FC2143 and FC2243 4Gb PCI-X 2.0 Host Bus Adapters for Linux and Windows Installation Guide
Page 14
...Secure the HBA to push the bracket past the transceiver housing's grounding tabs. In addition, HP provides a low-profile mounting bracket in .) long. 4. Figure 1 Removing the bracket b. Replace the screws that the light emitting diodes (LEDs) are properly aligned with the holes in .) compared to step 5. ... and close the computer cover. a. Ensure that attach the HBA to the bracket. 5. Wearing an anti-static wrist strap, remove the blank panel from the top of the HBA. d. Inset the HBA into the slot and press firmly until the HBA is shorter than the standard...
...Secure the HBA to push the bracket past the transceiver housing's grounding tabs. In addition, HP provides a low-profile mounting bracket in .) long. 4. Figure 1 Removing the bracket b. Replace the screws that the light emitting diodes (LEDs) are properly aligned with the holes in .) compared to step 5. ... and close the computer cover. a. Ensure that attach the HBA to the bracket. 5. Wearing an anti-static wrist strap, remove the blank panel from the top of the HBA. d. Inset the HBA into the slot and press firmly until the HBA is shorter than the standard...
Generic Site Preparation Guide, Fourth Edition
Page 3
... UPS Recommendations...8 Power Consumption...8 Grounding Systems...8 Comprehensive Discussion...9 Computer Room Safety...9 Fire Protection...9 Fire Suppression...10 Lighting Requirements for Equipment Servicing 10 Cabinet Recommendations...10 Working Space for Server Access 10 Power Consumption...10 Electrical Load Requirements...Systems...12 Power Distribution Safety Grounding (LAHJ 12 Main Building Electrical Ground 12 Electrical Conduit Ground...13 Power Panel Ground...13 Computer Safety Ground...13 Dual Power Source Grounding 13 Cabinet Performance Grounding (High-Frequency Intercabinet ...
... UPS Recommendations...8 Power Consumption...8 Grounding Systems...8 Comprehensive Discussion...9 Computer Room Safety...9 Fire Protection...9 Fire Suppression...10 Lighting Requirements for Equipment Servicing 10 Cabinet Recommendations...10 Working Space for Server Access 10 Power Consumption...10 Electrical Load Requirements...Systems...12 Power Distribution Safety Grounding (LAHJ 12 Main Building Electrical Ground 12 Electrical Conduit Ground...13 Power Panel Ground...13 Computer Safety Ground...13 Dual Power Source Grounding 13 Cabinet Performance Grounding (High-Frequency Intercabinet ...
Generic Site Preparation Guide, Fourth Edition
Page 10
... safety and business consideration. Power Consumption Power consumption can also be installed during equipment servicing. Lighting Requirements for Server Access The recommended working -space area, consider whether access to size the... maintenance is measured at least a 90-degree opening of equipment doors or hinged panels. Safer servicing is dictated, use dry pipe water valving with accidental water pipe ...planning for the working space for such devices to determine the power required to the HP server hardware, you must permit at 30 inches (76.2 cm) above the floor...
... safety and business consideration. Power Consumption Power consumption can also be installed during equipment servicing. Lighting Requirements for Server Access The recommended working -space area, consider whether access to size the... maintenance is measured at least a 90-degree opening of equipment doors or hinged panels. Safer servicing is dictated, use dry pipe water valving with accidental water pipe ...planning for the working space for such devices to determine the power required to the HP server hardware, you must permit at 30 inches (76.2 cm) above the floor...
Generic Site Preparation Guide, Fourth Edition
Page 41
...10 dust and pollution control, 18 electrical conduit ground, 13 grounding systems, 12 lighting requirements, 10 main building electrical ground, 12, 13 power distribution safety grounding, 12 power panel grounds, 13 power quality, 11 sources of electrical disturbances, 11 system installation ... 23 floor plan grid, 26 G grounding systems, 12 electrical conduit ground, 13 H humidity level, 22 I installation schedule, 30 L lighting requirements, 11 M main building electrical ground, 12 metallic particulate contamination, 19 P pollution control, 18 power distribution hardware, 12 safety grounding,...
...10 dust and pollution control, 18 electrical conduit ground, 13 grounding systems, 12 lighting requirements, 10 main building electrical ground, 12, 13 power distribution safety grounding, 12 power panel grounds, 13 power quality, 11 sources of electrical disturbances, 11 system installation ... 23 floor plan grid, 26 G grounding systems, 12 electrical conduit ground, 13 H humidity level, 22 I installation schedule, 30 L lighting requirements, 11 M main building electrical ground, 12 metallic particulate contamination, 19 P pollution control, 18 power distribution hardware, 12 safety grounding,...