Generic Site Preparation Guide, Third Edition
Page 29
Conversion Factors • Refrigeration - 1 watt = 0.86 kcal/hour - 1 watt = 3.412 Btu/hour - 1 watt = 2.843 × 10-4 tons - 1 ton = 200 Btu/minute - 1 ton = 12,000 Btu/hour - 1 ton = 3,517.2 watts • Metric Equivalents - 1 centimeter = 0.3937 inch - 1 meter = 3.28 foot - 1 meter = 1.09 yards - 1 in determining ...and Formulas 29 Figure 1-11 GB 1002 Plug Power Cable The power cable length and configuration varies based on the region the server ships to the configurations listed in this guide. Figure 1-12 L6-20 Power Cable Conversion Factors and Formulas The conversion factors ...
Conversion Factors • Refrigeration - 1 watt = 0.86 kcal/hour - 1 watt = 3.412 Btu/hour - 1 watt = 2.843 × 10-4 tons - 1 ton = 200 Btu/minute - 1 ton = 12,000 Btu/hour - 1 ton = 3,517.2 watts • Metric Equivalents - 1 centimeter = 0.3937 inch - 1 meter = 3.28 foot - 1 meter = 1.09 yards - 1 in determining ...and Formulas 29 Figure 1-11 GB 1002 Plug Power Cable The power cable length and configuration varies based on the region the server ships to the configurations listed in this guide. Figure 1-12 L6-20 Power Cable Conversion Factors and Formulas The conversion factors ...
Generic Site Preparation Guide, Third Edition
Page 30
...used to measure your progress. 30 General Site Preparation Guidelines Special delivery requirements are completed. - Sometimes a server is made with an HP site preparation specialist to resolve any last-minute problems. NOTE: Not all installations follow a schedule like the .../ 1000 • Single phase kVA = V × A / 1000 Formulas • kVA = voltage × current (amps) • Watts = VA × PF • Btu = Watts × 3.41 • ºC = (32 + 1.8a) ºF Example of an Installation Schedule The following this schedule. Delivery survey is completed. See Table 1-6 and...
...used to measure your progress. 30 General Site Preparation Guidelines Special delivery requirements are completed. - Sometimes a server is made with an HP site preparation specialist to resolve any last-minute problems. NOTE: Not all installations follow a schedule like the .../ 1000 • Single phase kVA = V × A / 1000 Formulas • kVA = voltage × current (amps) • Watts = VA × PF • Btu = Watts × 3.41 • ºC = (32 + 1.8a) ºF Example of an Installation Schedule The following this schedule. Delivery survey is completed. See Table 1-6 and...
Generic Site Preparation Guide, Third Edition
Page 35
... an air-conditioning system to the 60-Hz current, which is contained in the unit itself. Glossary A-B apparent power ASHRAE Standard 52-76 ASL board Btu/h A value of power for air filtration efficiency set forth by the American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Inc. Industry-standard term for...
... an air-conditioning system to the 60-Hz current, which is contained in the unit itself. Glossary A-B apparent power ASHRAE Standard 52-76 ASL board Btu/h A value of power for air filtration efficiency set forth by the American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Inc. Industry-standard term for...
Generic Site Preparation Guide, Third Edition
Page 36
... windows) into the room. 36 Glossary Essentially, a vapor seal is a barrier that may be caused by Intel® and introduced in 1 hour and 12,000 Btu/h equals 1 ton of a given configuration, assuming worst-case conditions (thermal tolerances, work loads, and so forth) on the function representing the AC waveform: (1) The square...
... windows) into the room. 36 Glossary Essentially, a vapor seal is a barrier that may be caused by Intel® and introduced in 1 hour and 12,000 Btu/h equals 1 ton of a given configuration, assuming worst-case conditions (thermal tolerances, work loads, and so forth) on the function representing the AC waveform: (1) The square...
Site Preparation Guide, Second Edition - hp rp7405/rp7410 Servers
Page 26
...Mass Storage Devices and the PCI Card Cage provide airflow through the PCI Card Cage. Air Flow The hp rp7405/rp7410 servers require that the cabinet air intake temperature be taken to understand the acoustic noise specifications relative to help reduce... 8 8 4 8 4 8 Qty 2 0 0 0 Qty 4 2 2 1 Qty 2 2 2 1 Qty 2 2 2 2 Watts 2000 1810 1757 1148 BTU/Hr 6826 6179 5998 3919 Acoustic Noise Specification The acoustic noise specification for the hp rp7410 server is appropriate for dedicated computer room environments, not office environments. The PCI fans are powered off of housekeeping...
...Mass Storage Devices and the PCI Card Cage provide airflow through the PCI Card Cage. Air Flow The hp rp7405/rp7410 servers require that the cabinet air intake temperature be taken to understand the acoustic noise specifications relative to help reduce... 8 8 4 8 4 8 Qty 2 0 0 0 Qty 4 2 2 1 Qty 2 2 2 1 Qty 2 2 2 2 Watts 2000 1810 1757 1148 BTU/Hr 6826 6179 5998 3919 Acoustic Noise Specification The acoustic noise specification for the hp rp7410 server is appropriate for dedicated computer room environments, not office environments. The PCI fans are powered off of housekeeping...