Heat Pro
Page 10
...-by-step instructions 1. A bypass and shut-off should be placed before or upstream from the heat pump. 4. A 1/3 lb check valve must be installed between the heater and any system with over a 3/4 HP pool pump. (see FIG.3 for ease of metal), the heater, any automatic chlorine generator, and any ...other , and then to 8 foot solid copper rod must be driven into the ground near the equipment. CAUTION Because all metals have different electrical ...
...-by-step instructions 1. A bypass and shut-off should be placed before or upstream from the heat pump. 4. A 1/3 lb check valve must be installed between the heater and any system with over a 3/4 HP pool pump. (see FIG.3 for ease of metal), the heater, any automatic chlorine generator, and any ...other , and then to 8 foot solid copper rod must be driven into the ground near the equipment. CAUTION Because all metals have different electrical ...