User Manual
Page 5
... plate,hold up the body aslant from the underside and then put it down perpendicularly. When bending, be bound with refrigerant piping by protecting tape. [Other direction piping] Cut away, with refrigerant oil and connect pipes. Fixing the indoor unit body Hang surely the unit body onto the upper notches of connecting...
... plate,hold up the body aslant from the underside and then put it down perpendicularly. When bending, be bound with refrigerant piping by protecting tape. [Other direction piping] Cut away, with refrigerant oil and connect pipes. Fixing the indoor unit body Hang surely the unit body onto the upper notches of connecting...
User Manual
Page 8
... be removed by 90o using hexagon wrench, and after approx.10 sec tighten it up. Piping length Additional amount for first installation, this procedure, 50g refrigerant will be discharged in piping. (This must be added per exceeding meter. Length: 10m A Oil trap for 9K : A=7m for 12K : A=...(9K) or 10m(12K). Gas comes out through flare nut on the valves with specified torque. (4) Open 2-way and 3-way valves using external refrigerant gas, charge according to purge air in pipes. Only for 9k 12k 5m 7m No need 40g 10m 100g 2-way valve 6.35mm(1/4") 3-way valve...
... be removed by 90o using hexagon wrench, and after approx.10 sec tighten it up. Piping length Additional amount for first installation, this procedure, 50g refrigerant will be discharged in piping. (This must be added per exceeding meter. Length: 10m A Oil trap for 9K : A=7m for 12K : A=...(9K) or 10m(12K). Gas comes out through flare nut on the valves with specified torque. (4) Open 2-way and 3-way valves using external refrigerant gas, charge according to purge air in pipes. Only for 9k 12k 5m 7m No need 40g 10m 100g 2-way valve 6.35mm(1/4") 3-way valve...