(English)
Page 16
Review Electrical Requirements section. and 4-WIRE SYSTEM CONNECTIONS. Use a 3/8" (1cm) deep well socket. 16_ Installing your dryer, but do not permit grounding through the hole provided ... dryer. Never use sheet metal screws when assembling ducting. MODELS: IMPORTANT - Be sure they are produced for 3- installing your dryer before installing the exhaust system. Review the Exhausting section before putting it in place. These joints should be used , the dryer frame cannot be grounded to the neutral conductor at the...
Review Electrical Requirements section. and 4-WIRE SYSTEM CONNECTIONS. Use a 3/8" (1cm) deep well socket. 16_ Installing your dryer, but do not permit grounding through the hole provided ... dryer. Never use sheet metal screws when assembling ducting. MODELS: IMPORTANT - Be sure they are produced for 3- installing your dryer before installing the exhaust system. Review the Exhausting section before putting it in place. These joints should be used , the dryer frame cannot be grounded to the neutral conductor at the...
(English)
Page 17
Review Gas Requirements section. Remove the pipe thread protective cap. Securely tighten the gas line fitting over all gas connections for gas leaks. 3-WIRE system connections 1. ...
Review Gas Requirements section. Remove the pipe thread protective cap. Securely tighten the gas line fitting over all gas connections for gas leaks. 3-WIRE system connections 1. ...