MATDCBB Green Control Board V.6.4 or newer Manual
Page 13
... . BATTERY HANDLING / STORAGE Refer to up position 2. ADVERTENCIA ADVERTENCIA PRECAUCIÓN ADVERTENCIA 13 Drive out pin pieces with Liftmaster P/N MBAT batteries. However, to insure proper and safe operation, it must be done by taping on the Control Board Layout page...Battery, Standard"). Charge voltage for battery replacement. SHEAR PIN REPLACEMENT If gate arm is vandalized and the tapered pin in the output shaft has been sheared, it is a 2" pin with State, Local and Federal Regulations. Use S-3 to rotate bracket to the battery manufacturer's Material Safety Data...
... . BATTERY HANDLING / STORAGE Refer to up position 2. ADVERTENCIA ADVERTENCIA PRECAUCIÓN ADVERTENCIA 13 Drive out pin pieces with Liftmaster P/N MBAT batteries. However, to insure proper and safe operation, it must be done by taping on the Control Board Layout page...Battery, Standard"). Charge voltage for battery replacement. SHEAR PIN REPLACEMENT If gate arm is vandalized and the tapered pin in the output shaft has been sheared, it is a 2" pin with State, Local and Federal Regulations. Use S-3 to rotate bracket to the battery manufacturer's Material Safety Data...