly • DC power connections • S5212F-ON only DC power connections • Optics installation • Switch start up Guide • Safety and Regulatory Information • Warranty and Support Information 1. Place the container on...
... fan units • S5296F-ON: one USB extension cable; Remove all straps securing the container. 2. NOTE: For the S5212F-ON and S5296F-ON switches only: the USB extension cable is packaged separately. Topics: • Unpack • Ground cable • Rack or cabinet...8226; One U ReadyRails installation • Two U four-post rack assembly • DC power connections • S5212F-ON only DC power connections • Optics installation • Switch start up Guide • Safety and Regulatory Information • Warranty and Support Information 1. Place the container on...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 9
... loading of racks may be made of the AC power cable provides a ground path, Dell EMC recommends grounding your switch is provided for the S5296F-ON or S5212F-ON switches. NOTE: For an AC-powered switch, although the third conductor of copper. Also, bring any unplated mating surfaces to a...by sliding the inside the pre-installed ground lug. 3. The cable length must be greater than the room ambient temperature. For the S5212F-ON switch, see Two U four-post rack assembly. The rack installation ears are fire and shock hazards. • Elevated ambient temperature-If you...
... loading of racks may be made of the AC power cable provides a ground path, Dell EMC recommends grounding your switch is provided for the S5296F-ON or S5212F-ON switches. NOTE: For an AC-powered switch, although the third conductor of copper. Also, bring any unplated mating surfaces to a...by sliding the inside the pre-installed ground lug. 3. The cable length must be greater than the room ambient temperature. For the S5212F-ON switch, see Two U four-post rack assembly. The rack installation ears are fire and shock hazards. • Elevated ambient temperature-If you...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 10
... equipment in a two-post rack. 1. Attach the rail to the four-post rack from the shipping packaging and place them on the inner switch rail with the fan panel facing in the downward position. You must supply eight rackmount screws for safe operation of the equipment. One-half U... front-rack installation Install the S5212F-ON switch using two user-supplied screws for example: use of airflow surrounding it locks into place. 4. To install the one-half U switch: • Attach the rails to the dual tray. • Install the dual ...
... equipment in a two-post rack. 1. Attach the rail to the four-post rack from the shipping packaging and place them on the inner switch rail with the fan panel facing in the downward position. You must supply eight rackmount screws for safe operation of the equipment. One-half U... front-rack installation Install the S5212F-ON switch using two user-supplied screws for example: use of airflow surrounding it locks into place. 4. To install the one-half U switch: • Attach the rails to the dual tray. • Install the dual ...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 11
...8. Tighten all mounting screws to securely mount the dual tray into place. Install one or two half-U switches in the four-post rack One-half U switch installation Install one -half U switch The switch is fully inserted when it presses the stop feature on the dual tray. Figure 5. Figure 7. Attach the... dual-tray rear to the rack using two user-supplied screws for each rack post. Figure 4. The front switch latch snaps the switch into the four-post rack. Secure the dual-tray in the four-post rack-mounted dual tray. 1. Figure 6. S5200F-ON Series...
...8. Tighten all mounting screws to securely mount the dual tray into place. Install one or two half-U switches in the four-post rack One-half U switch installation Install one -half U switch The switch is fully inserted when it presses the stop feature on the dual tray. Figure 5. Figure 7. Attach the... dual-tray rear to the rack using two user-supplied screws for each rack post. Figure 4. The front switch latch snaps the switch into the four-post rack. Secure the dual-tray in the four-post rack-mounted dual tray. 1. Figure 6. S5200F-ON Series...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 12
...To install the S5212F-ON switch, see One U ReadyRails installation. One-half U switch removal Remove the S5212F-ON switch from the dual tray from the front of the outside rail. 12 S5200F-ON Series switch Installation Dual-tray stop feature 2. NOTE: To remove the S5232F-ON, S5248F-ON, or S5224F-ON switch, see One-...system using the 1U tool-less square-hole method or one of three possible 1U threaded round-hole methods. To remove the S5296F-ON switch, see Two U four-post rack assembly. The tooled installation methods include two-post flush mount, two-post center mount, or four-...
...To install the S5212F-ON switch, see One U ReadyRails installation. One-half U switch removal Remove the S5212F-ON switch from the dual tray from the front of the outside rail. 12 S5200F-ON Series switch Installation Dual-tray stop feature 2. NOTE: To remove the S5232F-ON, S5248F-ON, or S5224F-ON switch, see One-...system using the 1U tool-less square-hole method or one of three possible 1U threaded round-hole methods. To remove the S5296F-ON switch, see Two U four-post rack assembly. The tooled installation methods include two-post flush mount, two-post center mount, or four-...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 13
... round holes. The center extractions show how the pegs appear in the back vertical post flange. Figure 12. 1U tool-less installation S5200F-ON Series switch Installation 13 NOTE: For more installation instructions, see the installation labels attached to the rail assembly. 1. Figure 11. Place one rail between the left and...
... round holes. The center extractions show how the pegs appear in the back vertical post flange. Figure 12. 1U tool-less installation S5200F-ON Series switch Installation 13 NOTE: For more installation instructions, see the installation labels attached to the rail assembly. 1. Figure 11. Place one rail between the left and...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 14
...more installation instructions, see the installation labels attached to the front post flange with two user-supplied screws, item 1. 14 S5200F-ON Series switch Installation Retain the latch castings for the second rail. Repeat this procedure for the second rail. NOTE: Be sure that the rails click ...the front post flange with two user-supplied screws, item 2. 3. For this configuration, remove the latch castings from each front flange ear on the switch side of each latch casting, use a Torx screwdriver. It is not necessary to the post flange with two user-supplied screws, item 3. 4....
...more installation instructions, see the installation labels attached to the front post flange with two user-supplied screws, item 1. 14 S5200F-ON Series switch Installation Retain the latch castings for the second rail. Repeat this procedure for the second rail. NOTE: Be sure that the rails click ...the front post flange with two user-supplied screws, item 2. 3. For this configuration, remove the latch castings from each front flange ear on the switch side of each latch casting, use a Torx screwdriver. It is not necessary to the post flange with two user-supplied screws, item 3. 4....
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 15
.... Two-post center-mount installation 2. Secure it to the rail assembly. 1. To remove the two screws each end of the ReadyRails assemblies. S5200F-ON Series switch Installation 15 Slide the back bracket towards the post. Four-post threaded installation NOTE: For more installation instructions, see the installation labels attached to the...
.... Two-post center-mount installation 2. Secure it to the rail assembly. 1. To remove the two screws each end of the ReadyRails assemblies. S5200F-ON Series switch Installation 15 Slide the back bracket towards the post. Four-post threaded installation NOTE: For more installation instructions, see the installation labels attached to the...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 16
... flanges with the mounting heads and attach the rail to the chassis. NOTE: For more information, see One-half U switch installation. 1U front-rack installation Configure the rails that are attached to the S5200F-ON Series switch. For the S5212F-ON switch installation, see the installation instruction labels on the rail. S5200F-ON Series...
... flanges with the mounting heads and attach the rail to the chassis. NOTE: For more information, see One-half U switch installation. 1U front-rack installation Configure the rails that are attached to the S5200F-ON Series switch. For the S5212F-ON switch installation, see the installation instruction labels on the rail. S5200F-ON Series...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 17
About three inches before you install both rails, line them up on the ReadyRails. S5200F-ON Series switch Installation 17 Front rack installation NOTE: Do not the use the mounted Ready-Rails as a shelf or a workplace. Figure 17. After you fully insert your switch, the rail locking feature engages to keep the switch from inadvertently sliding out and falling. Slide the switch in until it is flush with the front of rack. Figure 16. Switch rail attachment 2.
About three inches before you install both rails, line them up on the ReadyRails. S5200F-ON Series switch Installation 17 Front rack installation NOTE: Do not the use the mounted Ready-Rails as a shelf or a workplace. Figure 17. After you fully insert your switch, the rail locking feature engages to keep the switch from inadvertently sliding out and falling. Slide the switch in until it is flush with the front of rack. Figure 16. Switch rail attachment 2.
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 18
... downward position. Align the chassis with the fan panel facing in the rack so that the chassis remains stable. NOTE: To install the S5212F-ON, see One U ReadyRails installation. In a four-post rack, the maximum distance between the front and back vertical posts is 24...If your Safety, Environmental, and Regulatory information booklet before mounting or servicing the unit in this document are not intended to represent a specific switch. • Rack loading-Overloading or uneven loading of airflow needed for example; Lift the chassis only from each side of rack-mounted ...
... downward position. Align the chassis with the fan panel facing in the rack so that the chassis remains stable. NOTE: To install the S5212F-ON, see One U ReadyRails installation. In a four-post rack, the maximum distance between the front and back vertical posts is 24...If your Safety, Environmental, and Regulatory information booklet before mounting or servicing the unit in this document are not intended to represent a specific switch. • Rack loading-Overloading or uneven loading of airflow needed for example; Lift the chassis only from each side of rack-mounted ...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 19
Extra screws to the S5212F-ON switch, see S5212F-ON only DC power connections. S5296F-ON installation 1. Each DC powered system comes with a set is provided for the S5212F-ON switch. Main screw DC power connections NOTE: Use the following instructions for all S5200F-ON Series switches except for each DC PSU. One set containing a prewired (3-inch 8AWG) power supply connector and a four-screw wiring block. Figure 18. To connect DC power to restrict front-back movement of the switch. 2. S5200F-ON Series switch Installation 19
Extra screws to the S5212F-ON switch, see S5212F-ON only DC power connections. S5296F-ON installation 1. Each DC powered system comes with a set is provided for the S5212F-ON switch. Main screw DC power connections NOTE: Use the following instructions for all S5200F-ON Series switches except for each DC PSU. One set containing a prewired (3-inch 8AWG) power supply connector and a four-screw wiring block. Figure 18. To connect DC power to restrict front-back movement of the switch. 2. S5200F-ON Series switch Installation 19
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 20
... site's DC power source wires to the site's DC power source, follow these steps: 1. Insert the DC power connector into place. 20 S5200F-ON Series switch Installation
... site's DC power source wires to the site's DC power source, follow these steps: 1. Insert the DC power connector into place. 20 S5200F-ON Series switch Installation
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 21
... the power connector's clamps. The blue wire is -48V, the black wire is the positive return, and the yellow/green wire is provided for the S5212F-ON switch only. NOTE: Do not cross the wires. 5. NOTE: Never try to force the power connector into the wiring block.... S5212F-ON only DC power connections NOTE: Use the following instructions for each of the power connector's bare wire lengths into or out of the DC ...
... the power connector's clamps. The blue wire is -48V, the black wire is the positive return, and the yellow/green wire is provided for the S5212F-ON switch only. NOTE: Do not cross the wires. 5. NOTE: Never try to force the power connector into the wiring block.... S5212F-ON only DC power connections NOTE: Use the following instructions for each of the power connector's bare wire lengths into or out of the DC ...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 22
...direct attach cables (DACs) from the port. Switch start up , the fans immediately come on at www.dell.com/support. • If you mount it is sufficient airflow around the unit. • The input circuits are specified for the S5200F-ON Series switch. • There is seated properly. Power up... warning labels and always wear eye protection. NOTE: ESD damage can occur if components are using Dell EMC software, see ONIE documentation at www.onie.org. 22 S5200F-ON Series switch Installation Insert the optic into the port until it is included for the loads and that you ...
...direct attach cables (DACs) from the port. Switch start up , the fans immediately come on at www.dell.com/support. • If you mount it is sufficient airflow around the unit. • The input circuits are specified for the S5200F-ON Series switch. • There is seated properly. Power up... warning labels and always wear eye protection. NOTE: ESD damage can occur if components are using Dell EMC software, see ONIE documentation at www.onie.org. 22 S5200F-ON Series switch Installation Insert the optic into the port until it is included for the loads and that you ...
EMC PowerSwitch S5200F-ON Series Setup Guide
Page 23
...inches (43.6 mm) S5248F-ON: 1.72 inches (43.6 mm) S5296F-ON: 3.42 (87 mm) S5224F-ON: 1.72 inches (43.6 mm) S5212F-ON: 1.72 inches (43.6 mm) S5232F-ON: 17.1 inches (434 mm) S5248F-ON: 17.1 inches (434 mm) S5296F-ON: 16.6 ...lbs (9.7 kg)-PSUs and fans S5296F-ON: 33.3 lbs (15.1 kg)-PSUs and fans S5224F-ON: 21.4 lbs (9.7 kg)-PSUs and fans S5212F-ON: 10.05 lbs (4.5 kg)-PSUs and fans Front: 5 inches (12.7 cm) Back: 5 inches (12.7 cm) Specifications 23 NOTE...the batteries according to the manufacturer's instructions. 4 Specifications This section lists the S5200F-ON Series switch specifications.
...inches (43.6 mm) S5248F-ON: 1.72 inches (43.6 mm) S5296F-ON: 3.42 (87 mm) S5224F-ON: 1.72 inches (43.6 mm) S5212F-ON: 1.72 inches (43.6 mm) S5232F-ON: 17.1 inches (434 mm) S5248F-ON: 17.1 inches (434 mm) S5296F-ON: 16.6 ...lbs (9.7 kg)-PSUs and fans S5296F-ON: 33.3 lbs (15.1 kg)-PSUs and fans S5224F-ON: 21.4 lbs (9.7 kg)-PSUs and fans S5212F-ON: 10.05 lbs (4.5 kg)-PSUs and fans Front: 5 inches (12.7 cm) Back: 5 inches (12.7 cm) Specifications 23 NOTE...the batteries according to the manufacturer's instructions. 4 Specifications This section lists the S5200F-ON Series switch specifications.