Owners Manual
Page 10
.... 3. Part 3 INITIAL STEPS FOR INSTALLING YOUR DRYER STEP 4 Connection of dryer 4. Use this manual's section entitled Gas Requirements and Instructions. 10 STEP 5 Electrical Plug Connections for Natural Gas with a non-corrosive leak detection fluid. 5. Equipment Shut-Off Valve- Use 1/2" pipe. 5. 3/8" N.P.T. Securely tighten all wires prior to disconnection when servicing the dryer, because wiring...
.... 3. Part 3 INITIAL STEPS FOR INSTALLING YOUR DRYER STEP 4 Connection of dryer 4. Use this manual's section entitled Gas Requirements and Instructions. 10 STEP 5 Electrical Plug Connections for Natural Gas with a non-corrosive leak detection fluid. 5. Equipment Shut-Off Valve- Use 1/2" pipe. 5. 3/8" N.P.T. Securely tighten all wires prior to disconnection when servicing the dryer, because wiring...
Owners Manual
Page 20
...than 2/1 psi (3.45 kPa). 5. WARNING! • Use a new AGA or CSA approved gas supply line. • Install a shut-off valve, during any disassembly requires the attention and tools of gas shown on the nameplate; • Use new flexible stainless steel connectors; • Use Teflon... tape and pipe joint compound insoluble in order to prevent gas valve contamination, before connecting the gas supply to inspect for gas dryers. ! If acceptable under local codes and ordinances and when acceptable to or less than 20 feet (6.1m...
...than 2/1 psi (3.45 kPa). 5. WARNING! • Use a new AGA or CSA approved gas supply line. • Install a shut-off valve, during any disassembly requires the attention and tools of gas shown on the nameplate; • Use new flexible stainless steel connectors; • Use Teflon... tape and pipe joint compound insoluble in order to prevent gas valve contamination, before connecting the gas supply to inspect for gas dryers. ! If acceptable under local codes and ordinances and when acceptable to or less than 20 feet (6.1m...