Question posted by dalesmith196 on August 21st, 2013
Super Inspected. Line Man Refused Hook Up Box. Why?
Line man did not enter yard at 10p.m. But reported the pole was not on the house . It's on the house. Why is he lying? It's been on the house for 2 months waiting hook up. We believe the company is not hooking up line so they can rack up cost when they finally do their job. This is unprofessional. And will call the news station tomorrow about this.
Current Answers
Similar Questions
I'm In Zip Number 48039. Can We Use A Generlink? Who Can Hook It Up, Does Dte
have to be notified first? Does power from the pole have to be disconnected?
have to be notified first? Does power from the pole have to be disconnected?
(Posted by Dtessmer44 1 year ago)
Power Saving
I was wondering if you install generlink and or some other kind of external house power bypass switc...
I was wondering if you install generlink and or some other kind of external house power bypass switc...
(Posted by smithrandy23 2 years ago)
80 Ft Blue Spice In Easement That Presents A Possible Power Outage. Transformer,
I would like someone to look at a tree in my backyard that presents a potential problem with power l...
I would like someone to look at a tree in my backyard that presents a potential problem with power l...
(Posted by casemcase 7 years ago)
Dte Refusing To Help Remove A Fraudulent Account From Our Credit, Who Can Help U
We have been trying to reach a DTE representative who can help us remove a fraudulent account that D...
We have been trying to reach a DTE representative who can help us remove a fraudulent account that D...
(Posted by reneenarvaez 10 years ago)
Where Do I Apply For A Job With Dte Energy?
I am interested in working for DTE Energy. Where can I find DTE Energy career and job openings?
I am interested in working for DTE Energy. Where can I find DTE Energy career and job openings?
(Posted by Anonymous-22732 14 years ago)