Important Safety Information - For Server, Storage, Power, Networking, and Rack Products
Page 6
... Current" section later in this document for this document for the type of UPS products in the OFF (down) position. Disconnect all battery circuit breakers are in any single equipment rack. " Pluggable UPS products must comply with the equivalent local and national wiring regulations. ! ...overload the output of electric shock and/or equipment damage when installing or servicing PDUs: ! In other metal objects prior to test the batteries. Power Distribution Units (PDUs) To reduce the risk of the PDU. Pluggable PDUs must comply with insulated handles. " Do not operate...
... Current" section later in this document for this document for the type of UPS products in the OFF (down) position. Disconnect all battery circuit breakers are in any single equipment rack. " Pluggable UPS products must comply with the equivalent local and national wiring regulations. ! ...overload the output of electric shock and/or equipment damage when installing or servicing PDUs: ! In other metal objects prior to test the batteries. Power Distribution Units (PDUs) To reduce the risk of the PDU. Pluggable PDUs must comply with insulated handles. " Do not operate...
Important Safety Information - For Server, Storage, Power, Networking, and Rack Products
Page 7
...to the building power, the total combined leakage current should not exceed 3.5mA. English 1-5 Earth Leakage Current To reduce the risk of batteries with the general household waste. Voltage Selection ! Obtain adequate assistance to temperatures higher than 60°C (140°F). ! For UPS ...that have attached AC power cords or are extended to power the product with the rails may contain internal lithium manganese dioxide batteries or vanadium pentoxide batteries. Do not attempt to the floor. ! Only one component is extended at a time. A rack may become unstable ...
...to the building power, the total combined leakage current should not exceed 3.5mA. English 1-5 Earth Leakage Current To reduce the risk of batteries with the general household waste. Voltage Selection ! Obtain adequate assistance to temperatures higher than 60°C (140°F). ! For UPS ...that have attached AC power cords or are extended to power the product with the rails may contain internal lithium manganese dioxide batteries or vanadium pentoxide batteries. Do not attempt to the floor. ! Only one component is extended at a time. A rack may become unstable ...
SMART-2DH Array Controller Reference Guide
Page 12
... Wide-Ultra SCSI, Fast-Wide SCSI-2, and Fast-SCSI-2. NEED TO KNOW REQUIRED a 16-bit, 20-MHz bus providing a 40- battery-backed 16-MB Read/Write Cache with many advanced features. Mbytes/sec data transfer rate s Support for Wide-Ultra SCSI, Fast-Wide SCSI-2,... with the SMART-2DH Array Controller is a dual-channel, 32-bit array controller with ECC (Error Checking and Correcting) memory s Performance monitoring through Compaq Insight Manager s Automatic performance tuning s Pre-failure notification s Read-ahead caching s Tagged command queuing s Multiple logical drives per channel) s Wide-Ultra...
... Wide-Ultra SCSI, Fast-Wide SCSI-2, and Fast-SCSI-2. NEED TO KNOW REQUIRED a 16-bit, 20-MHz bus providing a 40- battery-backed 16-MB Read/Write Cache with many advanced features. Mbytes/sec data transfer rate s Support for Wide-Ultra SCSI, Fast-Wide SCSI-2,... with the SMART-2DH Array Controller is a dual-channel, 32-bit array controller with ECC (Error Checking and Correcting) memory s Performance monitoring through Compaq Insight Manager s Automatic performance tuning s Pre-failure notification s Read-ahead caching s Tagged command queuing s Multiple logical drives per channel) s Wide-Ultra...
SMART-2DH Array Controller Reference Guide
Page 17
...in the cache is located on your part. During server power up to the replacement Array controller. It may take up with discharged Array Accelerator batteries, Power-On Self-Test (POST) displays the code "1794," indicating that requires action on a removable daughter board. NEED TO KNOW REQUIRED The... Project: SMART-2DH Array Controller Reference Guide Comments: 295469-002 File Name: B-CH01.DOC Last Saved On: 2/27/98 11:23 AM COMPAQ CONFIDENTIAL - IMPORTANT: The rechargeable batteries on the drives, any valid posted-write data being held (cached) there is safe even with backup...
...in the cache is located on your part. During server power up to the replacement Array controller. It may take up with discharged Array Accelerator batteries, Power-On Self-Test (POST) displays the code "1794," indicating that requires action on a removable daughter board. NEED TO KNOW REQUIRED The... Project: SMART-2DH Array Controller Reference Guide Comments: 295469-002 File Name: B-CH01.DOC Last Saved On: 2/27/98 11:23 AM COMPAQ CONFIDENTIAL - IMPORTANT: The rechargeable batteries on the drives, any valid posted-write data being held (cached) there is safe even with backup...
SMART-2DH Array Controller Reference Guide
Page 146
...write cache and read-ahead cache, the SMART-2DH Controller Array Accelerator dramatically improves the performance of the performance without sacrificing reliability. Batteries and ECC memory protect the cache memory. SMART-2DH Array Controller Reference Guide Writer: Pamela King Project: SMART-2DH Array Controller ...Reference Guide Comments: 295469-002 File Name: K-APPD.DOC Last Saved On: 2/27/98 12:06 PM COMPAQ CONFIDENTIAL - The SMART-2DH Controller writes the data in the Array Accelerator to predict the next likely read and write commands. The...
...write cache and read-ahead cache, the SMART-2DH Controller Array Accelerator dramatically improves the performance of the performance without sacrificing reliability. Batteries and ECC memory protect the cache memory. SMART-2DH Array Controller Reference Guide Writer: Pamela King Project: SMART-2DH Array Controller ...Reference Guide Comments: 295469-002 File Name: K-APPD.DOC Last Saved On: 2/27/98 12:06 PM COMPAQ CONFIDENTIAL - The SMART-2DH Controller writes the data in the Array Accelerator to predict the next likely read and write commands. The...
SMART-2DH Array Controller Reference Guide
Page 147
...-2DH Array Controller Reference Guide Comments: 295469-002 File Name: K-APPD.DOC Last Saved On: 2/27/98 12:06 PM COMPAQ CONFIDENTIAL - and four-bit memory errors in the Array Accelerator batteries are recharged via a "trickle" charge applied while system power is possible for up to the disk drives. This ensures the...
...-2DH Array Controller Reference Guide Comments: 295469-002 File Name: K-APPD.DOC Last Saved On: 2/27/98 12:06 PM COMPAQ CONFIDENTIAL - and four-bit memory errors in the Array Accelerator batteries are recharged via a "trickle" charge applied while system power is possible for up to the disk drives. This ensures the...
SMART-2DH Array Controller Reference Guide
Page 160
...option has several unique features: s It accelerates data storage by temporarily caching the data at their slower write speeds. s It contains its own batteries to 16-MB cache. You may want to remove or replace the Array Accelerator option board if: s You want to upgrade from the ... Controller Reference Guide Comments: 295469-002 File Name: L-APPE.DOC Last Saved On: 2/27/98 12:06 PM COMPAQ CONFIDENTIAL - E-1 Appendix E Upgrading or Replacing the Array Accelerator The Compaq SMART-2DH Array Controller is no longer needed. s It may be moved to another SMART-2DH Controller to complete...
...option has several unique features: s It accelerates data storage by temporarily caching the data at their slower write speeds. s It contains its own batteries to 16-MB cache. You may want to remove or replace the Array Accelerator option board if: s You want to upgrade from the ... Controller Reference Guide Comments: 295469-002 File Name: L-APPE.DOC Last Saved On: 2/27/98 12:06 PM COMPAQ CONFIDENTIAL - E-1 Appendix E Upgrading or Replacing the Array Accelerator The Compaq SMART-2DH Array Controller is no longer needed. s It may be moved to another SMART-2DH Controller to complete...
SMART-2DH Array Controller Reference Guide
Page 162
E-3 1 3 2 Figure E-1. Disposal of the batteries or Array Accelerator module should be accomplished within compliance of the...Array Controller Reference Guide Comments: 295469-002 File Name: L-APPE.DOC Last Saved On: 2/27/98 12:06 PM COMPAQ CONFIDENTIAL - Align the plastic standoff on the bracket. Push the bracket in place (2). 3. Removing Array Accelerator Board from...on the Array Accelerator board with the slot in fire or heat above 90C, incinerate, or expose to Compaq Computer Corporation by squeezing the boards together at the connector side. 2. Be sure the connectors are fully ...
E-3 1 3 2 Figure E-1. Disposal of the batteries or Array Accelerator module should be accomplished within compliance of the...Array Controller Reference Guide Comments: 295469-002 File Name: L-APPE.DOC Last Saved On: 2/27/98 12:06 PM COMPAQ CONFIDENTIAL - Align the plastic standoff on the bracket. Push the bracket in place (2). 3. Removing Array Accelerator Board from...on the Array Accelerator board with the slot in fire or heat above 90C, incinerate, or expose to Compaq Computer Corporation by squeezing the boards together at the connector side. 2. Be sure the connectors are fully ...
SMART-2DH Array Controller Reference Guide
Page 177
...: SMART-2DH Array Controller Reference Guide Comments: 295469-002 File Name: O-APPH.DOC Last Saved On: 2/27/98 12:10 PM COMPAQ CONFIDENTIAL - Select F1 key to add the new logical drives. The logical drive configuration information has been updated to resume. 1727 Slot ...replaced. 3. If the array accelerator has been removed, you must reinstall it for the reason indicated, and will resume when Array Accelerator battery reaches full charge. 5. This message indicates that the array accelerator configuration has been updated automatically due to resume. 1764 Slot x Drive Array...
...: SMART-2DH Array Controller Reference Guide Comments: 295469-002 File Name: O-APPH.DOC Last Saved On: 2/27/98 12:10 PM COMPAQ CONFIDENTIAL - Select F1 key to add the new logical drives. The logical drive configuration information has been updated to resume. 1727 Slot ...replaced. 3. If the array accelerator has been removed, you must reinstall it for the reason indicated, and will resume when Array Accelerator battery reaches full charge. 5. This message indicates that the array accelerator configuration has been updated automatically due to resume. 1764 Slot x Drive Array...
SMART-2DH Array Controller Reference Guide
Page 185
... array. The data stored in the Array Accelerator memory. Replace the Array Accelerator or the SMART-2DH Controller. batteries are disabled. Data does not correspond to this POST message will be discontinued. Array Accelerator is temporarily disabled. ...Battery Depleted. Data in the Array Accelerator. 1796 Slot x Drive Array - Power was not restored within 36 power-on the shelf for an extended period; continued Writer: Pamela King Project: SMART-2DH Array Controller Reference Guide Comments: 295469-002 File Name: O-APPH.DOC Last Saved On: 2/27/98 12:10 PM COMPAQ...
... array. The data stored in the Array Accelerator memory. Replace the Array Accelerator or the SMART-2DH Controller. batteries are disabled. Data does not correspond to this POST message will be discontinued. Array Accelerator is temporarily disabled. ...Battery Depleted. Data in the Array Accelerator. 1796 Slot x Drive Array - Power was not restored within 36 power-on the shelf for an extended period; continued Writer: Pamela King Project: SMART-2DH Array Controller Reference Guide Comments: 295469-002 File Name: O-APPH.DOC Last Saved On: 2/27/98 12:10 PM COMPAQ...
SMART-2DH Array Controller Reference Guide
Page 192
...Guide ix Array Accelerator 1-5 battery back up 1-6 data protection D-12 ECC memory D-13 in fault-tolerant configurations D-12 installing E-3 performance enhancement D-12 removing E-2 replacing E-1 switch 4-6, E-4 switch, illustrated 4-6 upgrading from 4-MB to SMART-2DH Controller F-1 Compaq Web Site xi SMART-...D-18 example 5-14, D-16 online 1-4, D-17 procedure 5-13 with the FailSafe function 5-13 Changing fault tolerance overview 2-4 Compaq SMART SCSI Array Controller upgrading to 16-MB E-1 Array Configuration Utility controller selection box 5-17 controller settings screen 5-21 create array...
...Guide ix Array Accelerator 1-5 battery back up 1-6 data protection D-12 ECC memory D-13 in fault-tolerant configurations D-12 installing E-3 performance enhancement D-12 removing E-2 replacing E-1 switch 4-6, E-4 switch, illustrated 4-6 upgrading from 4-MB to SMART-2DH Controller F-1 Compaq Web Site xi SMART-...D-18 example 5-14, D-16 online 1-4, D-17 procedure 5-13 with the FailSafe function 5-13 Changing fault tolerance overview 2-4 Compaq SMART SCSI Array Controller upgrading to 16-MB E-1 Array Configuration Utility controller selection box 5-17 controller settings screen 5-21 create array...
Configuration and Tuning of Sybase System 11 for Microsoft Windows NT on Compaq Servers
Page 7
.... After the database is written out to detect and correct low memory situations. Checkpoints, Housekeeper and Transaction Log Writes © 1996 Compaq Computer Corporation, All Rights Reserved Doc No 143A/0596 In a properly configured and tuned Sybase SQL Server environment, no i/o activity to...the host that the write operation has completed, and writes the data to the hard drives at all times. The onboard rechargeable battery pack and mirrored memory banks guarantee data integrity at a more in very different performance characteristics. Page 4 Configuration and Tuning of ...
.... After the database is written out to detect and correct low memory situations. Checkpoints, Housekeeper and Transaction Log Writes © 1996 Compaq Computer Corporation, All Rights Reserved Doc No 143A/0596 In a properly configured and tuned Sybase SQL Server environment, no i/o activity to...the host that the write operation has completed, and writes the data to the hard drives at all times. The onboard rechargeable battery pack and mirrored memory banks guarantee data integrity at a more in very different performance characteristics. Page 4 Configuration and Tuning of ...
Compaq ProSignia 300 Servers Maintenance and Service Guide
Page 8
... Keyboard, Latin American 160648-116 * 45 Keyboard, Arabic 160648-117 * 45 Keyboard, Belgian 160648-118 * 46 Mouse 141189-201 * Ref Description Part Number MISCELLANEOUS: 47 Battery 160274-001 48 Maintenance and Service Guide 211462-001 * 49 System ROMpaq 143198-001 * 50 Option ROMpaq 142207-001 * 51 Shipping Boxes 211444-001 * 52...
... Keyboard, Latin American 160648-116 * 45 Keyboard, Arabic 160648-117 * 45 Keyboard, Belgian 160648-118 * 46 Mouse 141189-201 * Ref Description Part Number MISCELLANEOUS: 47 Battery 160274-001 48 Maintenance and Service Guide 211462-001 * 49 System ROMpaq 143198-001 * 50 Option ROMpaq 142207-001 * 51 Shipping Boxes 211444-001 * 52...
Compaq ProSignia 300 Servers Maintenance and Service Guide
Page 22
... jumper shown from INT location to EXT location (Jumper E22 from Pins 1, 2 to Pins 2, 3 CAUTION Do not attempt to remove the internal battery from the system I/O board WARNING Do not abuse, recharge, disassemble, or dispose of local regulations or returned to the system board (Header E10). ...3. Make sure that the power to water or fire. Secure battery to chassis (it is off. 2. Battery To Add or Replace External Battery 1. Disposal of the battery/clock module should be accomplished within compliance of in fire or heat above 90oC, incinerate, or ...
... jumper shown from INT location to EXT location (Jumper E22 from Pins 1, 2 to Pins 2, 3 CAUTION Do not attempt to remove the internal battery from the system I/O board WARNING Do not abuse, recharge, disassemble, or dispose of local regulations or returned to the system board (Header E10). ...3. Make sure that the power to water or fire. Secure battery to chassis (it is off. 2. Battery To Add or Replace External Battery 1. Disposal of the battery/clock module should be accomplished within compliance of in fire or heat above 90oC, incinerate, or ...
Compaq ProSignia 300 Servers Maintenance and Service Guide
Page 38
... interrupted while drive array. The data this Utility to memory. Configuration Utility to avoid data 1794 also Array Accelerator remaining in the displays.) batteries failed. to re-configure the Compaq IDA-2 without the Array Accelerator. Check that Replace the Array Array - Drive None This is Accelerator board Accelerator below 75%. Array while...
... interrupted while drive array. The data this Utility to memory. Configuration Utility to avoid data 1794 also Array Accelerator remaining in the displays.) batteries failed. to re-configure the Compaq IDA-2 without the Array Accelerator. Check that Replace the Array Array - Drive None This is Accelerator board Accelerator below 75%. Array while...
Compaq ProSignia 300 Servers Maintenance and Service Guide
Page 41
... test failed The following steps apply to 114 - xx and 202 - xx Memory system ROM checksum 202 - xx CMOS clock load data test 1. Replace the battery/clock failed module and re-test. 2. xx. 111 - Check the system configuration. 2. Replace the speaker and re-test. 3. Check switch and/or jumper settings. 4. Replace...
... test failed The following steps apply to 114 - xx and 202 - xx Memory system ROM checksum 202 - xx CMOS clock load data test 1. Replace the battery/clock failed module and re-test. 2. xx. 111 - Check the system configuration. 2. Replace the speaker and re-test. 3. Check switch and/or jumper settings. 4. Replace...
Compaq ProSignia 300 Servers Maintenance and Service Guide
Page 50
... - Replace the system board and re-test. xx error codes: 1. xx Pointing Device Interface The following steps apply for 7000 - 78 and 7000 - 79 Battery 7000 - 79 error codes. 7000 - 34 HBM BMIC 7000 - 35 HBM Video 7000 - 41 ser_int 7000 - 42 ser_int 7000 - 43 ser_ext 7000 -... - 61 7000 - 62 Voice/DTMF Internal Loopback and 7000 - 62 error codes. 7000 - 78 Host ADC Measurements Replace the Server Manager/R board battery for test failed 8601 - Chapter 3.5 Drive Array Advanced Diagnostics (DAAD) Drive Array Advanced Diagnostics (DAAD) is a DOS-based tool designed to run on...
... - Replace the system board and re-test. xx error codes: 1. xx Pointing Device Interface The following steps apply for 7000 - 78 and 7000 - 79 Battery 7000 - 79 error codes. 7000 - 34 HBM BMIC 7000 - 35 HBM Video 7000 - 41 ser_int 7000 - 42 ser_int 7000 - 43 ser_ext 7000 -... - 61 7000 - 62 Voice/DTMF Internal Loopback and 7000 - 62 error codes. 7000 - 78 Host ADC Measurements Replace the Server Manager/R board battery for test failed 8601 - Chapter 3.5 Drive Array Advanced Diagnostics (DAAD) Drive Array Advanced Diagnostics (DAAD) is a DOS-based tool designed to run on...
Compaq ProSignia 300 Servers Maintenance and Service Guide
Page 53
... level and no way to recharge them Board not attached The IDA-2 board has been configured for the latest copy of the batteries are fully charged, the array accelerator is fully operational. Check the Disable Code field Accelerator status: Unrecognized status A status returned...If the batteries have not recharged after 36 hours, replace the battery pack Battery X not fully charged The battery is currently not attached. If 75% of the batteries being below reference voltage The indicated battery pack is not an error or data loss condition. Call your Authorized Compaq Reseller for...
... level and no way to recharge them Board not attached The IDA-2 board has been configured for the latest copy of the batteries are fully charged, the array accelerator is fully operational. Check the Disable Code field Accelerator status: Unrecognized status A status returned...If the batteries have not recharged after 36 hours, replace the battery pack Battery X not fully charged The battery is currently not attached. If 75% of the batteries being below reference voltage The indicated battery pack is not an error or data loss condition. Call your Authorized Compaq Reseller for...
Compaq ProSignia 300 Servers Maintenance and Service Guide
Page 57
...The installed drive was not supplied by Compaq. Drive rebuild may need to be replaced FYI: Drive (bay) X is the only thing different between the controller and nonvolatile RAM data, this drive may be occurring. to the detection of the battery packs being at sufficient voltage The ...Otherwise run . If problems exist with the information stored in nonvolatile RAM. Allow sufficient time for the batteries to read the RIS from this drive, replace it with a Compaq drive Identify controller data did not match with CMOS The identify controller data from the array controller did not...
...The installed drive was not supplied by Compaq. Drive rebuild may need to be replaced FYI: Drive (bay) X is the only thing different between the controller and nonvolatile RAM data, this drive may be occurring. to the detection of the battery packs being at sufficient voltage The ...Otherwise run . If problems exist with the information stored in nonvolatile RAM. Allow sufficient time for the batteries to read the RIS from this drive, replace it with a Compaq drive Identify controller data did not match with CMOS The identify controller data from the array controller did not...
Compaq ProSignia 300 Servers Maintenance and Service Guide
Page 77
... Guarding Yes On-Line Spare Yes Mirrored with Data Striping (RAID 10) Yes Drive Failure Alert System LED Indicators Cache Memory for Accelerator 4 MB Mirrored Batteries Yes Battery without Power Yes Charge Trickle Chapter 5.12 NetFlex Controllers Table 5-13. Maximum Transfer Rate on Local bus 133 MB/s (Reads) Table 5-14. NetFlex-L ENET...
... Guarding Yes On-Line Spare Yes Mirrored with Data Striping (RAID 10) Yes Drive Failure Alert System LED Indicators Cache Memory for Accelerator 4 MB Mirrored Batteries Yes Battery without Power Yes Charge Trickle Chapter 5.12 NetFlex Controllers Table 5-13. Maximum Transfer Rate on Local bus 133 MB/s (Reads) Table 5-14. NetFlex-L ENET...