LA500 Manual
Page 22
... conduit and secure with watertight connector nut. 4 Reinstall cover. Terminal Block Connector Extension Cable Operator Cable 20 WIRING DUAL GATES ONLY INSTALL THE EXTENSION CABLE AND JUNCTION BOX Before digging, contact local underground utility locating companies. The following items are...junction box installation: • 4 x 4 Junction Box with 3/4" NPT threaded port holes • Screws • PVC Conduit 1 Trench across driveway to cables. 2 Open the junction box by removing screws (4) and set aside. 3 Mount the junction box within 3 feet (0.9 m) of junction box. 3 Secure ...
... conduit and secure with watertight connector nut. 4 Reinstall cover. Terminal Block Connector Extension Cable Operator Cable 20 WIRING DUAL GATES ONLY INSTALL THE EXTENSION CABLE AND JUNCTION BOX Before digging, contact local underground utility locating companies. The following items are...junction box installation: • 4 x 4 Junction Box with 3/4" NPT threaded port holes • Screws • PVC Conduit 1 Trench across driveway to cables. 2 Open the junction box by removing screws (4) and set aside. 3 Mount the junction box within 3 feet (0.9 m) of junction box. 3 Secure ...
LA500 Manual
Page 30
... is closing, the gate will wired to remain open, open /close cycle, like the gate to the SINGLE BUTTON and CTRL PWR inputs. The next command given by a LiftMaster remote control or SINGLE BUTTON on function. The operator does not need to normal operation. The operator arm or gate is low. D. The gate hits the driveway, curb or...
... is closing, the gate will wired to remain open, open /close cycle, like the gate to the SINGLE BUTTON and CTRL PWR inputs. The next command given by a LiftMaster remote control or SINGLE BUTTON on function. The operator does not need to normal operation. The operator arm or gate is low. D. The gate hits the driveway, curb or...