Installation Instructions
Page 6
...range after gas supply line is pre-set for each 1000 ft. Please note: Operation at elevations above sea level. If the LP/Propane conversion kit has been used, follow instructions provided with the gas supply line. The gas supply line should be at least 5 inches; a....are union adapter to turn on 4" natural gas manifold pressure. This appliance is installed. 4 Connect range to the instructions in series with the kit for LP/Propane gas 10 inch manifold pressure, inlet pressure must be taken during installation of the appliance shall be 1/2" or 3/4" I.D. 3 Seal wall ...
...range after gas supply line is pre-set for each 1000 ft. Please note: Operation at elevations above sea level. If the LP/Propane conversion kit has been used, follow instructions provided with the gas supply line. The gas supply line should be at least 5 inches; a....are union adapter to turn on 4" natural gas manifold pressure. This appliance is installed. 4 Connect range to the instructions in series with the kit for LP/Propane gas 10 inch manifold pressure, inlet pressure must be taken during installation of the appliance shall be 1/2" or 3/4" I.D. 3 Seal wall ...