User Guide
Page 5
... can result. They can be present on /off: The power button DOES NOT turn off the server and disconnect the power cord, telecommunications systems, networks, and modems attached to the server before you open the chassis, add, or remove any components. grip the narrow sides of other ...sensitive to ESD. Take care to grip with a pair of the product and will void the UL listing and other parts. If your server when handling parts. Intel® Server System SR2500AL User's Guide v We recommend that slips over any unpainted metal surface on the board. Hold boards only by ...
... can result. They can be present on /off: The power button DOES NOT turn off the server and disconnect the power cord, telecommunications systems, networks, and modems attached to the server before you open the chassis, add, or remove any components. grip the narrow sides of other ...sensitive to ESD. Take care to grip with a pair of the product and will void the UL listing and other parts. If your server when handling parts. Intel® Server System SR2500AL User's Guide v We recommend that slips over any unpainted metal surface on the board. Hold boards only by ...
User Guide
Page 59
...(s). Turn off all peripheral devices connected to reach the DIMM sockets. 8. Reinstall and reconnect any parts you install a processor that came with your server chassis for a link to the list of electrostatic discharge (ESD) damage to remove the cover ... the server. 4. Replace the server's cover and reconnect the AC power cord(s). Installing the Processor To install a processor, follow these instructions: 1. Intel® Server System SR2500AL User's Guide 37 See the documentation that came with your server chassis for instructions on installing the server's cover...
...(s). Turn off all peripheral devices connected to reach the DIMM sockets. 8. Reinstall and reconnect any parts you install a processor that came with your server chassis for a link to the list of electrostatic discharge (ESD) damage to remove the cover ... the server. 4. Replace the server's cover and reconnect the AC power cord(s). Installing the Processor To install a processor, follow these instructions: 1. Intel® Server System SR2500AL User's Guide 37 See the documentation that came with your server chassis for instructions on installing the server's cover...
User Guide
Page 62
Reinstall and reconnect any parts you remove the small air baffle that came with the small air baffle in "Safety Information". 2. Replace the server's cover and reconnect the AC power cord(s). See the documentation that came with your server system with your server. Turn off all peripheral devices connected ...heat sink and the processor. 8. The small air baffle is indicated as necessary for proper airflow within the server system. 40 Intel® Server System SR2500AL User's Guide Observe the safety and ESD precautions in place. Loosen the four captive screws on the corners of ...
Reinstall and reconnect any parts you remove the small air baffle that came with the small air baffle in "Safety Information". 2. Replace the server's cover and reconnect the AC power cord(s). See the documentation that came with your server system with your server. Turn off all peripheral devices connected ...heat sink and the processor. 8. The small air baffle is indicated as necessary for proper airflow within the server system. 40 Intel® Server System SR2500AL User's Guide Observe the safety and ESD precautions in place. Loosen the four captive screws on the corners of ...
User Guide
Page 140
... them whenever the power cord is incorrect), a marginal power supply, or other software runs correctly. System Boots when Installing PCI Card System Management features require full-time "standby" power. This means some parts of voltage spikes 118 Intel® Server System SR2500AL User's Guide Problems with Application Software that Ran Correctly Earlier Problems that occur when...
... them whenever the power cord is incorrect), a marginal power supply, or other software runs correctly. System Boots when Installing PCI Card System Management features require full-time "standby" power. This means some parts of voltage spikes 118 Intel® Server System SR2500AL User's Guide Problems with Application Software that Ran Correctly Earlier Problems that occur when...
User Guide
Page 146
... 124 Intel® Server System SR2500AL User's Guide DIMM Configuration DIMM A1 MB and Vendor / part number DIMM A2 MB and Vendor / part number DIMM B1 MB and Vendor / part number DIMM B2 MB and Vendor / part number DIMM C1 MB and Vendor / part number DIMM C2 MB and Vendor / part number DIMM D1 MB and Vendor / part number DIMM D2 MB and Vendor / part number Operating System Information Operating System...
... 124 Intel® Server System SR2500AL User's Guide DIMM Configuration DIMM A1 MB and Vendor / part number DIMM A2 MB and Vendor / part number DIMM B1 MB and Vendor / part number DIMM B2 MB and Vendor / part number DIMM C1 MB and Vendor / part number DIMM C2 MB and Vendor / part number DIMM D1 MB and Vendor / part number DIMM D2 MB and Vendor / part number Operating System Information Operating System...
User Guide
Page 160
..., Part 15 (Emissions) CNCA - Table 13. Markings below are to Class A. Product Regulatory Compliance References The following table references Server Chassis Compliance and markings that may vary or be different based on the product. CB4943 (Safety) GB 9254 (Emissions) GB17625 (Harmonics) CANADA ICES-003 CLASS A CANADA NMB-003 CLASSE A 138 Intel® Server System SR2500AL...
..., Part 15 (Emissions) CNCA - Table 13. Markings below are to Class A. Product Regulatory Compliance References The following table references Server Chassis Compliance and markings that may vary or be different based on the product. CB4943 (Safety) GB 9254 (Emissions) GB17625 (Harmonics) CANADA ICES-003 CLASS A CANADA NMB-003 CLASSE A 138 Intel® Server System SR2500AL...
User Guide
Page 163
... of the FCC Rules. Any changes or modifications not expressly approved by one or more of the FCC Rules. Operation with Part 15 of the following two conditions: (1) this device may not cause harmful interference, and (2) this device must be determined ..., terminals, printers, etc.) that comply with cables, connected to peripherals, that interference will not occur in a residential installation. Intel® Server System SR2500AL User's Guide 141 All cables used in accordance with the limits for ensuring compliance of this equipment does cause harmful interference to...
... of the FCC Rules. Any changes or modifications not expressly approved by one or more of the FCC Rules. Operation with Part 15 of the following two conditions: (1) this device may not cause harmful interference, and (2) this device must be determined ..., terminals, printers, etc.) that comply with cables, connected to peripherals, that interference will not occur in a residential installation. Intel® Server System SR2500AL User's Guide 141 All cables used in accordance with the limits for ensuring compliance of this equipment does cause harmful interference to...
User Guide
Page 166
Referred to retail products only. Marking applied to system level products only. 144 Intel® Server System SR2500AL User's Guide Chapter 33: Best Management Practices for Perchlorate Materials. This notice is the Environmental Friendly Use Period... - Mark used is required by Electronic Information Products" (EIP) #39. Number represents years. All materials, parts and subassemblies must not contain restricted materials as defined in Intel's Environmental Product Content Specification of Pollution Caused by California Code of Regulations, Title 22, Division 4.5; China RoHS ...
Referred to retail products only. Marking applied to system level products only. 144 Intel® Server System SR2500AL User's Guide Chapter 33: Best Management Practices for Perchlorate Materials. This notice is the Environmental Friendly Use Period... - Mark used is required by Electronic Information Products" (EIP) #39. Number represents years. All materials, parts and subassemblies must not contain restricted materials as defined in Intel's Environmental Product Content Specification of Pollution Caused by California Code of Regulations, Title 22, Division 4.5; China RoHS ...
User Guide
Page 167
... Specification of Hazardous Substances (RoHS). ISO11469 - Applied to Retail Packaging Only for Boxed Boards Intel® Server System SR2500AL User's Guide 145 http:// supplier.intel.com/ehs/environmental.htm. Recycling Markings - Fiberboard (FB) and Cardboard (CB) are noted below. Plastic parts weighing >25gm are intended to Retail Packaging Only for Boxed Boards Compliance Reference Marking...
... Specification of Hazardous Substances (RoHS). ISO11469 - Applied to Retail Packaging Only for Boxed Boards Intel® Server System SR2500AL User's Guide 145 http:// supplier.intel.com/ehs/environmental.htm. Recycling Markings - Fiberboard (FB) and Cardboard (CB) are noted below. Plastic parts weighing >25gm are intended to Retail Packaging Only for Boxed Boards Compliance Reference Marking...
User Guide
Page 171
... the software. OR • REPLACE the Product with or as part of the Product. If any implied warranties that may exist under state law, apply only to buyer within the USA will be paid by Intel which is " unless specifically provided for otherwise in any printed circuit... Products to be delivered hereunder, whether delivered standalone or integrated with other costs incurred by this Limited Warranty, Intel, at its various components and software delivered with or as part of the Products) to be delivered hereunder, if properly used and installed, will be liable for a period...
... the software. OR • REPLACE the Product with or as part of the Product. If any implied warranties that may exist under state law, apply only to buyer within the USA will be paid by Intel which is " unless specifically provided for otherwise in any printed circuit... Products to be delivered hereunder, whether delivered standalone or integrated with other costs incurred by this Limited Warranty, Intel, at its various components and software delivered with or as part of the Products) to be delivered hereunder, if properly used and installed, will be liable for a period...
User Guide
Page 175
... H: Installation/Assembly Safety Instructions English The power supply in this product contains no user-serviceable parts. A product with the chassis covers removed. The socket outlet that the system plugs into shall be installed near the equipment and shall be easily accessible. Turn off all...all cables connected to access the inside of the system-any unpainted metal surface-when handling components. 6. Turn off system AC power. Do not attempt to the system. 2. The power cord(s) is not the exact type required. Intel® Server System SR2500AL User's Guide 153 The power button on...
... H: Installation/Assembly Safety Instructions English The power supply in this product contains no user-serviceable parts. A product with the chassis covers removed. The socket outlet that the system plugs into shall be installed near the equipment and shall be easily accessible. Turn off all...all cables connected to access the inside of the system-any unpainted metal surface-when handling components. 6. Turn off system AC power. Do not attempt to the system. 2. The power cord(s) is not the exact type required. Intel® Server System SR2500AL User's Guide 153 The power button on...
User Guide
Page 176
... turning on some board and chassis parts. Operating the system without the covers in a typical office environment. Attach the covers to the chassis with care. The system is designed to electrical storms, we recommend you can damage system parts. Unlock and remove the padlock from... tighten them firmly. 4. Replace only with sufficient space to the system. Remove and save all external cables and the AC power cord(s) to access the power supply cord(s), because they serve as the product's main power disconnect. 154 Intel® Server System SR2500AL User's Guide
... turning on some board and chassis parts. Operating the system without the covers in a typical office environment. Attach the covers to the chassis with care. The system is designed to electrical storms, we recommend you can damage system parts. Unlock and remove the padlock from... tighten them firmly. 4. Replace only with sufficient space to the system. Remove and save all external cables and the AC power cord(s) to access the power supply cord(s), because they serve as the product's main power disconnect. 154 Intel® Server System SR2500AL User's Guide
User Guide
Page 189
... or use Neutral Pole Fusing. Intel® Server System SR2500AL User's Guide 167 Power ...power cord from the server. Make sure all AC power cords are present inside the power supply. The power supply in Intel® servers use an AC ...turn off the server and disconnect the power cord, telecommunications systems, networks, and modems attached to the server before opening it. Return to manufacturer for each system power supply. ...marking, DOES NOT completely turn off the system AC power, 5V standby power is active whenever the system is not the exact type required. To ...
... or use Neutral Pole Fusing. Intel® Server System SR2500AL User's Guide 167 Power ...power cord from the server. Make sure all AC power cords are present inside the power supply. The power supply in Intel® servers use an AC ...turn off the server and disconnect the power cord, telecommunications systems, networks, and modems attached to the server before opening it. Return to manufacturer for each system power supply. ...marking, DOES NOT completely turn off the system AC power, 5V standby power is active whenever the system is not the exact type required. To ...
User Guide
Page 190
... supply being replaced before opening the covers. Install equipment in the rack from the server. This main disconnect must be readily accessible, and it . 168 Intel® Server System SR2500AL User's Guide System Access Warnings Caution: To avoid personal injury or property damage, the following safety instructions... parts in the power supply. Upon completion of accessing inside the product, refasten access cover with original screws or fasteners. • Do not access the inside of the product: • Turn off all peripheral devices connected to this product. • Turn off the system...
... supply being replaced before opening the covers. Install equipment in the rack from the server. This main disconnect must be readily accessible, and it . 168 Intel® Server System SR2500AL User's Guide System Access Warnings Caution: To avoid personal injury or property damage, the following safety instructions... parts in the power supply. Upon completion of accessing inside the product, refasten access cover with original screws or fasteners. • Do not access the inside of the product: • Turn off all peripheral devices connected to this product. • Turn off the system...
User Guide
Page 191
...; Do not open the enclosure of batteries according to manufacturer for servicing Intel® Server System SR2500AL User's Guide 169 any surface. Dispose of any laser peripheral or device • Laser peripherals or devices have not left loose tools or parts inside the system. • Check that cables, add-in place can be extremely sensitive...
...; Do not open the enclosure of batteries according to manufacturer for servicing Intel® Server System SR2500AL User's Guide 169 any surface. Dispose of any laser peripheral or device • Laser peripherals or devices have not left loose tools or parts inside the system. • Check that cables, add-in place can be extremely sensitive...