User Guide
Page 7
... using a U.S. Safety notices Safety notices may be installed inside or outside of damage to the possibility of an IT equipment rack. © Copyright IBM Corp. 2010, 2013 v The documentation contains the safety information in your country, safety information documentation is potentially hazardous to people...to a situation that is included in the publications package (such as in their national languages. Laser safety information IBM® servers can be printed throughout this guide: v DANGER notices call attention to a program, device, system, or data. Laser compliance...
... using a U.S. Safety notices Safety notices may be installed inside or outside of damage to the possibility of an IT equipment rack. © Copyright IBM Corp. 2010, 2013 v The documentation contains the safety information in your country, safety information documentation is potentially hazardous to people...to a situation that is included in the publications package (such as in their national languages. Laser safety information IBM® servers can be printed throughout this guide: v DANGER notices call attention to a program, device, system, or data. Laser compliance...
User Guide
Page 9
...uneven mechanical loading, always install the heaviest devices in the rack cabinet when directed to the rating labels located on the rack cabinet. Always install servers and optional devices starting from a device installed in a rack where the air flow is correctly wired and grounded to... power devices installed in a rack where the internal rack ambient temperatures will exceed the manufacturer's...
...uneven mechanical loading, always install the heaviest devices in the rack cabinet when directed to the rating labels located on the rack cabinet. Always install servers and optional devices starting from a device installed in a rack where the air flow is correctly wired and grounded to... power devices installed in a rack where the internal rack ambient temperatures will exceed the manufacturer's...
User Guide
Page 12
... the use as intrabuilding interfaces only (Type 2 or Type 4 ports as instructed by local regulations. x Power Systems: Racks and rack features In the United States, IBM has a process for use of this reason, never look into the end of primary protectors is suitable for the battery...to NEBS (Network Equipment-Building System) GR-1089-CORE: The equipment is not sufficient protection to connect these interfaces metallically to the IBM servers that operate at both ends. These interfaces are suitable for NEBS (Network Equipment-Building System) GR-1089-CORE The following comments ...
... the use as intrabuilding interfaces only (Type 2 or Type 4 ports as instructed by local regulations. x Power Systems: Racks and rack features In the United States, IBM has a process for use of this reason, never look into the end of primary protectors is suitable for the battery...to NEBS (Network Equipment-Building System) GR-1089-CORE: The equipment is not sufficient protection to connect these interfaces metallically to the IBM servers that operate at both ends. These interfaces are suitable for NEBS (Network Equipment-Building System) GR-1089-CORE The following comments ...
User Guide
Page 13
... IBM 42U Slim Rack (7953-94Y). For servers, see model-specific installation topics in Common procedures for servers, expansion units, and disk drive enclosures now provide links to install the 7014-T00 and 7014-T42 racks. Installing the rack Use this information to perform the tasks for the 7014-T00 and 7014-T42 racks and the 7953-94X and 7953-94Y racks. 7014-T00 and 7014-T42 racks...
... IBM 42U Slim Rack (7953-94Y). For servers, see model-specific installation topics in Common procedures for servers, expansion units, and disk drive enclosures now provide links to install the 7014-T00 and 7014-T42 racks. Installing the rack Use this information to perform the tasks for the 7014-T00 and 7014-T42 racks and the 7953-94X and 7953-94Y racks. 7014-T00 and 7014-T42 racks...
User Guide
Page 39
... temperature for all power cords in the bottom of the equipment to the supply circuit so that attach to the rack. CAUTION v Do not install a unit in the same rack cabinet. Always install servers and optional devices starting from a device installed in one drawer at a time. v Consideration should be given to be moved...
... temperature for all power cords in the bottom of the equipment to the supply circuit so that attach to the rack. CAUTION v Do not install a unit in the same rack cabinet. Always install servers and optional devices starting from a device installed in one drawer at a time. v Consideration should be given to be moved...
User Guide
Page 54
...the PDU model. 11. Route the power cord toward the rack side braces. Then, connect the servers or rack PDUs in the rack to secure the power cord along a side brace toward the rear of the rack. 42 Power Systems: Racks and rack features Aligning the connector on page 45 You can monitor the... power status for that the power outlets face the rear of the rack and ...
...the PDU model. 11. Route the power cord toward the rack side braces. Then, connect the servers or rack PDUs in the rack to secure the power cord along a side brace toward the rear of the rack. 42 Power Systems: Racks and rack features Aligning the connector on page 45 You can monitor the... power status for that the power outlets face the rear of the rack and ...
User Guide
Page 57
...toward the rack side braces. Attention: To prevent damage to secure the power cord along a side brace toward the back of the rack flanges. Connect the power cord to the long mounting bracket with cable straps. Setting up power monitoring using the PDU+: You can connect the servers or rack PDUs ...in the rack if the power cord must disconnect the main input power before connecting or disconnecting the input power cord from the PDU model ...
...toward the rack side braces. Attention: To prevent damage to secure the power cord along a side brace toward the back of the rack flanges. Connect the power cord to the long mounting bracket with cable straps. Setting up power monitoring using the PDU+: You can connect the servers or rack PDUs ...in the rack if the power cord must disconnect the main input power before connecting or disconnecting the input power cord from the PDU model ...
User Guide
Page 58
... using numeric commands from a keyboard. Set Trap Receivers Configure remote network management system (NMS) servers to use Telnet or any key. Related tasks: "Installing the PDU or PDU+ in the side of a rack" on page 39 Learn how to install the power distribution unit (PDU) or power distribution ... and trap receivers table. Click OK. 8. Press any other terminal program to configure the PDU+ after the IP address is displayed. 2. Set IBM DPI Control Group Set the administrator user name, password, and access protocols. To start HyperTerminal and communicate with the PDU+ to the RJ-45 ...
... using numeric commands from a keyboard. Set Trap Receivers Configure remote network management system (NMS) servers to use Telnet or any key. Related tasks: "Installing the PDU or PDU+ in the side of a rack" on page 39 Learn how to install the power distribution unit (PDU) or power distribution ... and trap receivers table. Click OK. 8. Press any other terminal program to configure the PDU+ after the IP address is displayed. 2. Set IBM DPI Control Group Set the administrator user name, password, and access protocols. To start HyperTerminal and communicate with the PDU+ to the RJ-45 ...
User Guide
Page 60
... shows the status of the administrator who will use a web browser to configure the PDU+ on the Configuration Utility page. If you with an NTP server. 48 Power Systems: Racks and rack features Click Date and Time to view the PDU+ and Web/SNMP card information.
... shows the status of the administrator who will use a web browser to configure the PDU+ on the Configuration Utility page. If you with an NTP server. 48 Power Systems: Racks and rack features Click Date and Time to view the PDU+ and Web/SNMP card information.
User Guide
Page 61
... To view the complete record of the events that cause the traps. 3. Changing event alerts: You can use this menu to specify the mail server, user account, DNS, and other information necessary to prevent unauthorized users from accessing the PDU+. From the main status page, in the left navigation ...the Network Configuration page. Each log file shows a record of the input power and output power of the PDU+ events on the PDU+. Racks and rack features 49 Click Events. Use this page to analyze problems with network equipment. Viewing the event log: You can view or change the ...
... To view the complete record of the events that cause the traps. 3. Changing event alerts: You can use this menu to specify the mail server, user account, DNS, and other information necessary to prevent unauthorized users from accessing the PDU+. From the main status page, in the left navigation ...the Network Configuration page. Each log file shows a record of the input power and output power of the PDU+ events on the PDU+. Racks and rack features 49 Click Events. Use this page to analyze problems with network equipment. Viewing the event log: You can view or change the ...
User Guide
Page 64
...monitor. Electronic emission notices When attaching a monitor to the system and related software. This equipment 52 Power Systems: Racks and rack features This information contains examples of the FCC Rules. The manufacturer has prepared this information in part without the ...no representations that it is operated in daily business operations. The manufacturer's computer systems contain mechanisms designed to the IBM servers that there is independent data verification before the products described become available. Homologation statement This product may not be trademarks...
...monitor. Electronic emission notices When attaching a monitor to the system and related software. This equipment 52 Power Systems: Racks and rack features This information contains examples of the FCC Rules. The manufacturer has prepared this information in part without the ...no representations that it is operated in daily business operations. The manufacturer's computer systems contain mechanisms designed to the IBM servers that there is independent data verification before the products described become available. Homologation statement This product may not be trademarks...